MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 40 of 48  Not logged in MUST2
Fixed, e755, Tue Jul 3 18:19:30 2018, daisuke, OTHER, General, N/A, Data saved after experiment 7x
DAS: /home/e748/ganacq_manip/e755/das-save/2018-07-03_fin_e755
VIGRU: /home/e748/analysis/GRU/GRU_18_03_12/vigru_e755_final_2018-07-03_18h15.xml
Online: /home/e748/analysis/nptool/Projects/e755/online/2018-07-03_18h24
HT/BT: screenshots attached.
Fixed, e755, Tue Jul 3 18:48:52 2018, takeshi, TARGET, Hardware, Cryo-LH2, temperature log of the target cell0307.pngheatshield0307.png
Here is the temperature log of the liquid hydrogen target,
We kept it about 6 days.
Fixed, e755, Wed Jul 4 15:34:34 2018, Nori, BEAM, General, N/A, 37Ca PID at D6 run332_pid.pdf
A particle identification plot of 37Ca from LISE run 332.
Pinned, e738, Wed Jul 4 17:10:28 2018, daisuke, DAQ, Software, N/A, Second VXI for CATS and syncrhonisation diagnosis 8x
Second VXI crate was addedd for CATS. If the synchronisation is not working, there will be error messages in the display of the chassis in trouble (Desktop IOLAN).

The width of FAG is set 100 ns by default setting for both GMTMASTER and GMTSLAVE. A longer width of FAG of GMT slave (like a few micro sec) will result in failure, as the GMT master cannot wait for a signal from the slave no more than 6 micro second which is defined by the signal CT. Make sure the chronograms of GMT are the same as in the figures attached, in case of synchronisation failure.Also confirm the configuration of CENTRUM master (figure attached).
Fixed, e738, Wed Jul 4 18:11:44 2018, louis, daisuke, RUN, General, 3-alpha, RUN 243  scaler_2018-07-04_18h07m35s.pngvisu_2018-07-04_18h12m36s.pngvisu_2018-07-04_18h12m43s.pngvisu_2018-07-04_18h12m49s.png
MUST2 data taking with the 3 alpha source (positioned downstream of the target to shoot T1 to T8).
Fixed, e738, Wed Jul 4 18:43:29 2018, daisuke, RUN, General, 3-alpha, RUN 244 scaler_2018-07-04_18h38m39s.pngvisu_2018-07-04_18h39m26s.pngvisu_2018-07-04_18h42m32s.pngvisu_2018-07-04_18h43m12s.png
3 alpha source at 'off-beam-axis' position (right center view from upstream). FAG ~40 Hz (mostly from T1-4)
Fixed, e738, Thu Jul 5 10:47:42 2018, louis, serge, pierre, daisuke, RUN, General, 3-alpha, RUn 245 scaler_2018-07-05_10h26m15s.pngvisu_2018-07-05_10h26m16s.pngvisu_2018-07-05_10h26m37s.pngvisu_2018-07-05_10h26m46s.pngvisu_2018-07-05_10h27m13s.png
3 alpha source, off beam, low down position . FAG 40 Hz. Likely due to beta rays (see the attachment)
Fixed, e738, Thu Jul 5 10:49:40 2018, louis, serge, pierre, daisuke, RUN, General, 3-alpha, RUn 245 scaler_2018-07-05_10h26m15s.pngvisu_2018-07-05_10h26m16s.pngvisu_2018-07-05_10h26m37s.pngvisu_2018-07-05_10h26m46s.pngvisu_2018-07-05_10h27m13s.png
3 alpha source, off beam, low down position . FAG 40 Hz. Likely due to beta rays (see the attachment)
Fixed, e738, Thu Jul 5 11:08:04 2018, pierre, louis daisuke, RUN, General, N/A, RUN 249 scaler_2018-07-05_11h04m06s.pngvisu_2018-07-05_11h04m05s.png
cats 1 pulser calibration. trigger cats1%1
Fixed, e738, Thu Jul 5 14:12:18 2018, Louis, MUST2, General, 3-alpha, RUN 253 calib alpha scaler_2018-07-05_13h24m41s.pngvisu_2018-07-05_13h24m40s.pngvisu_2018-07-05_13h24m48s.pngvisu_2018-07-05_13h25m03s.pngvisu_2018-07-05_13h26m10s.png
Pinned, e738, Thu Jul 5 18:33:54 2018, gilles,fred,J-C,daisuke, DAQ, Hardware, N/A, Caviar DAQ merged. rc_2018-07-05_18h32m56s.pngdas_2018-07-05_18h32m46s.pngdas_2018-07-05_18h32m18s.pngscaler_2018-07-05_18h32m06s.pngdesktop_2018-07-05_18h25m17s.png
The VME crate of CAVIAR was integraded to the DAQ controlled by the GMT master of MUST2.

One caution. The visual scaler will not refresh if the TGV module of CAVIAR is listed in the configuration files
/home/e748/ganacq_manip/e755/das-save/e755_echelles.sav
and
/home/e748/ganacq_manip/e755/das-save/echelle.sav


Every time DAS configurations are saved, these files will be rewritten and the TGV module will be added. In such as case, run the macro

/home/e748/ganacq_manip/e755/das-save/echelle_without_caviar/copy_echelles.sh

This will remove the TGV module from these configuration files and make the visual scaler refreshing.
Fixed, e738, Thu Jul 5 19:22:18 2018, daisuke, RUN, General, 3-alpha, RUN 256 scaler_2018-07-05_19h21m55s.pngvisu_2018-07-05_19h21m38s.pngvisu_2018-07-05_19h21m41s.pngvisu_2018-07-05_19h21m44s.png
3 alpha measurement after merging CAVIAR vme to the DAQ
Pinned, e738, Thu Jul 5 19:26:31 2018, daisuke, MUST2, Hardware, N/A, MUST2 BT/HT screenshot_2018-07-05_19h23m54s.pngscreenshot_2018-07-05_19h24m07s.pngscreenshot_2018-07-05_19h24m17s.pngscreenshot_2018-07-05_19h24m24s.png
Pinned, e738, Fri Jul 6 09:40:04 2018, daisuke, OTHER, General, N/A, kinematics plots pt_kinema_30deg_1050um.pdfpt_kinema_30deg_2250um.pdfpt_kinema_30deg_750um_7be.pdf
Fixed, e738, Fri Jul 6 17:14:50 2018, daisuke, ONLINE, Software, N/A, Online analysis code: e755.detector screenshot_2018-07-06_17h14m09s.pngscreenshot_2018-07-06_17h14m25s.pngscreenshot_2018-07-06_17h16m43s.png
The file e755.detector was updated to include the following parameters to ModularLeaf.


CAVIAR_1_16
CAVIAR_17_32
CAVIAR_33_48
CAVIAR_49_64
CAVIAR_65_80
CAVIAR_81_96
    Fixed, e738, Fri Jul 6 18:43:39 2018, Nori, ONLINE, Software, N/A, Online analysis code: e755.detector Capture_du_2018-07-06_18-46-31.png
The modular label file has to be modified.

lpcgrit:/home/e748/analysis/nptool/Projects/e755 $ cat ModularLabel_new.txt 
GATCONFMASTER
GATCONFSLAVE
DATATRIG_CATS
TGV_CONFDEC
AGAVA_LTAGH
AGAVA_LTAGL_UP
AGAVA_LTAGL
PLASTIC_Q
T_CATS1_HFdiv
T_CATS1_HF
T_CATS2_HF
T_CATS2_CATS1
T_MM_CATS1
T_MM_CATS2
T_CATS1_Plast
T_CATS2_Plast
T_CATS1_CAVIAR
T_CATS2_CAVIAR
E_D4
E1_D6
E2_D6
T_D4_HF
T1_D6_HF
T2_D6_HF
T_E1D6_CAVIAR
T_CATS_HF_LISE
T_D6_CATS
SCALER_DT
SCALER_CATS1
SCALER_CATS2
SCALER_CAVIAR
SCALER_PLASTIC
SCALER_100Hz
ADC2_VOIE_0
ADC2_VOIE_1
ADC2_VOIE_2
ADC2_VOIE_3
ADC2_VOIE_4
ADC2_VOIE_5
CAVIAR_1_16
CAVIAR_17_32
CAVIAR_33_48
CAVIAR_49_64
CAVIAR_65_80
CAVIAR_81_96

This file is symlinked to /home/e748/analysis/nptool/Projects/e755/conversion/ModularLabel.txt.
We confirmed Caviar data is accessible (see Attachment).
Fixed, e738, Sat Jul 7 08:16:50 2018, daisuke, MUST2, Hardware, N/A, MUST2 BT/HT screenshot_2018-07-07_08h15m39s.pngscreenshot_2018-07-07_08h15m54s.pngscreenshot_2018-07-07_08h16m04s.pngscreenshot_2018-07-07_08h16m13s.png
Pinned, e738, Sat Jul 7 08:26:27 2018, Nori, BEAM, General, N/A, Beam production procedure e738beamproduction.pdf
 
Pinned, e738, Sat Jul 7 08:29:53 2018, daisuke, OTHER, Social, N/A, Shift table 2018-05-08_lise_must2_crypta_schedule_-_Shift_(July_7_to_15).pdf
https://docs.google.com/spreadsheets/d/1jyfw2LT3RGfDY4bcN-9zepZoe2uE89b5CnF4tXzqzj8/edit#gid=716299251
Fixed, e738, Sat Jul 7 14:33:45 2018, shumpei takeshi megumi, TARGET, Hardware, Cryo-LH2, Liquid H2 status liquefying0707.png
We start liquifying H2 at 14:09 and seems to be filled at 14:29.
Fixed, e738, Sat Jul 7 19:47:21 2018, daisuke, MUST2, Hardware, N/A, MUST2 BT/HT screenshot_2018-07-07_19h46m29s.pngscreenshot_2018-07-07_19h46m19s.pngscreenshot_2018-07-07_19h46m00s.pngscreenshot_2018-07-07_19h45m41s.pngscreenshot_2018-07-07_19h45m13s.png

ELOG Home Page