Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Text |
 |
Fixed | e755 |
Mon Jul 2 20:44:46 2018 |
pierre, takeshi, louis, nori, daisuke | RUN | General | Cryo-LH2 | RUN 233 | 37ca + liquid H
20h43 started.
21h31 stop |
 |
Fixed | e738 |
Thu Jul 5 11:08:04 2018 |
pierre, louis daisuke | RUN | General | N/A | RUN 249 | cats 1 pulser calibration. trigger cats1%1 |
 |
Fixed | e755 |
Mon Jun 25 20:01:07 2018 |
olivier, daisuke | DAQ | Hardware | N/A | Another deat time scaler | After RUN 128, we entered D6 to add another
deat time measuring pulses to U2M channel
9. This is supposed to correctly measure |
|
Fixed | e744 |
Wed May 23 10:57:13 2018 |
megumi | DAQ | General | | Photo of the circuit | photo of the circuit area |
15x |
Fixed | e744 |
Wed May 23 13:15:47 2018 |
megumi | DAQ | General | N/A | Time calibration for TDC (EXL) | Time calibrator setting
Range 5.12 us
Period 160 ns
|
|
Fixed | e738 |
Tue Jul 10 12:51:37 2018 |
marlène, olivier, J-C, daisuke | RUN | General | Cryo-LH2 | RUN 330 | 9C + liquid H. Data taking after replacing
CATS1.
12h03 started
|
28x |
Fixed | e738 |
Sat Jul 14 10:14:00 2018 |
marlène, jacques, daisuke | RUN | General | Cryo-LH2 | RUN 382 | 12C + liquid H. Before the run, the beam stopped
for 2 hours due to the gate valve of E9 shut
out the beam. This is because the manually |
9x |
Fixed | e755 |
Mon Jun 25 19:59:55 2018 |
marlène, freddy, benoït | MUST2 | Software | N/A | CsI disabled in MUVI/DAS | |
|
Fixed | e738 |
Sat Jul 14 11:37:58 2018 |
marlène, daisuke | RUN | General | Cryo-LH2 | RUN 383 | 12C + liquid H.
11h33 start.
12h00 Asked PCP to increase the intensity. |
25x |
Fixed | e738 |
Thu Jul 5 10:47:42 2018 |
louis, serge, pierre, daisuke | RUN | General | 3-alpha | RUn 245 | 3 alpha source, off beam, low down position
. FAG 40 Hz. Likely due to beta rays (see
the attachment) |
    |
Fixed | e738 |
Thu Jul 5 10:49:40 2018 |
louis, serge, pierre, daisuke | RUN | General | 3-alpha | RUn 245 | 3 alpha source, off beam, low down position
. FAG 40 Hz. Likely due to beta rays (see
the attachment) |
    |
Fixed | e755 |
Sat Jun 30 04:54:55 2018 |
louis, daisuke | RUN | General | Cryo-LH2 | RUN 194 | Continue 37ca data taking. |
45x |
Fixed | e755 |
Mon Jul 2 01:05:12 2018 |
louis, daisuke | RUN | General | Cryo-LH2 | RUN 220 | 37ca + liq.H.
1h01 started
1h56 ended.Beam stopped due to the trouble |
   |
Fixed | e738 |
Wed Jul 4 18:11:44 2018 |
louis, daisuke | RUN | General | 3-alpha | RUN 243 | MUST2 data taking with the 3 alpha source
(positioned downstream of the target to shoot
T1 to T8). |
   |
Fixed | e755 |
Sat Jun 30 03:18:14 2018 |
louis, Daisuke | RUN | Software | Cryo-LH2 | Beam image after retracting CHIO | the beam seems more focused after retracting
CHIO upstream of M2C. Screenshot taken during
RUN 193. |
|
Fixed | e755 |
Mon Jul 2 08:02:52 2018 |
louis, daisuke, takeshi, didier | RUN | General | Cryo-LH2 | RUN 224 | 37ca + liquid H
8h00 started
10h01 stopped
|
  |
Fixed | e755 |
Mon Jul 2 01:58:07 2018 |
louis daisuke | RUN | General | Cryo-LH2 | RUN 221 | 37ca + liquid H (no beam at times)
1h56 started. no beam
2h03 beam came back with low intensity. Keep |
6x |
Fixed | e755 |
Mon Jul 2 04:02:15 2018 |
louis daisuke | RUN | General | Cryo-LH2 | RUN 222 | 37Ca + liq. H
4h00 started
5h57 ended. |
8x |
Fixed | e755 |
Mon Jul 2 06:01:35 2018 |
louis daisuke | RUN | General | Cryo-LH2 | RUN 223 | 37Ca + liquid H.
5h59 started.40Ca 3.3 micro A.
6h17 beam stop. A few issues including RF. |
7x |
Fixed | e755 |
Wed Jun 13 18:20:02 2018 |
linda, Daisuke, Louis | MUST2 | Hardware | 3-alpha | Run test with heat shield | Run 9: heat shield added with two MYLAR foil
of 2um, vacuum has been made inside target
cell. 4 alpha source |
   |