Fixed, e748, Sun Jun 25 09:53:44 2017, Adrien Matta, RUN, General, 3-alpha, Run 18
|
Junk |
Fixed, e748, Sun Jun 25 09:54:08 2017, Adrien Matta, RUN, General, 3-alpha, Run 19
|
Source: 3-alpha + 60Co
Trigger: T1-8 or EXL |
Fixed, e748, Mon Jun 26 09:15:31 2017, Adrien Matta, RUN, General, 3-alpha, Run 19 : disk quota exceeded
|
Run 19 was still running this morning, but file stop writting at 6 O'Clock, when the disk quota exceeded (we wrtoe about 14Go of data, so not that much!) |
Fixed, e748, Mon Jun 26 10:26:16 2017, Valérian, EXL, Software, 60Co, Add-back
|
We implemented the add-back correction with cross-talk subtraction.
On the joined graph, RawEnergy correspond to the sum of the energy in every crystals and Energy correspond to the sum of energy in every crystals with |
Fixed, e748, Mon Jun 26 17:38:32 2017, e748, MUST2, General, N/A, CALIMERO
|
Luc and Greg fixed Calimero, We have to perform the calibration but there is some work going on with CATS. |
Fixed, e748, Tue Jun 27 10:15:38 2017, e748, DAQ, General, , Scalers
|
CATS were added to the scalers:
T CATS1 : 3rd scaler channel
T CATS2 : 4th scaler channel |
Fixed, e748, Tue Jun 27 13:47:15 2017, e748, RUN, General, N/A, Run 21
|
Calib CATS1:
pedestal - x5 - x2 - full
|
Fixed, e748, Tue Jun 27 13:47:57 2017, e748, RUN, General, N/A, Run 22, 23
|
JUNK |
Fixed, e748, Tue Jun 27 13:48:22 2017, e748, RUN, General, N/A, Run 24
|
CALIB CATS2:
x5 - x2 - full - pedestal
|
Fixed, e748, Tue Jun 27 15:39:04 2017, e748, RUN, General, N/A, Run 26
|
Calib Cats 2
pedestal, x5, x2, full
|
Fixed, e748, Tue Jun 27 15:41:53 2017, e748, RUN, General, N/A, Run 27
|
Calib CATS 1
pedestal, x5, x2, full
|
Fixed, e748, Tue Jun 27 17:41:17 2017, e748, RUN, General, 3-alpha, run 28
|
Started run #28
3-alpha
|
Fixed, e748, Tue Jun 27 17:51:24 2017, e748, RUN, General, 3-alpha, Run 29
|
Started run #29 at 17h45
3-alpha around 90deg |
Fixed, e748, Wed Jun 28 10:52:15 2017, Valérie Lapoux, MUST2, General, , Memo for CALIMERO MUST2 Time Calibration
|
Temporary file indicating the main steps for the time calibration of MUST2 using the Calimero DAQ package program. |
Fixed, e748, Wed Jun 28 10:54:34 2017, Valérie Lapoux, RUN, Software, , DAQ problems due to TCP/IP errors
|
Problems occurred during the run #29 at 2h38 Wed. 28th June, with the following error messages written in the Run Control GUI window:
Error rcc MUST2:VMECOM :TCP error TCP/IP time-out |
Fixed, e748, Wed Jun 28 11:02:38 2017, Valérie Lapoux, RUN, General, 3-alpha, Calibration run #31 with Alpha source - MM5 and MM8
|
Run #31 started at 11:01, Wednesday 28th June.
The alpha source is rotated towards the telescopes 5, 8. |
Fixed, e748, Wed Jun 28 11:42:06 2017, e748, CATS, General, N/A, Surveyor's positions CATS
|
|
Fixed, e748, Wed Jun 28 15:07:43 2017, Thomas, CHIO, Software, N/A, Trapezoidal filter for CHIO
|
const int nCHIO=200; // nb samples. sera ajuste en manip
float SIG[nCHIO];
|
Fixed, e748, Wed Jun 28 15:17:24 2017, Valérie Lapoux, RUN, General, , End of run 31-status
|
Run #31 started at 11h01; stopped at 15h13
Problem on ganlx9 VME Chio
TIMEOUT on the stop process. |
Fixed, e748, Thu Jun 29 10:44:45 2017, e748, TARGET, Hardware, CD2, Target and Mask are Mounted   
|
We mounted the target and mask in the chamber before closing:
The target order on the ladder is the following, starting from the bottom (Target ladder fully flushed inside the chamber with no spacer):
|
|