MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 43 of 48  Not logged in MUST2
Fixed, e738, Mon Jul 9 15:43:50 2018, Pierre Valérie, RUN, General, Cryo-empty, Run 309 scaler_2018-07-09_15h38m55s.pngscaler_2018-07-09_16h10m56s.png
start: 15h36
stop: 16h10

Trigger: OR MM, CATS1 DIV and PLASTIC%

large beam interuption between 15h40 and 16h06
Fixed, e738, Mon Jul 9 17:18:55 2018, e748, RUN, General, Cryo-empty, RUN 311 13x
Run 311
Beam/Detectors Tuning

start: 17h04 stop: 17h16
Beam: 9C
target: empty

Trigger: T1 to T8, CATS1%, PLASTIC%

I=1.5*10⁵pps in CATS1
Purity = 6.3%


HV of plastic has been changed to 2100V
Fixed, e738, Mon Jul 9 18:03:48 2018, Valérie Louis, RUN, General, Cryo-LH2, RUN 312 25x
Run 312

First RUN of 9C on filled LH2 target

start: 17h36 stop: 18h56
Beam: 9C
target: filled

Trigger: T1 to T8, CATS1%3*10⁴, CATS2%3*10⁴, PLASTIC%1*10⁴

I=1.4*10pps in CATS1
Purity = 5.1%


HV of DC wire has been changed from 500V to 530V
Plastic threshold has been changed from 180mV to 70mV

Target has been succefully filled
Fixed, e738, Mon Jul 9 19:16:13 2018, Freddy Louis, RUN, General, Cryo-LH2, RUN 313 to 316 Run317_discri_GECO.png
From RUN 313 to RUN 316:

Tuning dor the Drift Chamber:
  • threshold changed
  • CFD discriminator has been tuned in GECO
  • Buffer size has been change to match with the new setting

DC now works as well as th online visualisation
Acquisition is stable
Fixed, e738, Mon Jul 9 19:24:06 2018, Freddy Valérie Louis, RUN, General, Cryo-LH2, RUN 317 scaler_2018-07-09_19h26m05s.pngvisu_2018-07-09_19h26m13s.pngvisu_2018-07-09_19h28m52s.pngvisu_2018-07-09_19h29m09s.pngscaler_STOP_2018-07-09_19h32m05s.png
Run 317

start: 19h08 stop: 19h30
Beam: 9C
target: filled

Trigger: T1 to T8, CATS1%3*104, CATS2%3*10⁴;, PLASTIC%1*10⁴

I=1.8*10pps in CATS1
Purity = 5.1%
Fixed, e738, Mon Jul 9 20:28:09 2018, Daisuke, Freddy, Louis, Valérie, RUN, General, Cryo-LH2, RUNS 318 to 320 ProblemDAQcrateCATS1RCAt20h.pngProblemDAQcrateCATS1iolan.pngProblemMergerCATSbranch.png
From RUN 318 to RUN 320:
initial problem was that the stop process was not correctly taken into account on Narval. Geco acor was still running.
We killed Narval.
It was impossible to initialize or start run correctly.We did Several kna, kall.
Bugs on the run control server (ps -edf |grep narval or start_acq showed several on-going processes. We removed them). Then the CATS1 crate was not initialized correctly, it remained Offline.
see ProblemDAQcrateCATS1RCAt20h.png ProblemDAQcrateCATS1iolan.png
We rebooted (software mode on Iolan) CATS1 VXI crate, then init..;breakup...init then tried to start but stopped because because we noted merger problems.
See ProblemMergerCATSbranch.png
Then we needed to reinitialize a third time the Narval run control bto recover a correct Run control operation.

Fred S. came to check that we worked well... and that everything was working well.
Fixed, e738, Mon Jul 9 20:33:00 2018, Daisuke Louis Valérie , RUN, General, Cryo-LH2, RUN 321- ok again ! 20x
Run 321 start 20:09
Total beam on CATS ~ 1.7 10**5 /s
Beam of 9C, 7Be, 8B and 6Li
All triggers

CATS1: 670V I ~0.22 ľA; CATS2: 700V I ~ 0.18ľA
We can see spots of tritons in the plots EDE of MUST2 see the plot Run321pidEDEcsIMM1to6zoomPDT.png.
Fixed, e738, Mon Jul 9 22:15:04 2018, DIdier Daisuke Nori Louis Valérie, RUN, General, Cryo-LH2, RUN 322, strip CATS2 X 19 off 7x
Run 322 start: 22h00 stop: 0h21
e748 Exxx 3,7G 10 juil. 00:21 run_0322.dat.09-07-18_21h58m34s
Beam: 9C
target: filled

Trigger: T1 to T8, CATS1% CATS2% PLASTIC%

I=1.6*10⁵pps in CATS1
I=1.8uA primary beam
Purity = 5.2% from T_CATS_HF


From this run, new missing strip in CATS2 X 19

NB: Buffer size for the numexo data was changed after run314. Since then the runs are not correctly converted (smaller size of the root files than before, nearly factor 10.
No (complete) offline run conversion since run 321.
Fixed, e738, Mon Jul 9 23:25:10 2018, takeshi, RUN, General, Cryo-LH2, run summary for 10C beam 
With 10C beam, we have obtained
31.7 hours of liq. H2 target and
1.2 hours of empty target.

see online run summary for detail.
https://docs.google.com/spreadsheets/d/1yErcQcrXPdJjEOfUd9D9KPWWkWQpw5kX4wFze6vwij4/edit#gid=805236919
Fixed, e738, Mon Jul 9 23:29:18 2018, Nori, CATS, General, Cryo-LH2, CATS tracking efficiency run312_plasticq.pngrun312_effexample.png
Analyzed run 312 (9C physics run). CATS calibration files with lowered threshold values
(/home/e748/analysis/nptool/Projects/e755/Calibration/cats/CATS1_X.e738.npt, etc.) were used.
Using the total E information from the plastic, tracking efficiencies for each beam species were estimated.
Two different position reconstruction methods (ASECH and CENTROIDE) were also compared.

(ASECH)
9C  94% (see Attachment 2)
8B  86%
7Be 80%
6Li 68%

(CENTROIDE)
9C  98%
8B  91%
7Be 84%
6Li 75%
Fixed, e738, Tue Jul 10 00:46:26 2018, Shumpei, Valérie, RUN, General, Cryo-LH2, RUN 323 + Brho line settings Run323_scalersAt0h36.pngRun323_TOFcatsHF.pngRun323_ScalersEndRun.png
Run 323 start: 0h20 stop: 2h45
e748 Exxx 3,5G 10 juil. 02:45 run_0323.dat.10-07-18_00h20m04s
Beam: 9C
All Triggers: T1 to T8, CATS1% CATS2% PLASTIC%
Divisions: CATS1, CATS2 3. 10**4 ; Plastic% 10**4

Dead time between 8 and 15%
CATS2 X19 strip not running since Run 322
Total beam I from 1.2 to 1.4*10**5 pps in CATS1, CATS2
I=1.8uA primary beam
Purity = 5.1% of 9C from T_CATS1_HF
Integral 4 peaks NP_T_CATS1_HF = 7341 [channels 10 to 8000];
peak of 8B [channels 10 to 2000]; integ=609 --> 8.3 %
peak 9C [ch. 2600 to 4200]:376 --> 5.1% ;
7Be[channels 4200 to 6300], integ= 4535 --> 61.7%
peak of 6Li [channels 6300 to 8000]: 1834 --> 24.9%
CATS1 670V 0.14 ľA (sparkles at 0.5 ľA)
CATS2 700V 0.12 ľA
= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =
Primary beam 12C 75 MeV/u 1.5 ľA ==> 1.4 10**5 pps on CATS

Brho1(RMN) = 1.7301 T.m ; I _D3P1 = 305.3 A
Brho2(RMN) = 1.6352 T.m ; I _D3P1 = 375.3 A
--> Energy (9C) = 55.3 MeV/u

Brho_DA1(RMN) = 1.6301 T.m ; I _DAP = 164 A
Brho_DA2(RMN) = 1.6555 T.m ; I _DAC2 = 3 A
Wien Filter 0/0 kV
SLITS.
FH31 = +/-20mm;
FH42 = +/-10 ; FV43 = +/-10.4 ; FH51 = +/-30 ;
FH61 = +/-30 ; FV61 = +/-25.5 ; FH62 = +/-15 mm; FV62 = +/-20
= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =
Fixed, e738, Tue Jul 10 01:26:21 2018, Shumpei, OFFLINE, General, Cryo-LH2, Analysis for 10C(p,d)9C and 10C(p,t)8C updated 6x
Used data run run0284-0302 (almost all for 10C beam)
CsI calibration parameters are the same as E755 exp (deuteron optimized),

10C(p,d)9C
Gate:
1. beam position on the target by CATS1&2
2. deuteron gate by dE-E MUST2 T1-T4
Offset of the position of MUST2 T1-T4 was determined by 10C beam direct hit component. Target Z position (beam direction) is shifted 12 mm to match kinematics of 9C g.s.
Ground state of 9C and first excited state of 9C (2.2 MeV) are clear. Higher excited state around 6 MeV.
Statistics for T2 is smaller because 2 CsI crystals are not working (known before E755 exp,).

10C(p,t)8C
Gate:
1. beam position on the target by CATS1&2
2. triton gate by dE-E MUST2 T1-T4
Same position offset of (p,d) is used.
Ground state of 8C is clear, but energy of each CsI crystal seems to be shifted.
Fixed, e738, Tue Jul 10 02:47:10 2018, Shumpei, Valérie, RUN, General, Cryo-LH2, RUN 324 24x
Run 324 start: 2h45 stop 5h10
e748 Exxx 3,8G 10 juil. 05:10 run_0324.dat.10-07-18_02h44m52s
Beam: 9C
All Triggers: T1 to T8, CATS1% CATS2% PLASTIC%
Divisions: CATS1, CATS2 3. 10**4 ; Plastic% 10**4

CATS2 X19 strip not running since Run 322
Total beam I 1.4*10**5 pps in CATS1, CATS2
I=1.8uA primary beam
Purity = 4.7% of 9C from T_CATS1_HF
Integral 4 peaks
peak of 8B [channels 10 to 2000]; 7Be[channels 4200 to 6300];
peak of 6Li [channels 6300 to 8000]:
total NP_T_CATS1_HF = 44060 [channels 10 to 8000];

peak 9C [ch. 2600 to 4200]:2060--> 4.7% ;

CATS1 670V 0.20ľA for beam at 1.4 10**5 pps
CATS2 700V 0.16 ľA

Dead time between 8 and 15%
Fixed, e738, Tue Jul 10 05:12:31 2018, Shumpei, Valérie, RUN, General, Cryo-LH2, RUN 325 Run325_scalersAt5h12.pngRun325_EDECsIMMpidZoomZ3Z4.pngRun325_scalersEndRunCats1TRIP.png
Run 325 start: 5h10 stop 6h53 due to CATS1 -->tripping
e748 Exxx 2,5G 10 juil. 06:53 run_0325.dat.10-07-18_05h09m53s
Beam: 9C
All Triggers: T1 to T8, CATS1% CATS2% PLASTIC%
Divisions: CATS1, CATS2 3. 10**4 ; Plastic% 10**4
CATS2 X19 strip not running since Run 322
Total beam I 1.3 to 1.4 10**5 pps in CATS1, CATS2
I ~ 1.8uA primary beam
Purity = 4.7 to 5% of 9C from T_CATS1_HF
I
CATS1 670V 0.20ľA for beam at 1.4 10**5 pps
CATS2 700V 0.16 ľA

Dead time between 8 and 15%
Fixed, e738, Tue Jul 10 05:23:19 2018, Shumpei, OFFLINE, General, Cryo-LH2, Analysis for 9C beam setting be7li6pd.pngc9b8pd.pngmissing_invariant_mass.png
Used data: run0312 (about 80 minutes data taking).
Analysis for (p,d) channel and invariant mass

CATS1_HF TOF information for beam PID
Wait for more statistics for (p,t) channel
Fixed, e738, Tue Jul 10 05:25:42 2018, Shumpei, BEAM, General, Cryo-LH2, triton contamination in the 9C beam setting triton_contaminant0.pngtriton_contaminant1.pngtriton_contaminant2.png
In MUST2 dE-E plot, strong locus for triton E ~ 40 MeV exists.
Kinematics for triton bellow 45 MeV matches the kinematics of triton 40MeV beam proton elastic scattering.
If coincidence of proton required, still exists for some region (proton forward scattering with enough energy to pass through DSSD).
Kinematics for proton matches the kinematics of recoil proton by 40MeV triton beam.
Sum of the proton and triton energy has a peak around 40 MeV.
Locus still exists with TOF gate by CATS1-HF.

Triton energy for (p,t) reaction will be higher than ~ 50 MeV, so can't be a background.
The total number of triton bellow 45 MeV and above DSSD range in run0312 (80 minutes) is ~ 20000 (~ 4 cps for all the telescope).
Fixed, e738, Tue Jul 10 07:16:16 2018, Shumpei, Valérie, RUN, General, Cryo-LH2, RUN 326 9x
Run 326 start: 6h59

Beam: 9C
All Triggers: T1 to T8, CATS1% CATS2% PLASTIC%
Divisions: CATS1, CATS2 3. 10**4 ; Plastic% 10**4
Dead time between 8 and 15%
CATS2 X19 strip not running since Run 322
Total beam I 1.3 to 1.5 10**5 pps in CATS1, CATS2.
CATS2 700V 0.14 ľA.
I ~ 1.8uA to 2.0 ľA primary beam
We asked PCP to reduce to 1.7 ľA in order to avoid CATS1 tripping.
But CATS1 is continuously tripping even when we decrease the HV from 670 V to 660V then to 650V.
2 minutes ok see scalers at 7h18.
At 7h20 we try CATS1 HV 640V. Tripping.
At 8h02 we try again to put ON HV on CATS1. 640V ok, with I ~ 0.04 ľA (low value) for beam around 10**5 on CATS2.
It is running... (see un326_BeamTracksAt8h09.png )
With low efficiency, but at least we can check the beam trajectories. See Run326_BeamTracksAt8h09.png
Trip at 8h13.
Fixed, e738, Tue Jul 10 12:51:37 2018, marlčne, olivier, J-C, daisuke, RUN, General, Cryo-LH2, RUN 330 28x
9C + liquid H. Data taking after replacing CATS1.
12h03 started
13h54 stop
Fixed, e738, Tue Jul 10 13:59:09 2018, jacques, daisuke, freddy, RUN, General, Cryo-LH2, RUN 331 6x
9C + liquid H
13h56 start. 12C 1.7 electric micro A.
16h51 stop
Fixed, e738, Tue Jul 10 14:22:22 2018, Nori, BEAM, General, Cryo-LH2, Beam image on target run330_imagemust.pngrun330_imagepla.pngrun330_imagecats.png
Reconstructed beam images from run0330.

ELOG Home Page