MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 40 of 48  Not logged in MUST2
Fixed, e755, Tue Jul 3 18:19:30 2018, daisuke, OTHER, General, N/A, Data saved after experiment 7x
DAS:    /home/e748/ganacq_manip/e755/das-save/2018-07-03_fin_e755
VIGRU:  /home/e748/analysis/GRU/GRU_18_03_12/vigru_e755_final_2018-07-03_18h15.xml
Online: /home/e748/analysis/nptool/Projects/e755/online/2018-07-03_18h24
Fixed, e755, Tue Jul 3 18:48:52 2018, takeshi, TARGET, Hardware, Cryo-LH2, temperature log of the target cell0307.pngheatshield0307.png
Here is the temperature log of the liquid hydrogen target,
We kept it about 6 days. 
Fixed, e755, Wed Jul 4 15:34:34 2018, Nori, BEAM, General, N/A, 37Ca PID at D6 run332_pid.pdf
A particle identification plot of 37Ca from LISE run 332.
Pinned, e738, Wed Jul 4 17:10:28 2018, daisuke, DAQ, Software, N/A, Second VXI for CATS and syncrhonisation diagnosis 8x
Second VXI crate was addedd for CATS. If the synchronisation is not working, there will be error messages in the display of the chassis in trouble (Desktop
IOLAN).
Fixed, e738, Wed Jul 4 18:11:44 2018, louis, daisuke, RUN, General, 3-alpha, RUN 243  scaler_2018-07-04_18h07m35s.pngvisu_2018-07-04_18h12m36s.pngvisu_2018-07-04_18h12m43s.pngvisu_2018-07-04_18h12m49s.png
MUST2 data taking with the 3 alpha source (positioned downstream of the target to shoot T1 to T8). 
Fixed, e738, Wed Jul 4 18:43:29 2018, daisuke, RUN, General, 3-alpha, RUN 244 scaler_2018-07-04_18h38m39s.pngvisu_2018-07-04_18h39m26s.pngvisu_2018-07-04_18h42m32s.pngvisu_2018-07-04_18h43m12s.png
3 alpha source at 'off-beam-axis' position (right center view from  upstream). FAG ~40 Hz (mostly from T1-4)
Fixed, e738, Thu Jul 5 10:47:42 2018, louis, serge, pierre, daisuke, RUN, General, 3-alpha, RUn 245 scaler_2018-07-05_10h26m15s.pngvisu_2018-07-05_10h26m16s.pngvisu_2018-07-05_10h26m37s.pngvisu_2018-07-05_10h26m46s.pngvisu_2018-07-05_10h27m13s.png
3 alpha source, off beam, low down position . FAG 40 Hz. Likely due to beta rays (see the attachment)
Fixed, e738, Thu Jul 5 10:49:40 2018, louis, serge, pierre, daisuke, RUN, General, 3-alpha, RUn 245 scaler_2018-07-05_10h26m15s.pngvisu_2018-07-05_10h26m16s.pngvisu_2018-07-05_10h26m37s.pngvisu_2018-07-05_10h26m46s.pngvisu_2018-07-05_10h27m13s.png
3 alpha source, off beam, low down position . FAG 40 Hz. Likely due to beta rays (see the attachment)
Fixed, e738, Thu Jul 5 11:08:04 2018, pierre, louis daisuke, RUN, General, N/A, RUN 249 scaler_2018-07-05_11h04m06s.pngvisu_2018-07-05_11h04m05s.png
cats 1 pulser calibration. trigger cats1%1
Fixed, e738, Thu Jul 5 14:12:18 2018, Louis, MUST2, General, 3-alpha, RUN 253 calib alpha scaler_2018-07-05_13h24m41s.pngvisu_2018-07-05_13h24m40s.pngvisu_2018-07-05_13h24m48s.pngvisu_2018-07-05_13h25m03s.pngvisu_2018-07-05_13h26m10s.png
 
Pinned, e738, Thu Jul 5 18:33:54 2018, gilles,fred,J-C,daisuke, DAQ, Hardware, N/A, Caviar DAQ merged. rc_2018-07-05_18h32m56s.pngdas_2018-07-05_18h32m46s.pngdas_2018-07-05_18h32m18s.pngscaler_2018-07-05_18h32m06s.pngdesktop_2018-07-05_18h25m17s.png
The VME crate of CAVIAR was integraded to the DAQ controlled by the GMT master of MUST2. 

One caution. The visual scaler will not refresh if the TGV module of CAVIAR is listed in the configuration files
Fixed, e738, Thu Jul 5 19:22:18 2018, daisuke, RUN, General, 3-alpha, RUN 256 scaler_2018-07-05_19h21m55s.pngvisu_2018-07-05_19h21m38s.pngvisu_2018-07-05_19h21m41s.pngvisu_2018-07-05_19h21m44s.png
3 alpha measurement after merging CAVIAR vme to the DAQ
Pinned, e738, Thu Jul 5 19:26:31 2018, daisuke, MUST2, Hardware, N/A, MUST2 BT/HT screenshot_2018-07-05_19h23m54s.pngscreenshot_2018-07-05_19h24m07s.pngscreenshot_2018-07-05_19h24m17s.pngscreenshot_2018-07-05_19h24m24s.png
 
Pinned, e738, Fri Jul 6 09:40:04 2018, daisuke, OTHER, General, N/A, kinematics plots pt_kinema_30deg_1050um.pdfpt_kinema_30deg_2250um.pdfpt_kinema_30deg_750um_7be.pdf
 
Fixed, e738, Fri Jul 6 17:14:50 2018, daisuke, ONLINE, Software, N/A, Online analysis code: e755.detector screenshot_2018-07-06_17h14m09s.pngscreenshot_2018-07-06_17h14m25s.pngscreenshot_2018-07-06_17h16m43s.png
The file e755.detector was updated to include the following parameters to ModularLeaf. 

    Fixed, e738, Fri Jul 6 18:43:39 2018, Nori, ONLINE, Software, N/A, Online analysis code: e755.detector Capture_du_2018-07-06_18-46-31.png
The modular label file has to be modified.

lpcgrit:/home/e748/analysis/nptool/Projects/e755 $ cat ModularLabel_new.txt 
Fixed, e738, Sat Jul 7 08:16:50 2018, daisuke, MUST2, Hardware, N/A, MUST2 BT/HT screenshot_2018-07-07_08h15m39s.pngscreenshot_2018-07-07_08h15m54s.pngscreenshot_2018-07-07_08h16m04s.pngscreenshot_2018-07-07_08h16m13s.png
 
Pinned, e738, Sat Jul 7 08:26:27 2018, Nori, BEAM, General, N/A, Beam production procedure e738beamproduction.pdf
 
Pinned, e738, Sat Jul 7 08:29:53 2018, daisuke, OTHER, Social, N/A, Shift table 2018-05-08_lise_must2_crypta_schedule_-_Shift_(July_7_to_15).pdf
https://docs.google.com/spreadsheets/d/1jyfw2LT3RGfDY4bcN-9zepZoe2uE89b5CnF4tXzqzj8/edit#gid=716299251
Fixed, e738, Sat Jul 7 14:33:45 2018, shumpei takeshi megumi, TARGET, Hardware, Cryo-LH2, Liquid H2 status liquefying0707.png
We start liquifying H2 at 14:09 and seems to be filled at 14:29.
Fixed, e738, Sat Jul 7 19:47:21 2018, daisuke, MUST2, Hardware, N/A, MUST2 BT/HT screenshot_2018-07-07_19h46m29s.pngscreenshot_2018-07-07_19h46m19s.pngscreenshot_2018-07-07_19h46m00s.pngscreenshot_2018-07-07_19h45m41s.pngscreenshot_2018-07-07_19h45m13s.png
 

ELOG Home Page