Fixed, e748, Sun Jun 25 09:53:44 2017, Adrien Matta, RUN, General, 3-alpha, Run 18 
Junk
Fixed, e748, Sun Jun 25 09:54:08 2017, Adrien Matta, RUN, General, 3-alpha, Run 19  
Source: 3-alpha + 60Co
Trigger: T1-8 or EXL
Fixed, e748, Mon Jun 26 09:15:31 2017, Adrien Matta, RUN, General, 3-alpha, Run 19 : disk quota exceeded 
Run 19 was still running this morning, but file stop writting at 6 O'Clock, when the disk quota exceeded (we wrtoe about 14Go of data, so not that much!)
Fixed, e748, Mon Jun 26 10:26:16 2017, Valérian, EXL, Software, 60Co, Add-back addback.pdf
We implemented the add-back correction with cross-talk subtraction.

On the joined graph, RawEnergy correspond to the sum of the energy in every crystals and Energy correspond to the sum of energy in every crystals with
Fixed, e748, Mon Jun 26 17:38:32 2017, e748, MUST2, General, N/A, CALIMERO 
Luc and Greg fixed Calimero, We have to perform the calibration but there is some work going on with CATS.
Fixed, e748, Tue Jun 27 10:15:38 2017, e748, DAQ, General, , Scalers 
CATS were added to the scalers:
T CATS1 : 3rd scaler channel
T CATS2 : 4th scaler channel 
Fixed, e748, Tue Jun 27 13:47:15 2017, e748, RUN, General, N/A, Run 21 
Calib CATS1:
pedestal - x5  - x2 - full
Fixed, e748, Tue Jun 27 13:47:57 2017, e748, RUN, General, N/A, Run 22, 23 
JUNK
Fixed, e748, Tue Jun 27 13:48:22 2017, e748, RUN, General, N/A, Run 24 
CALIB CATS2:
x5 - x2 - full - pedestal
Fixed, e748, Tue Jun 27 15:39:04 2017, e748, RUN, General, N/A, Run 26 
Calib Cats 2

pedestal, x5, x2, full
Fixed, e748, Tue Jun 27 15:41:53 2017, e748, RUN, General, N/A, Run 27 
Calib CATS 1
pedestal, x5, x2, full
Fixed, e748, Tue Jun 27 17:41:17 2017, e748, RUN, General, 3-alpha, run 28 
Started run #28
3-alpha
Fixed, e748, Tue Jun 27 17:51:24 2017, e748, RUN, General, 3-alpha, Run 29 
Started run #29 at 17h45
3-alpha around 90deg
Fixed, e748, Wed Jun 28 10:52:15 2017, Valérie Lapoux, MUST2, General, , Memo for CALIMERO MUST2 Time Calibration ConfigDAQDasCalimerov2017vlxTMP.pdf
Temporary file indicating the main steps for the time calibration of MUST2 using the Calimero DAQ package program.
Fixed, e748, Wed Jun 28 10:54:34 2017, Valérie Lapoux, RUN, Software, , DAQ problems due to TCP/IP errors ProblemRun29TCPerror.png
Problems occurred during the run #29 at 2h38 Wed. 28th June, with the following error messages written in the Run Control GUI window:

Error rcc MUST2:VMECOM :TCP error  TCP/IP time-out
Fixed, e748, Wed Jun 28 11:02:38 2017, Valérie Lapoux, RUN, General, 3-alpha, Calibration run #31 with Alpha source - MM5 and MM8 Run31startNarvalAlphaSource.png
Run #31 started at 11:01, Wednesday 28th June.
The alpha source is rotated towards the telescopes 5, 8.
Fixed, e748, Wed Jun 28 11:42:06 2017, e748, CATS, General, N/A, Surveyor's positions CATS Position_geometre_CATS.png
 
Fixed, e748, Wed Jun 28 15:07:43 2017, Thomas, CHIO, Software, N/A, Trapezoidal filter for CHIO 
const int nCHIO=200; // nb samples. sera ajuste en manip    
 
 float SIG[nCHIO];
Fixed, e748, Wed Jun 28 15:17:24 2017, Valérie Lapoux, RUN, General, , End of run 31-status Run31stopProbTimeoutGanlx9Chio.png
Run #31 started at 11h01; stopped at 15h13
Problem on ganlx9 VME Chio
 TIMEOUT on the stop process.
Fixed, e748, Thu Jun 29 10:44:45 2017, e748, TARGET, Hardware, CD2, Target and Mask are Mounted IMG_1973.JPGIMG_1954.JPGIMG_1953.JPGIMG_1974.JPG
We mounted the target and mask in the chamber before closing:

The target order on the ladder is the following, starting from the bottom (Target ladder fully flushed inside the chamber with no spacer):