MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 5 of 48  Not logged in MUST2
New entries since:Thu Jan 1 01:00:00 1970
Fixed, e748, Thu Jun 29 23:26:10 2017, Valérie Lapoux, RUN, General, Empty, ALL CALIMERO Time Calibration MUVI1 CalimeroRunControl.pngConfigCalimeroStat.pngCalibTmuvi1Yperiod20nsrange600ns.pngTimeMust2X_MUVI1_uncalib.pngTimeMust2Y_MUVI1_uncalib.png
29 JUNE 2017 
CONDITIONS FOR CALIMERO CALIBRATIONS
Time calibrator Period 20ns ; range 512 ns
Fixed, e748, Fri Jun 30 00:33:36 2017, Valérie Lapoux, RUN, General, Empty, ALL CALIMERO Time Calibration MUVI2 CalibTimeMUVI2stripXT.pngSpectresMUVI2stripXT300ns.png
30 JUNE 2017
CONDITIONS FOR CALIMERO CALIBRATIONS
Time calibrator Period 20ns ; range 512 ns
Fixed, e748, Fri Jun 30 01:01:08 2017, Valérie Lapoux, RUN, General, Empty, ALL CALIMERO Time Calibration MUVI2 GOOD RUNS 600ns TimeMust2X_MUVI2_uncalib.pngTimeMust2Y_MUVI2_uncalib.png
[B]RANGE TAC MUST2 600ns
CALIMERO TIME CALIBRATOR PERIOD 20ns; Range 512ns[/B]
[B]RUN  40[/B] started 00H53  ; stop   30 juin 01:19
Fixed, e748, Fri Jun 30 02:00:44 2017, e748, MUST2, Hardware, N/A, Warming up of detector started 
All LV and HT off, vaccumm at 1.3e-5 mbar, starting warm up sequence.
Fixed, e748, Fri Jun 30 11:09:59 2017, Freddy, OFFLINE, General, , Analysis of DSSD Energy Calibration - alpha source run19_Summary_EX.pdfrun19_Summary_EY.pdf
We made a calibration with the last alpha source runs:
-run 19 for T1-2-3-4
-run 29 for T5 and T8
Fixed, e748, Fri Jun 30 12:24:17 2017, Valérie Lapoux, DAQ, General, , DAQ Parameters: TAC, Caviar, LISE D4, D6, Caviar DASParamVXIMust2CatsTACLise.pngDASParamVXIChioQDC.pngDASParamVXIChioADClisepar.png
 
Fixed, e748, Fri Jun 30 16:49:49 2017, Valérie Lapoux, DAQ, General, , GMT triggers and chronograph DASConfigTriggerGMT.pngChronogrammeGMT30juinFAG100nsCT5µs.png
Configurations for the GMT inputs.
30 June 2017 pm
all Must2 telescopes,
Fixed, e748, Fri Jun 30 16:55:04 2017, Valérie Lapoux, DAQ, General, , Run control for global DAQ with NUMEXO RunControlAll748ModeMonitoring.pngNarvalRunControlAllE748.png
The run start/stop sequence for the global DAQ including the NUMEXO:

I. ssh e748chio@ganp976
Fixed, e748, Fri Jun 30 17:53:35 2017, Valérie Lapoux, DAQ, General, , Scalers parameters U2M Actionse748ganlx11withU2M.pngScalerAnalyzerU2M.png
 
Fixed, e748, Fri Jun 30 20:46:16 2017, Valérie Lapoux, TARGET, General, , TARGET configuration 
List of the reaction target in the chamber from bottom to up:

 6. EMPTY FRAME (no frame) 
Fixed, e748, Sat Jul 1 09:27:46 2017, Adrien Matta, OTHER, General, N/A, SHIFT TABLE 
 
Fixed, e748, Sat Jul 1 10:47:18 2017, Adrien Matta, BEAM, General, N/A, Primary beam energy measurement IMG_1984.JPG
PCP delivered the primary beam energy measurement
Fixed, , Sat Jul 1 12:45:25 2017, Anastasia , CATS, General, , CATS Calibrated cats_calibrated.png
run_0026 CATS 1 X Y
run_0027 CATS 2 X Y
Fixed, e748, Sat Jul 1 14:32:02 2017, Valérie Lapoux, DAQ, General, , Scalers U2M, parameters ScalersU2Mok.pngCompilActionsganlx11ScalerGr1to4..png
U2M configuration +Actions ganlx11

The signals for the scalers are converted from NIM to ECL in a 16 channel module NIM-ECL.
Fixed, e748, Sat Jul 1 14:45:17 2017, Valérie Lapoux, DAQ, General, , Parameters for correlation checkings 
The [B]parameters[/B] to be used for the checking of the correlations between crates/VME/VXI and good running of the merging
conditions of the different DAQs are : 
- for MUST2 VXI with the GMT: [B]GATCONF[/B]
Fixed, e748, Sat Jul 1 15:12:01 2017, Valérie Lapoux, ONLINE, Hardware, , Conditions for Bidiv and TAC 1st July 15pm 
(Update the file CONDTIONS748.txt during the experiment)

JULY 1st 15pm
Fixed, , Sat Jul 1 17:09:04 2017, e748, MUST2, General, , TIME CAL CHECK must2_time_cal_run40.png
run_0040_CalMust2Histos.root
Fixed, e748, Sat Jul 1 22:16:46 2017, e748, DAQ, General, N/A, Problem of Merge 
The DAQ was not merging properly.
We figured out that the centrum was goiging out of sync when the run was stopped.
Fred added in the action file the reset of the event number in the INIT RUN block.
Fixed, e748, Sun Jul 2 03:46:11 2017, e748, OTHER, Hardware, , UPDATE OF TAC settings 
Here are several changes made during the night to optimize timing for TACs:

TAC PL-CATS1
Fixed, e748, Sun Jul 2 04:58:36 2017, e748, RUN, General, N/A, Run 74: MASK IN 
Starting Run 74 with trigger plastic and MASK at target position.

Intensity is set around 6-10kHz

ELOG Home Page