Fixed, e748, Mon Jul 3 21:13:18 2017, e748, OFFLINE, General, N/A, cats
|
run222 cats |
Fixed, e748, Mon Jul 3 21:41:57 2017, Valérie L, RUN, General, CD2, Runs 225-227
|
---------------------------------------------------------------------------------
3 µA at 21h25 ; CAVIAR D6 28000/s
CATS 20000/s
|
Fixed, , Mon Jul 3 22:10:28 2017, Valérie L, CATS, Hardware, CD2, VXI CATS crate problem solved 
|
We had problems with CATS VME/VXI crate.
It was idle and it was not possible to restart it by breakup and init.
We enter in the room to reset the ganlx7 of CATS.
|
Fixed, e748, Mon Jul 3 22:24:05 2017, Valérie L, RUN, General, CD2, Run series of problems 3rd July
|
The daq was unstable with several problems of the merge from LISE.
We did tk kna (kill narval process) and na.
but the next run was starting still unstable with Error from the merge
|
Fixed, , Mon Jul 3 22:40:33 2017, e748, RUN, General, , Plastic_Cats_T 
|
Tac run_223
Range: T_CATS1_CAV 1 µs
|
Fixed, e748, Mon Jul 3 23:06:24 2017, Valérie L, RUN, General, CD2, Problem during Run 230-231 with CATS  
|
r-- 1 e748 Exxx 34013184 3 juil. 22:52 run_0230.dat.03-07-17_22h46m03s
-rw-r--r-- 1 e748 Exxx 97910784 3 juil. 23:09 run_0231.dat.03-07-17_22h54m42s |
Fixed, e748, Mon Jul 3 23:16:33 2017, Valérie L, DAQ, General, CD2, Change of TAC RANGES (from run 230)
|
TAC range changed after run 229.
NB: Change applied for Runs 230 and 231
BUT these runs are not working due to problems of Merger
|
Fixed, , Tue Jul 4 00:53:18 2017, Valérie L, RUN, General, CD2, Runs with merge and time out problems
|
-r--r--r-- 1 e748 Exxx 720896 3 juil. 21:55 run_0226.dat.03-07-17_21h54m51s
-rw-r--r-- 1 e748 Exxx 786432 3 juil. 21:56 run_0227.dat.03-07-17_21h55m56s
-r--r--r-- 1 e748 Exxx 57016320 3 juil. 22:16 run_0228.dat.03-07-17_22h12m59s
|
Fixed, , Tue Jul 4 00:54:41 2017, Valérie L, RUN, General, CD2, Runs after reset of VXI
|
VXI CHIO was offline --> reset of ganlx9 (entering in D6) on the VXI crate
|
Fixed, e748, Tue Jul 4 01:00:26 2017, Valérie L, RUN, General, CD2, Run 239 test with trigger MUST2
|
Started run #239 4JULY start 00h59 stop 1h15
PROBLEM junk header checked with Ganil Tape
triggers only MUST2 IN1 to IN8
|
Fixed, e748, Tue Jul 4 01:17:35 2017, Valérie L, RUN, General, CD2, Run 240
|
Run #240 4JULY start 1h17
(run ok checked with Ganil_Tape)
All triggers MUST2 IN1 to IN8,
|
Fixed, e748, Tue Jul 4 01:21:04 2017, e748, OFFLINE, General, CD2, run 236
|
cats > target
cats > target, gated by must |
Fixed, e748, Tue Jul 4 02:33:36 2017, Valérie L, shifts U+S Yorick, RUN, Hardware, , GMT channel 8 
|
Apparently Channel 8 of the GMT is not operational. We put telescope T8 in entry 15.
This operation gives good results, see pictures below of Gatconf with 2**(N-1) = 2**14 = 16384 for Run 248.
Triggers GMT are now:
|
Fixed, e748, Tue Jul 4 04:01:50 2017, e748, RUN, Hardware, , RUN249
|
RUN249
Same setting as RUN248.
|
Fixed, e748, Tue Jul 4 05:01:21 2017, Yorick, RUN, General, CD2, Runs 248-250
|
These are long runs with CD2
MUST8 is in GMT 15.
Missing Times: T7 X and Y; T5 Y.
|
Fixed, e748, Tue Jul 4 05:08:30 2017, e748, MUST2, Hardware, , MUST2 signql check in offline analysis
|
RUN248
MUST2 DSSD XE signal for all telescopes T1-T8 confirmed.
MUST2 DSSD YE signal for all telescopes T1-T8 confirmed.
|
Fixed, e748, Tue Jul 4 05:11:20 2017, e748, MUST2, Hardware, , MUST2 signql check in offline analysis 10x
|
RUN248
MUST2 DSSD XE signal for all telescopes T1-T8 confirmed.
MUST2 DSSD YE signal for all telescopes T1-T8 confirmed.
|
Fixed, e748, Tue Jul 4 05:20:31 2017, e748, RUN, Hardware, , RUN250
|
Same setting as RUN248.
run_0250.dat.04-07-17_04h58m50s
start 4h58 Gtape ok
|
Fixed, e748, Tue Jul 4 05:23:20 2017, e748, CATS, Software, , CATS signal   
|
RUN248
The chqrge distribution of CATS1&2, X&Y
Gate:CATSdiv trigger |
Fixed, e748, Tue Jul 4 07:00:55 2017, e748, RUN, Hardware, , RUN252
|
Same setting as RUN248.
RUN251 junk header
run_0252.dat.04-07-17_05h33m06s
|
|