MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 4 of 48  Not logged in MUST2
Statusdown ExpNbr Date Author Type Category Target-Source Subject
Ongoinge744 Sat Apr 28 13:36:52 2018 Valerian and IulianOTHERSoftwareN/AProblem with DAS configuration
There is an issue with the GMT slave. When you click Online and then apply write hardware, if the message : register error on GMTSlave appear, reload a functioning DAS config and do not write hardware twice.

If you use write hardware twice, the error will disappear, but almost no triggering of the GMT will occur.
Ongoinge744 Thu May 3 08:50:17 2018 FrançoisVACUUMGeneral stop vacuum
turbo pumps stopped at 8H45

problem with the cooling system of the M2C chamber, the liquid was in the pipe but it was stopped, no flow, with a lot of "dusts" (vert de gris) => decision = we purge the pipes and the cooling system, once again !
Ongoinge744 Thu May 3 19:11:14 2018 Valerian Marlene and FrancoisMUST2General3-alpharun 3 alpha T5
run #196
3 alpha source and pedestals supressed
Trigger T5 only
Ongoinge744 Sat May 5 11:14:33 2018 Iulian & ValerianRUNGeneral3-alpharun #204 alpha source
run #204
alpha source
start @11h15 05/05
stop @15h16 06/05

Cooling stopped on T5, the cooling system was beeping with a LLL error, I started it again but it stopped with this error again... I stopped the BT and HT on T5.
One of the BT was tripping. I looked at the DAS, but the temperature seemed Ok... but I have no idea if they reflect well the reality...

I join to this entry screenshots :
- the CAEN 1527 terminal
- the das of MUVI2 channel 1 X&Y
- the vigru screen updated
- The LLL error

After calling Francois and Laurent Menager, I refilled it with alcool from the blue containers. It seemed to be working again.
Attachment 1: BT_tripped_T5.png
BT_tripped_T5.png
Attachment 2: T5_das_no_cooling.png
T5_das_no_cooling.png
Attachment 3: T5_das_no_cooling2.png
T5_das_no_cooling2.png
Attachment 4: T5_vigru_no_cooling.png
T5_vigru_no_cooling.png
Attachment 5: 20180506_152338.jpg
20180506_152338.jpg
Ongoinge744 Sun May 6 17:55:05 2018 ValerianOTHERGeneral3-alphaUpdate on the cooling system problem
After waiting for 1-2 hours. I started the BT again on T5 no tripping BT anymore. While writing hardware with DAS T5 responded well.

After starting the HT, i started a new run :

run #206
start @18h02
stop @18h15

the spectrum seem OK.

In both cooling systems the levels are still good, did we refilled the 0 degree cooling system since the beginning?

The vacuum is @ 9.1e-6 in M2C and 2e-5 in 0 degree chamber.

I then left the cooling ON, but stopped both HT and BT on every telescopes.

I join with this entry screenshots of :

- T5 spectra
- BT&HT current before stopping
- DAS window for X&Y
Attachment 1: T5_vigru_after_cooling_issue.png
T5_vigru_after_cooling_issue.png
Attachment 2: BT_HT_part1.png
BT_HT_part1.png
Attachment 3: BT_HT_part2.png
BT_HT_part2.png
Attachment 4: BT_HT_part3.png
BT_HT_part3.png
Attachment 5: T5_das_after_cooling_issue_X.png
T5_das_after_cooling_issue_X.png
Attachment 6: T5_das_after_cooling_issue_Y.png
T5_das_after_cooling_issue_Y.png
Ongoinge744 Sat May 12 20:09:09 2018 iulianMUST2General3-alphaRun #115 3 alfa run Calibration T1-T5 trigger
Run #215
Trigger T1-T5
3 alpha run
start @20h09 12/05
stop 11h40 13/05

Run crashed during the night (looks line NARVAL)...
Needed to stop and start to be able to init VME slave.... VME master was ok
Attachment 1: Must_spectra_start_run215.png
Must_spectra_start_run215.png
Attachment 2: Must_spectra_stop_run215.png
Must_spectra_stop_run215.png
Attachment 3: error_run215.png
error_run215.png
Attachment 4: error_1minlater_run215.png
error_1minlater_run215.png
Ongoinge744 Sun May 13 12:09:55 2018 iulianMUST2General3-alphaRun #116 3 alfa run Calibration T1-T5 trigger
Run #115
3 alfa run Calibration T1-T5 trigger
start 12h10


start_online gives a ilegal instruction fault from time to time:
Attachment 1: Must_spectra_start_run216.png
Must_spectra_start_run216.png
Ongoinge744 Sun May 13 19:36:09 2018 Valérian + FrançoisMUST2General3-alphaRun #116 #117 3 alpha run Calibration T1-T5 trigger
run #116
start @12h07 13/05/18
stop @19h45 13/05/18

I refilled the 0 degree cooler.

run #117
start @19h47 13/05/18
stop @ 9H04 14/05/18

Joined is a screenshot of the HT of MUST2

Vacuum in M2C is 5.7e-6 mbar and ~4e-5 in the 0 degree chamber which is higher than before.

Joined spectra.
Attachment 1: MUST2_HT_BT_13-05-2018.png
MUST2_HT_BT_13-05-2018.png
Attachment 2: spectra_14-05-2018.png
spectra_14-05-2018.png
Ongoinge744 Mon May 14 12:57:44 2018 FrancoisTARGETGeneral target preparation


Cibles Georges

1) Plastique 63 µm

2) 104 µm

3) 200 µm



Cibles GoodFellow

4) Carbone 0.075 mm (je calcule épaisseur de 8,9 mg/cm2)

5) Polyéthylène 63 µm

6) Polyéthylène 0,1 mm = 100 µm

7) 2 cibles de 100 µm en sandwich = 200 µm


Ongoinge744 Tue May 15 09:58:52 2018 ValérianRUNGeneral3-alpharun #118 3 alpha
run #118
Trigger T1 T2 T3 T4 & T5
EXL + BT not biased but still in trigger
3 alpha
start @18h04 14/05/18
stop @10h00 15/05/18
Ongoinge744 Tue May 15 21:32:46 2018 Iulian ValerianEXL-PPTGeneral60Corun #300 60 Co source EXL & PPT trigger
Run #300
PPT EXL trigger 60Co

start 21:32:06 15/05/2018
Ongoinge744 Wed May 16 09:49:26 2018 Francois & Ruxandra & ArmelBEAMHardware E1D6 and E2D6 detectors
After struggling with the noise, we achieved ~ 50 keV resolution.

Source = 1 alpha peak 241Am E=5.485 MeV

Detector E1D6 50 µm 25 V in principle, but set to 100 V
Detector E2D6 300 µm 70 V in principle, but set to 100 V

PA gain = 20 mV/MeV

Maximum output signal of the new PA (differential) = 8 V.
Attachment 1: essai.jpg
essai.jpg
Ongoinge744 Wed May 16 21:27:55 2018 Iulian ValerianMUST2SoftwareN/ARun #322 Calimero T1-T4 X strips
Run #322
Calimero T1-T4 X strips
1 channel per mate not done (Valerian too slow to cable start stop Wink )
Attachment 1: Calimerro_run322.png
Calimerro_run322.png
Ongoinge744 Wed May 16 21:45:47 2018 iulianMUST2SoftwareN/A Run #323 Calimero T1-T4 strips X
Run #323
Calimero T1-T4 strips X
Attachment 1: Calimerro_run323.png
Calimerro_run323.png
Ongoinge744 Wed May 16 22:03:13 2018 iulianEXL-PPTSoftware60Corun #324 60Co
run #324
60Co

start 22h02 16/05
stop 10h12 17/05
Attachment 1: EXL_run324.png
EXL_run324.png
Attachment 2: PPT_run324.png
PPT_run324.png
Ongoinge744 Thu May 17 18:29:16 2018 iulianMUST2General3-alphaRun #333 Last alfa run before experiment
Run #333
3a source
T1-T5 trigger

start 18h30


ps: If no HT on the detectors but BT on, you will have alfa E&T on X, but not on Y side (except some strips)
Attachment 1: Must_spectra_start_run333.png
Must_spectra_start_run333.png
Ongoinge744 Thu May 17 19:15:21 2018 Iulian EXL-PPTGeneral60CoRun #334 Last 60 co run for eficacity before experiment
Run #334

start 19h15
Ongoinge744 Sat May 19 15:32:51 2018 Iulian ValerianEXL-PPTGeneralN/AStarted run #346 Room background PPT EXL
run #346

Room background PPT EXL

start 15h32 19 Mai
stop 18h52 20 Mai
Ongoinge744 Sun May 20 19:11:57 2018 ruxandra cristina giuseppe jaromirEXL-PPTHardware60CoEXL-addback and light leak considerations
in the middle of the considerations - pdf file

Content:
Light leak between PM-pair
Zamora theses
Peyre R3B development

Runs 302, 339
There were huge loads, DT not under control, the LaBr and EXL did not coincide.... solved 2018/05/22
Run 347 background - better
Attachment 1: EXL.pdf
EXL.pdf EXL.pdf EXL.pdf EXL.pdf EXL.pdf EXL.pdf EXL.pdf EXL.pdf
Ongoinge744 Wed May 23 20:52:01 2018 Iulian ValerianRUNGeneral run #429 and #430 and config gmt
Changed VAL from 2 us to 2.5 us

run #429 exl ppt triggers

run #430 exl ppt triggers. Changed val on gmtslave also

The correlation between MUST and PPT (run430_E_PPT_vs_T_PPT.pdf) is due to the beta decay of 138La (internal contamination in the LaBr crystal). PPT detects the beta energy with 100% eff, while the gamma rays - emitted in the beta decay process- interacted in MUST detectors. The EXL bidim shows only random events (no internal contamination).
Attachment 1: config_gmt.png
config_gmt.png
Attachment 2: config_gmtslave.png
config_gmtslave.png
Attachment 3: run430_E_PPT_vs_T_PPT.pdf
run430_E_PPT_vs_T_PPT.pdf
Attachment 4: run430_E_PPT_proj.pdf
run430_E_PPT_proj.pdf
Attachment 5: run430_E_EXL_vs_T_EXLor.pdf
run430_E_EXL_vs_T_EXLor.pdf

ELOG Home Page