Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Text |
 |
Fixed | TEST |
Mon Mar 4 16:24:51 2019 |
valerian marlène | GRIT | General | | RUN52 3 alpha source 4MUST2 no pedestal | RUN52
3 alpha source run with only 4MUST2 (in MUVI3)
with pedestal suppression at 13 deg. |
  |
Fixed | TEST |
Mon Mar 18 18:31:18 2019 |
valerian marlène | GRIT | General | 3-alpha | RUN 20 (com2019) 3 alpha overnight | RUN20
Run with double 3alpha source MUST2+MG1_7+MG11
|
 |
Fixed | e744s |
Fri Apr 12 08:01:12 2019 |
valerian | RUN | General | CH2 | run 88 screenshots | |
11x |
Fixed | e768s |
Sat Jul 27 21:12:47 2019 |
teodora & beyhan | OTHER | Hardware | | cout rate with no beam & water level check | Around 9 pm, we observed an average count
rate of 30kHz on the "or agata" scaler rates
panel of GECO. The other count rates were |
6x |
Fixed | e768s |
Sat Jul 27 22:22:21 2019 |
teodora & beyhan | VAMOS | Hardware | | FP_DC_Wi1 tripped -->Fixed | FP_DC_Wi1 tripped. We set back power supply
on the wire
=> fixed |
|
Ongoing | e775s |
Sat Feb 29 10:34:31 2020 |
mugast ; valerian irene | OFFLINE | Software | CD2-Au | Issues in the EX reconstruction | We are currently working on the EX reconstruction
which is off for detector 1, 3 and 7... One
of our guess might be that there is an issue |
   |
Ongoing | e775s |
Sat Feb 29 17:18:02 2020 |
mugast ; Valerian, Marlène , Pierre | OFFLINE | Software | CD2-Au | Issues in the EX reconstruction | [quote="mugast ; Valerian"][quote="mugast
; Valerian"][quote="mugast ; valerian irene"]We
are currently working on the EX reconstruction |
  |
Ongoing | e775s |
Sat Feb 29 14:27:48 2020 |
mugast ; Valerian | OFFLINE | Software | CD2 | Issues in the EX reconstruction | [quote="mugast ; valerian irene"]We are currently
working on the EX reconstruction which is
off for detector 1, 3 and 7... One of our |
6x |
Ongoing | e775s |
Sat Feb 29 15:53:12 2020 |
mugast ; Valerian | OFFLINE | Software | CD2-Au | Issues in the EX reconstruction | [quote="mugast ; Valerian"][quote="mugast
; valerian irene"]We are currently working
on the EX reconstruction which is off for |
|
Ongoing | e775s |
Sat Feb 29 07:35:21 2020 |
mugast : Valerian | AGATA | General | CD2 | AGATA is not responding | Since ~4:30am AGATA is not responding, everyhting
was frozen. Unclear if it comes from disk
problem or other... |
|
Fixed | e775s |
Sat Feb 29 14:32:39 2020 |
mugast : Valerian | GRIT | Hardware | N/A | Scheme of the Mugast position in the nptool referential | The detectors with a cross show the problematic
detectors |
|
Fixed | e744s |
Thu Apr 11 17:38:24 2019 |
mugast (beyhan) | BEAM | General | | 14O8+ beam characteristics | Brho 14O8+ = 0.69186 Tm
|
 |
Fixed | e768s |
Fri Jul 12 17:51:06 2019 |
mugast (Sylvain, Chloe, François, Marlène, Nicolas) | OTHER | General | | Monitoring of beam profile with BAF2 | In order to provide a efficient way for PCP
to monitor beam profile a new TAC measurement
has set up.
|
|
Fixed | e793s |
Fri Mar 12 09:52:01 2021 |
mugast (Sarah, Louis) | OFFLINE | General | CD2 | Offline analysis run up to 56 8am | 1) A high energy gamma has been identified
at 3505 keV by gating on 3-5 MeV range in
excitation energy. This transition is unknown |
  |
Ongoing | e793s |
Wed Mar 10 21:09:25 2021 |
mugast (Adrien, Nigel et co) | BEAM | General | | Primary beam issues |
The secondary beam intensity has been fluctuating
around 4 - 5 x 10**5 Hz most of the evening. |
|
Fixed | com2019 |
Tue Apr 2 18:39:55 2019 |
mugast | GRIT | General | N/A | Targets | Targets : in the order of the scaler
1- CD2 5.5 mg/cm2
|
|
Fixed | com2019 |
Wed Apr 3 15:49:39 2019 |
mugast | GRIT | Hardware | N/A | Time calibration files for Mugast and MUST2 | Time calibration for Mugast and MUST2 has
been done using Calimero run 173 to 178.
Path for files is
|
|
Fixed | com2019 |
Thu Apr 4 08:31:58 2019 |
mugast | RUN | General | N/A | Run 129 | Run 129 overnight vamos calibration.
Multiple trip of FP_CATSXXX between and 5.09
and 6.35 |
|
Fixed | |
Thu Apr 4 22:48:57 2019 |
mugast | GRIT | General | N/A | 16O beam tuning PCP | |
 |
Fixed | com2019 |
Fri Apr 5 14:54:09 2019 |
mugast | CATS | Hardware | N/A | CATS high voltage lowered by 20V | CATS high voltage lowered by 20V from 580V
to 560V (on request of J. Pancin) |
|