Fixed, e748, Thu Jun 29 23:26:10 2017, Valérie Lapoux, RUN, General, Empty, ALL CALIMERO Time Calibration MUVI1    
|
29 JUNE 2017
CONDITIONS FOR CALIMERO CALIBRATIONS
Time calibrator Period 20ns ; range 512 ns
|
Fixed, e748, Fri Jun 30 00:33:36 2017, Valérie Lapoux, RUN, General, Empty, ALL CALIMERO Time Calibration MUVI2 
|
30 JUNE 2017
CONDITIONS FOR CALIMERO CALIBRATIONS
Time calibrator Period 20ns ; range 512 ns
|
Fixed, e748, Fri Jun 30 01:01:08 2017, Valérie Lapoux, RUN, General, Empty, ALL CALIMERO Time Calibration MUVI2 GOOD RUNS 600ns 
|
[B]RANGE TAC MUST2 600ns
CALIMERO TIME CALIBRATOR PERIOD 20ns; Range 512ns[/B]
[B]RUN 40[/B] started 00H53 ; stop 30 juin 01:19
|
Fixed, e748, Fri Jun 30 02:00:44 2017, e748, MUST2, Hardware, N/A, Warming up of detector started
|
All LV and HT off, vaccumm at 1.3e-5 mbar, starting warm up sequence. |
Fixed, e748, Fri Jun 30 11:09:59 2017, Freddy, OFFLINE, General, , Analysis of DSSD Energy Calibration - alpha source 
|
We made a calibration with the last alpha source runs:
-run 19 for T1-2-3-4
-run 29 for T5 and T8
|
Fixed, e748, Fri Jun 30 12:24:17 2017, Valérie Lapoux, DAQ, General, , DAQ Parameters: TAC, Caviar, LISE D4, D6, Caviar  
|
|
Fixed, e748, Fri Jun 30 16:49:49 2017, Valérie Lapoux, DAQ, General, , GMT triggers and chronograph 
|
Configurations for the GMT inputs.
30 June 2017 pm
all Must2 telescopes,
|
Fixed, e748, Fri Jun 30 16:55:04 2017, Valérie Lapoux, DAQ, General, , Run control for global DAQ with NUMEXO 
|
The run start/stop sequence for the global DAQ including the NUMEXO:
I. ssh e748chio@ganp976
|
Fixed, e748, Fri Jun 30 17:53:35 2017, Valérie Lapoux, DAQ, General, , Scalers parameters U2M 
|
|
Fixed, e748, Fri Jun 30 20:46:16 2017, Valérie Lapoux, TARGET, General, , TARGET configuration
|
List of the reaction target in the chamber from bottom to up:
6. EMPTY FRAME (no frame)
|
Fixed, e748, Sat Jul 1 09:27:46 2017, Adrien Matta, OTHER, General, N/A, SHIFT TABLE
|
|
Fixed, e748, Sat Jul 1 10:47:18 2017, Adrien Matta, BEAM, General, N/A, Primary beam energy measurement
|
PCP delivered the primary beam energy measurement |
Fixed, , Sat Jul 1 12:45:25 2017, Anastasia , CATS, General, , CATS Calibrated
|
run_0026 CATS 1 X Y
run_0027 CATS 2 X Y |
Fixed, e748, Sat Jul 1 14:32:02 2017, Valérie Lapoux, DAQ, General, , Scalers U2M, parameters 
|
U2M configuration +Actions ganlx11
The signals for the scalers are converted from NIM to ECL in a 16 channel module NIM-ECL.
|
Fixed, e748, Sat Jul 1 14:45:17 2017, Valérie Lapoux, DAQ, General, , Parameters for correlation checkings
|
The [B]parameters[/B] to be used for the checking of the correlations between crates/VME/VXI and good running of the merging
conditions of the different DAQs are :
- for MUST2 VXI with the GMT: [B]GATCONF[/B]
|
Fixed, e748, Sat Jul 1 15:12:01 2017, Valérie Lapoux, ONLINE, Hardware, , Conditions for Bidiv and TAC 1st July 15pm
|
(Update the file CONDTIONS748.txt during the experiment)
JULY 1st 15pm
|
Fixed, , Sat Jul 1 17:09:04 2017, e748, MUST2, General, , TIME CAL CHECK
|
run_0040_CalMust2Histos.root |
Fixed, e748, Sat Jul 1 22:16:46 2017, e748, DAQ, General, N/A, Problem of Merge
|
The DAQ was not merging properly.
We figured out that the centrum was goiging out of sync when the run was stopped.
Fred added in the action file the reset of the event number in the INIT RUN block.
|
Fixed, e748, Sun Jul 2 03:46:11 2017, e748, OTHER, Hardware, , UPDATE OF TAC settings
|
Here are several changes made during the night to optimize timing for TACs:
TAC PL-CATS1
|
Fixed, e748, Sun Jul 2 04:58:36 2017, e748, RUN, General, N/A, Run 74: MASK IN
|
Starting Run 74 with trigger plastic and MASK at target position.
Intensity is set around 6-10kHz |
|