MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 4 of 48  Not logged in MUST2
Ongoing, e744, Sat Apr 28 13:36:52 2018, Valerian and Iulian, OTHER, Software, N/A, Problem with DAS configuration 
There is an issue with the GMT slave. When you click Online and then apply write hardware, if the message : register error on GMTSlave appear, reload a functioning DAS config and do not write hardware twice.

If you use write hardware twice, the error will disappear, but almost no triggering of the GMT will occur.
Ongoing, e744, Thu May 3 08:50:17 2018, François, VACUUM, General, , stop vacuum 
turbo pumps stopped at 8H45

problem with the cooling system of the M2C chamber, the liquid was in the pipe but it was stopped, no flow, with a lot of "dusts" (vert de gris) => decision = we purge the pipes and the cooling system, once again !
Ongoing, e744, Thu May 3 19:11:14 2018, Valerian Marlene and Francois, MUST2, General, 3-alpha, run 3 alpha T5 
run #196
3 alpha source and pedestals supressed
Trigger T5 only
Ongoing, e744, Sat May 5 11:14:33 2018, Iulian & Valerian, RUN, General, 3-alpha, run #204 alpha source BT_tripped_T5.pngT5_das_no_cooling.pngT5_das_no_cooling2.pngT5_vigru_no_cooling.png20180506_152338.jpg
run #204
alpha source
start @11h15 05/05
stop @15h16 06/05

Cooling stopped on T5, the cooling system was beeping with a LLL error, I started it again but it stopped with this error again... I stopped the BT and HT on T5.
One of the BT was tripping. I looked at the DAS, but the temperature seemed Ok... but I have no idea if they reflect well the reality...

I join to this entry screenshots :
- the CAEN 1527 terminal
- the das of MUVI2 channel 1 X&Y
- the vigru screen updated
- The LLL error

After calling Francois and Laurent Menager, I refilled it with alcool from the blue containers. It seemed to be working again.
Ongoing, e744, Sun May 6 17:55:05 2018, Valerian, OTHER, General, 3-alpha, Update on the cooling system problem 6x
After waiting for 1-2 hours. I started the BT again on T5 no tripping BT anymore. While writing hardware with DAS T5 responded well.

After starting the HT, i started a new run :

run #206
start @18h02
stop @18h15

the spectrum seem OK.

In both cooling systems the levels are still good, did we refilled the 0 degree cooling system since the beginning?

The vacuum is @ 9.1e-6 in M2C and 2e-5 in 0 degree chamber.

I then left the cooling ON, but stopped both HT and BT on every telescopes.

I join with this entry screenshots of :

- T5 spectra
- BT&HT current before stopping
- DAS window for X&Y
Ongoing, e744, Sat May 12 20:09:09 2018, iulian, MUST2, General, 3-alpha, Run #115 3 alfa run Calibration T1-T5 trigger Must_spectra_start_run215.pngMust_spectra_stop_run215.pngerror_run215.pngerror_1minlater_run215.png
Run #215
Trigger T1-T5
3 alpha run
start @20h09 12/05
stop 11h40 13/05

Run crashed during the night (looks line NARVAL)...
Needed to stop and start to be able to init VME slave.... VME master was ok
Ongoing, e744, Sun May 13 12:09:55 2018, iulian, MUST2, General, 3-alpha, Run #116 3 alfa run Calibration T1-T5 trigger  Must_spectra_start_run216.png
Run #115
3 alfa run Calibration T1-T5 trigger
start 12h10


start_online gives a ilegal instruction fault from time to time:
Ongoing, e744, Sun May 13 19:36:09 2018, Valérian + François, MUST2, General, 3-alpha, Run #116 #117 3 alpha run Calibration T1-T5 trigger MUST2_HT_BT_13-05-2018.pngspectra_14-05-2018.png
run #116
start @12h07 13/05/18
stop @19h45 13/05/18

I refilled the 0 degree cooler.

run #117
start @19h47 13/05/18
stop @ 9H04 14/05/18

Joined is a screenshot of the HT of MUST2

Vacuum in M2C is 5.7e-6 mbar and ~4e-5 in the 0 degree chamber which is higher than before.

Joined spectra.
Ongoing, e744, Mon May 14 12:57:44 2018, Francois, TARGET, General, , target preparation 


Cibles Georges

1) Plastique 63 µm

2) 104 µm

3) 200 µm



Cibles GoodFellow

4) Carbone 0.075 mm (je calcule épaisseur de 8,9 mg/cm2)

5) Polyéthylène 63 µm

6) Polyéthylène 0,1 mm = 100 µm

7) 2 cibles de 100 µm en sandwich = 200 µm


Ongoing, e744, Tue May 15 09:58:52 2018, Valérian, RUN, General, 3-alpha, run #118 3 alpha 
run #118
Trigger T1 T2 T3 T4 & T5
EXL + BT not biased but still in trigger
3 alpha
start @18h04 14/05/18
stop @10h00 15/05/18
Ongoing, e744, Tue May 15 21:32:46 2018, Iulian Valerian, EXL-PPT, General, 60Co, run #300 60 Co source EXL & PPT trigger 
Run #300
PPT EXL trigger 60Co

start 21:32:06 15/05/2018
Ongoing, e744, Wed May 16 09:49:26 2018, Francois & Ruxandra & Armel, BEAM, Hardware, , E1D6 and E2D6 detectors essai.jpg
After struggling with the noise, we achieved ~ 50 keV resolution.

Source = 1 alpha peak 241Am E=5.485 MeV

Detector E1D6 50 µm 25 V in principle, but set to 100 V
Detector E2D6 300 µm 70 V in principle, but set to 100 V

PA gain = 20 mV/MeV

Maximum output signal of the new PA (differential) = 8 V.
Ongoing, e744, Wed May 16 21:27:55 2018, Iulian Valerian, MUST2, Software, N/A, Run #322 Calimero T1-T4 X strips Calimerro_run322.png
Run #322
Calimero T1-T4 X strips
1 channel per mate not done (Valerian too slow to cable start stop Wink )
Ongoing, e744, Wed May 16 21:45:47 2018, iulian, MUST2, Software, N/A, Run #323 Calimero T1-T4 strips X Calimerro_run323.png
Run #323
Calimero T1-T4 strips X
Ongoing, e744, Wed May 16 22:03:13 2018, iulian, EXL-PPT, Software, 60Co, run #324 60Co  EXL_run324.pngPPT_run324.png
run #324
60Co

start 22h02 16/05
stop 10h12 17/05
Ongoing, e744, Thu May 17 18:29:16 2018, iulian, MUST2, General, 3-alpha, Run #333 Last alfa run before experiment Must_spectra_start_run333.png
Run #333
3a source
T1-T5 trigger

start 18h30


ps: If no HT on the detectors but BT on, you will have alfa E&T on X, but not on Y side (except some strips)
Ongoing, e744, Thu May 17 19:15:21 2018, Iulian , EXL-PPT, General, 60Co, Run #334 Last 60 co run for eficacity before experiment 
Run #334

start 19h15
Ongoing, e744, Sat May 19 15:32:51 2018, Iulian Valerian, EXL-PPT, General, N/A, Started run #346 Room background PPT EXL 
run #346

Room background PPT EXL

start 15h32 19 Mai
stop 18h52 20 Mai
Ongoing, e744, Sun May 20 19:11:57 2018, ruxandra cristina giuseppe jaromir, EXL-PPT, Hardware, 60Co, EXL-addback and light leak considerations EXL.pdf
in the middle of the considerations - pdf file

Content:
Light leak between PM-pair
Zamora theses
Peyre R3B development

Runs 302, 339
There were huge loads, DT not under control, the LaBr and EXL did not coincide.... solved 2018/05/22
Run 347 background - better
Ongoing, e744, Wed May 23 20:52:01 2018, Iulian Valerian, RUN, General, , run #429 and #430 and config gmt config_gmt.pngconfig_gmtslave.pngrun430_E_PPT_vs_T_PPT.pdfrun430_E_PPT_proj.pdfrun430_E_EXL_vs_T_EXLor.pdf
Changed VAL from 2 us to 2.5 us

run #429 exl ppt triggers

run #430 exl ppt triggers. Changed val on gmtslave also

The correlation between MUST and PPT (run430_E_PPT_vs_T_PPT.pdf) is due to the beta decay of 138La (internal contamination in the LaBr crystal). PPT detects the beta energy with 100% eff, while the gamma rays - emitted in the beta decay process- interacted in MUST detectors. The EXL bidim shows only random events (no internal contamination).