MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 1 of 132  Not logged in MUGAST
Status ExpNbr Date Authordown Type Category Target-Source Subject Text Attachments
FixedTEST Mon Mar 4 16:24:51 2019 valerian marlèneGRITGeneral RUN52 3 alpha source 4MUST2 no pedestalRUN52 
3 alpha source run with only 4MUST2 (in MUVI3)
with pedestal suppression at 13 deg.
 HV_MUST2_during_run52.pngHV_MUST2_afternightrun52.png3alpha_source_4MUST2_nightrun52.png 
FixedTEST Mon Mar 18 18:31:18 2019 valerian marlèneGRITGeneral3-alphaRUN 20 (com2019) 3 alpha overnightRUN20

Run with double 3alpha source MUST2+MG1_7+MG11
 RUN20_HV_MG_3lapha.pngRUN20_3alpha_HV_MUST2.png 
Fixede744s Fri Apr 12 08:01:12 2019 valerianRUNGeneralCH2run 88 screenshots   11x 
Fixede768s Sat Jul 27 21:12:47 2019 teodora & beyhanOTHERHardware cout rate with no beam & water level checkAround 9 pm, we observed an average count
rate of 30kHz on the "or agata" scaler rates
panel of GECO. The other count rates were
 6x 
Fixede768s Sat Jul 27 22:22:21 2019 teodora & beyhanVAMOSHardware FP_DC_Wi1 tripped -->FixedFP_DC_Wi1 tripped. We set back power supply
on the wire
=> fixed
  
Ongoinge775s Sat Feb 29 10:34:31 2020 mugast ; valerian ireneOFFLINESoftwareCD2-AuIssues in the EX reconstructionWe are currently working on the EX reconstruction
which is off for detector 1, 3 and 7... One
of our guess might be that there is an issue
 Comparison_all_and_best_detector.pngKinematics_for_each_detectors.pdfExvsTheta_each_detectors.pdfMUGAST_3D.pdf 
Ongoinge775s Sat Feb 29 17:18:02 2020 mugast ; Valerian, Marlène , PierreOFFLINESoftwareCD2-AuIssues in the EX reconstruction[quote="mugast ; Valerian"][quote="mugast
; Valerian"][quote="mugast ; valerian irene"]We
are currently working on the EX reconstruction
 ExvsTheta_each_detectorsOK.pdfEx_GOOD.pdfEgvsEx_GOOD.pdf 
Ongoinge775s Sat Feb 29 14:27:48 2020 mugast ; ValerianOFFLINESoftwareCD2Issues in the EX reconstruction[quote="mugast ; valerian irene"]We are currently
working on the EX reconstruction which is
off for detector 1, 3 and 7... One of our
 6x 
Ongoinge775s Sat Feb 29 15:53:12 2020 mugast ; ValerianOFFLINESoftwareCD2-AuIssues in the EX reconstruction[quote="mugast ; Valerian"][quote="mugast
; valerian irene"]We are currently working
on the EX reconstruction which is off for
  
Ongoinge775s Sat Feb 29 07:35:21 2020 mugast : ValerianAGATAGeneralCD2AGATA is not respondingSince ~4:30am AGATA is not responding, everyhting
was frozen. Unclear if it comes from disk
problem or other...
  
Fixede775s Sat Feb 29 14:32:39 2020 mugast : ValerianGRITHardwareN/AScheme of the Mugast position in the nptool referentialThe detectors with a cross show the problematic
detectors
 EEDD6F02-7FF9-41B0-BB0B-673611AF018D.jpeg 
Fixede744s Thu Apr 11 17:38:24 2019 mugast (beyhan)BEAMGeneral 14O8+ beam characteristicsBrho 14O8+ = 0.69186 Tm

 image1.jpegIMG_1581.jpg 
Fixede768s Fri Jul 12 17:51:06 2019 mugast (Sylvain, Chloe, François, Marlène, Nicolas)OTHERGeneral Monitoring of beam profile with BAF2In order to provide a efficient way for PCP
to monitor beam profile a new TAC measurement
has set up. 
  
Fixede793s Fri Mar 12 09:52:01 2021 mugast (Sarah, Louis)OFFLINEGeneralCD2Offline analysis run up to 56 8am1) A high energy gamma has been identified
at 3505 keV by gating on 3-5 MeV range in
excitation energy. This transition is unknown
 AngDisrtib.png3MeV_gamma.pngAWBA.png 
Ongoinge793s Wed Mar 10 21:09:25 2021 mugast (Adrien, Nigel et co)BEAMGeneral Primary beam issues
The secondary beam intensity has been fluctuating
around 4 - 5 x 10**5 Hz most of the evening.
  
Fixedcom2019 Tue Apr 2 18:39:55 2019 mugastGRITGeneralN/ATargetsTargets : in the order of the scaler

1- CD2 5.5 mg/cm2
  
Fixedcom2019 Wed Apr 3 15:49:39 2019 mugastGRITHardwareN/ATime calibration files for Mugast and MUST2Time calibration for Mugast and MUST2 has
been done using Calimero run 173 to 178.
Path for files is 
  
Fixedcom2019 Thu Apr 4 08:31:58 2019 mugastRUNGeneralN/ARun 129Run 129 overnight vamos calibration.
Multiple trip of FP_CATSXXX between and 5.09
and 6.35
  
Fixed  Thu Apr 4 22:48:57 2019 mugastGRITGeneralN/A16O beam tuning PCP   photo_1.JPGphoto_2.JPG 
Fixedcom2019 Fri Apr 5 14:54:09 2019 mugastCATSHardwareN/ACATS high voltage lowered by 20VCATS high voltage lowered by 20V from 580V
to 560V (on request of J. Pancin)
  

ELOG Home Page