Fixed, e744s, Thu Apr 11 11:26:52 2019, Adrien, MUST2, General, CH2, TOF in MUST2 MM3 is now fixed ETOF_14N.pngEDE_14N.pngImpact_14N.png
The E-TOF plot in MM3 was showing a 5MeV threshold.
After investigation the 12 strip was not disable on MM2 to MM4, and particularly noisy on MM3, killing the counts at small angle where most of the proton
are.
Pending, e793s, Thu Mar 11 11:14:04 2021, Adrien, OFFLINE, General, CD2, TODO LIST for Offline analysis 
[B]Miscelanous[/B]
[LIST]
[*] Cleanup branches in npanalysis (remove old vamos branch and add MW TDC ones)
Fixed, , Thu Apr 11 05:03:13 2019, Marlène, RUN, Hardware, CH2, TO DO list 
- 2 TACS are not working: 
[LIST]
[*] T_Si_CATS1 (stop should be CATS n FAG --> to be checked)
    Fixed, e744s, Thu Apr 11 06:48:23 2019, iulian, RUN, Hardware, CH2, TO DO list run275_tacs_mugast.png
[quote="mugast"]- 2 TACS are not working: 
[LIST]
[*] T_Si_CATS1 (stop should be CATS n FAG --> to be checked). Also Ok now. Same problem as below
Fixed, e793s, Mon Mar 8 08:45:49 2021, Adrien, OFFLINE, General, N/A, TO DO LIST for 8 march 2021 
Here is a todo list for today:

[B]Data conversion:[/B]
Fixed, TEST, Thu Mar 28 14:22:25 2019, OttoRun, RUN, General, N/A, TEST 
[SIZE=5][B] Run  : 146[/B][/SIZE]
[SIZE=4]  [B] Date : 28/03/2019[/B]
Fixed, e744s, Thu Apr 11 02:53:20 2019, Marlène, RUN, General, , TAc VAMOS-CATS 
Just before RUN 68
TAC VAMOS-CATS is now in TAC CATS1-CATS2 in order to check if we see something in the online spectra.
TCATS total delay = 300 + 500 ns=800 ns
Fixed, com2019, Tue Apr 2 14:46:27 2019, Iulian, OTHER, Hardware, N/A, TACs calibration 8x
TACs calibrations have been performed:
[COLOR=orange]TAC           offset      slope[/COLOR]
Fixed, e744s, Thu Apr 11 06:38:12 2019, Diego, VAMOS, Hardware, , TACS modification 
+300 ns of delay in the HF validated signal that gives the STOP of T_FPMW_HF && T_CATS2_HF. 
Range of TAC FPMW_CATS2 increased to 1us.
Fixed, e793s, Mon Mar 22 18:15:50 2021, mugast, RUN, General, N/A, TACS calibration - run 662 
TACS:

    FAG-CATS2 (range 500 ns)
Fixed, e793s, Mon Mar 22 19:04:55 2021, mugast, RUN, General, N/A, TACS calibration - run 653 
TACS:

MUGAST-AGATA (range 2 us)
Fixed, e793s, Tue Mar 9 11:47:14 2021, Franco, RUN, General, N/A, TACS calibration TACS_calib.pngTACS_calib_fits.png
Coefficients uploaded in MUGAST/e793s/calibTACS_e793s.cal (set offsets to 0 and kept only the slope)
Fixed, e744s, Fri Apr 12 04:13:49 2019, François, Chloé, OTHER, Hardware, , TAC to do list 
TAC of 
-  MUGAST-HF : HFvalidated is suspected to come every 200ns after MUGAST, it suggests to go to a range of 500ns
-  T_SI_CATS1 : CAST1 stop comes before T_SI start (roughly 100ns to be delayed)
Fixed, e744s, Thu Apr 11 00:23:21 2019, Iulian François Marlène, RUN, Hardware, CH2, TAC changes & target 
We have inserted the 2nd target CH2 104 um.

We have changed the range of the TAC MUGAST-HF from 1us to 200ns.
Fixed, e744s, Thu Apr 18 15:40:57 2019, Valerian, RUN, Hardware, N/A, TAC calib runs 226-227 
After multiple acq issues, TAC calib done...

Calib done with 2.56us range and 0.02us period. using cable with 5+16ns lenght
Fixed, e744s, Fri Apr 12 09:25:10 2019, Marlène, ONLINE, General, , TAC Capture_du_2019-04-12_09-24-34.png
 
Pinned, com2019, Mon Apr 1 11:02:00 2019, Adrien Matta, MUST2, Hardware, N/A, Switching on and off LV/HV for MUST2 crate 
[SIZE=4]HVM group could be used to switch on and off the LV and HV for the MUST2 crate.
[I]
The command could be lauched from the analysis environment: start a terminal and type:[/I]
Pinned, com2019, Thu Apr 4 14:45:53 2019, Valerian, OTHER, Hardware, N/A, Surveyor's measurements GANIL-0057_E744_I-Stefan.pdfE744_XYZ_deÌtecteurs_Si.xlsx
Summary of the Surveyors. Joined the pdf and the Excel file
Fixed, e793s, Thu Mar 12 15:48:58 2020, Franco&Marlène, GRIT, General, , Summary and TO DO list 12/03/2020 
What remains to be done
- Do the time calibration of all boards (time calibrator has to be connected)
        . When checking the pulser on all boards we saw that MG5 has no triggers on Y and MG9 does not see the pulser (neither X or Y). So we will not
Fixed, e744s, Mon Apr 15 18:23:57 2019, Marion, VAMOS, Hardware, CH2, Suggestion to follow the VAMOS Ewire as a function of time run130_1_VAMOS_1_1ZOOM.png
A shift in the peak position of the DC_EWIRE page could allow to follow the drift chamber wire ageing.