MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 32 of 48  Not logged in MUST2
Fixed, e755, Sat Jun 23 02:28:03 2018, daisuke, louis, jean-charles, RUN, Software, N/A, RUN 63 (40Ca + liq. H) scalers and histograms 10x
 
Fixed, e755, Sat Jun 23 04:16:03 2018, Louis, OFFLINE, General, CH2, deltaE E dEE_noCalib_run0063.jpg
here a plot of energy loss in DSSD in function of energy in CsI. One can distinguish proton and alpha. Energy calibration of the CsI is needed to identify
clearly the tritons
Fixed, e755, Sat Jun 23 06:10:01 2018, shumpei, OFFLINE, Software, CH2, 40Ca(p,d)39 reaction tgt.pdfd.pdf40capd.pdfspectre_en_energie_39Ca.PNG
Quick off-line analysis for 40Ca(p,d)39 reaction is shown.
Used gate - target image and dE-E cut for deutron locus
Kinematics is also shown. Energy is shifted but seems good.
Fixed, e755, Sat Jun 23 14:07:40 2018, Valerian Fairouz, RUN, General, N/A, Problem from Narval narval_crash_problem.png
Narval actors went crazy see joined images

run 75 must be trash as it created 18 files of 4Go in 10 minutes : 
Fixed, e755, Sat Jun 23 17:07:35 2018, daisuke, RUN, Social, Cryo-LH2, Run summary 40Ca(p,t) 

total 698 min or 11.6 hours (RUN 63 to 81)
Fixed, e755, Sat Jun 23 18:01:58 2018, Valerian Maurycy, OFFLINE, General, Cryo-LH2, Kinematics Line ELab_Theta_2H.pdfELab_Theta_3H.pdfELab_Theta_3He.pdfELab_Theta_4He.pdf
Using Run 63-64 we drew Kinematics Lines.
Fixed, e755, Sat Jun 23 19:23:19 2018, Nori, OFFLINE, General, Cryo-LH2, 40Ca(p,d) analysis 7x
Analysis of run0072 (two hours accumulation).

Attachment 1:
Fixed, e755, Sat Jun 23 19:41:49 2018, Valerian, OFFLINE, General, Cryo-LH2, De_E plot DE_E_run81.pdf
 
    Fixed, e755, Sat Jun 23 20:07:49 2018, Nori, OFFLINE, General, Cryo-LH2, 40Ca(p,d) analysis 
Order-of-magnitude estimate of the target thickness.

We have about 5000 counts of 40Ca(p,d)39Ca(g.s.) in an angular range of 10-30 degrees.
Fixed, e755, Sat Jun 23 20:09:00 2018, e755 - Louis, Valérie, RUN, General, Cryo-LH2, Summary of Runs 83 and 84 19x
CATS beam 1.7 10**5 /s
Run 84 start @ 19h54 stop @ 20h16 on problem with CO. 
the PCP said: Maybe 10 minutes of beam stop. Let's see.
Fixed, e755, Sat Jun 23 20:56:15 2018, e755 - Louis, Valérie, RUN, General, Cryo-LH2, Run 85 Run85_scalersAt20h48.pngrun85Catsprofiles.png
CATS beam 1.8 10**5 /s
Beam back at 20h46
Run 85 start @ 20h46 stop @21h02
Fixed, e755, Sat Jun 23 21:17:03 2018, e755 - Louis, Daisuke,Shumpei, Takeshi, Nori, Valérie, RUN, General, Cryo-LH2, Run 86-Test measurement, (heating target) run86Scalersat21h17.png
CATS beam 1.8 10**5 /s
 Target temperature increasing during the run. 
Run 86 start @ 21h05 stop @21h41
Fixed, e755, Sat Jun 23 21:51:04 2018, e755 - Louis, Daisuke,Shumpei, Takeshi, Nori, Valérie, RUN, General, Cryo-LH2, Run 87-Empty target measurement run87Scalersat21h50.png
CATS beam 1.8 10**5 /s
  
Run 87 start @ 21h42 stop @ 21h52
Fixed, e755, Sat Jun 23 21:52:01 2018, takeshi, TARGET, Hardware, N/A, evaporation of the H2 target evapolation2206.png
Here is the temperature log when we evaporate the liquid H2 by heater.
The black line is what we call sensor A, which we monitor usually, and the red line is sensor B, which is the closest sensor to the target window.
Fixed, e755, Sat Jun 23 22:03:17 2018, takeshi, TARGET, Hardware, , temperasure log of the target temperature2306_3.pngheatshield2306_3.pngcell2306_3.png
I would report the temperature log of the liquid hydrogen target.
We consider it was liquid during the beam time up to now by the beam profile data on the target.
Fixed, e755, Sat Jun 23 22:08:43 2018, e755 - Louis, Daisuke,Shumpei, Takeshi, Nori, Valérie, RUN, General, Cryo-LH2, Run 88-Empty target measurement 10x
CATS beam 1.8 10**5 /s
  
Run 88 start @ 22h07 
Fixed, e755, Sat Jun 23 22:42:33 2018, e755 - Louis, Valérie, MUST2, Hardware, Cryo-LH2, Status of MUST2 telescopes 23 june 18 TempMuvi1MufeeXTel1.pngTempMuvi2MufeeYTel6.pngTempMuvi2MufeeXTel6.pngTempMuvi2MufeeXTel8.pngRun88scalersAt23hORDI.png
Temperatures on the Mufeex-Y cards:

Temperature set on the regulator -4°C. 
Fixed, e755, Sat Jun 23 22:47:21 2018, daisuke, TARGET, Hardware, N/A, Target images for Liq. H and empty target run85Catsprofiles.pngRun88emptyT_CATSbeam.png
Attachment 1: RUN 85 with liq.H
Attachment 2: RUN 88 with empty cell. 
Fixed, e755, Sat Jun 23 23:31:12 2018, e755 - Louis, Valérie, RUN, General, Cryo-LH2, Run 89-Empty target measurement Run89CatsProfile.png
CATS beam 1.5 10**5 /s
  
Run 89 start @ 23h29 
Fixed, e755, Sat Jun 23 23:38:32 2018, takeshi, RUN, Social, Cryo-LH2, run summary for 40Ca beam 
run 63-85, total 15.4 hours data was taken

start                           stop          duration  runname

ELOG Home Page