Fixed, TEST, Mon Mar 4 16:24:51 2019, valerian marlène, GRIT, General, , RUN52 3 alpha source 4MUST2 no pedestal HV_MUST2_during_run52.pngHV_MUST2_afternightrun52.png3alpha_source_4MUST2_nightrun52.png
RUN52 
3 alpha source run with only 4MUST2 (in MUVI3) with pedestal suppression at 13 deg.
Fixed, TEST, Mon Mar 18 18:31:18 2019, valerian marlène, GRIT, General, 3-alpha, RUN 20 (com2019) 3 alpha overnight RUN20_HV_MG_3lapha.pngRUN20_3alpha_HV_MUST2.png
RUN20

Run with double 3alpha source MUST2+MG1_7+MG11
Fixed, e744s, Fri Apr 12 08:01:12 2019, valerian, RUN, General, CH2, run 88 screenshots 11x
 
Fixed, e768s, Sat Jul 27 21:12:47 2019, teodora & beyhan, OTHER, Hardware, , cout rate with no beam & water level check 6x
Around 9 pm, we observed an average count rate of 30kHz on the "or agata" scaler rates panel of GECO. The other count rates were ok.
In the agata acquisition monitoring the rate was given about 8k. one of the detector was showing a rate in red.
Fixed, e768s, Sat Jul 27 22:22:21 2019, teodora & beyhan, VAMOS, Hardware, , FP_DC_Wi1 tripped -->Fixed 
FP_DC_Wi1 tripped. We set back power supply on the wire
=> fixed
Ongoing, e775s, Sat Feb 29 10:34:31 2020, mugast ; valerian irene, OFFLINE, Software, CD2-Au, Issues in the EX reconstruction Comparison_all_and_best_detector.pngKinematics_for_each_detectors.pdfExvsTheta_each_detectors.pdfMUGAST_3D.pdf
We are currently working on the EX reconstruction which is off for detector 1, 3 and 7... One of our guess might be that there is an issue with the position
of the detectors which gives error in theta... As the energy calibration is ok. Joined are :
    Ongoing, e775s, Sat Feb 29 17:18:02 2020, mugast ; Valerian, Marlène , Pierre, OFFLINE, Software, CD2-Au, Issues in the EX reconstruction ExvsTheta_each_detectorsOK.pdfEx_GOOD.pdfEgvsEx_GOOD.pdf
[quote="mugast ; Valerian"][quote="mugast ; Valerian"][quote="mugast ; valerian irene"]We are currently working on the EX reconstruction which is off for
detector 1, 3 and 7... One of our guess might be that there is an issue with the position of the detectors which gives error in theta... As the energy
calibration is ok. Joined are :
    Ongoing, e775s, Sat Feb 29 14:27:48 2020, mugast ; Valerian, OFFLINE, Software, CD2, Issues in the EX reconstruction 6x
[quote="mugast ; valerian irene"]We are currently working on the EX reconstruction which is off for detector 1, 3 and 7... One of our guess might be that
there is an issue with the position of the detectors which gives error in theta... As the energy calibration is ok. Joined are :
    Ongoing, e775s, Sat Feb 29 15:53:12 2020, mugast ; Valerian, OFFLINE, Software, CD2-Au, Issues in the EX reconstruction 
[quote="mugast ; Valerian"][quote="mugast ; valerian irene"]We are currently working on the EX reconstruction which is off for detector 1, 3 and 7... One
of our guess might be that there is an issue with the position of the detectors which gives error in theta... As the energy calibration is ok. Joined are
:
Ongoing, e775s, Sat Feb 29 07:35:21 2020, mugast : Valerian, AGATA, General, CD2, AGATA is not responding 
Since ~4:30am AGATA is not responding, everyhting was frozen. Unclear if it comes from disk problem or other...
Fixed, e775s, Sat Feb 29 14:32:39 2020, mugast : Valerian, GRIT, Hardware, N/A, Scheme of the Mugast position in the nptool referential EEDD6F02-7FF9-41B0-BB0B-673611AF018D.jpeg
The detectors with a cross show the problematic detectors
Fixed, e744s, Thu Apr 11 17:38:24 2019, mugast (beyhan), BEAM, General, , 14O8+ beam characteristics image1.jpegIMG_1581.jpg
Brho 14O8+ = 0.69186 Tm

Fixed, e768s, Fri Jul 12 17:51:06 2019, mugast (Sylvain, Chloe, François, Marlène, Nicolas), OTHER, General, , Monitoring of beam profile with BAF2 
In order to provide a efficient way for PCP to monitor beam profile a new TAC measurement has set up. 

A BAF2 detector has been inserted close to the reaction chamber (in position 7 of AGATA structure frame). Operating voltage of BaF2 is 1800V and the typical
Fixed, e793s, Fri Mar 12 09:52:01 2021, mugast (Sarah, Louis), OFFLINE, General, CD2, Offline analysis run up to 56 8am AngDisrtib.png3MeV_gamma.pngAWBA.png
1) A high energy gamma has been identified at 3505 keV by gating on 3-5 MeV range in excitation energy. This transition is unknown so far

2) preliminary angular distribution has been extracted for the p states(<1MeV) and the f states (3-5MeV) corrected from geometrical efficiency. Angular
Ongoing, e793s, Wed Mar 10 21:09:25 2021, mugast (Adrien, Nigel et co), BEAM, General, , Primary beam issues 

The secondary beam intensity has been fluctuating around 4 - 5 x 10**5 Hz most of the evening.  15 mins ago it was realised that it had dropped off to
only 1 x 10**5 Hz.  As suspected, PCP confirmed that primary beam intensity has dropped off.  They are investigating ...
Fixed, com2019, Tue Apr 2 18:39:55 2019, mugast, GRIT, General, N/A, Targets 
Targets : in the order of the scaler

1- CD2 5.5 mg/cm2
Fixed, com2019, Wed Apr 3 15:49:39 2019, mugast, GRIT, Hardware, N/A, Time calibration files for Mugast and MUST2 
Time calibration for Mugast and MUST2 has been done using Calimero run 173 to 178. Path for files is 

/home/mugast/analysis/nptool/Projects/calibration/Time/Coeff/
Fixed, com2019, Thu Apr 4 08:31:58 2019, mugast, RUN, General, N/A, Run 129 
Run 129 overnight vamos calibration.
Multiple trip of FP_CATSXXX between and 5.09 and 6.35
Fixed, , Thu Apr 4 22:48:57 2019, mugast, GRIT, General, N/A, 16O beam tuning PCP photo_1.JPGphoto_2.JPG
 
Fixed, com2019, Fri Apr 5 14:54:09 2019, mugast, CATS, Hardware, N/A, CATS high voltage lowered by 20V 
CATS high voltage lowered by 20V from 580V to 560V (on request of J. Pancin)