MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 32 of 48  Not logged in MUST2
New entries since:Thu Jan 1 01:00:00 1970
Status ExpNbr Date Author Type Category Target-Source Subject Text Attachments
Fixede755 Sun Jun 24 09:48:46 2018 FrancoisBEAMGeneral No beam9H10: D5 stopped at 9H10. We asked for the
beam.
  
Fixede755 Sun Jun 24 12:10:35 2018 takeshiTARGETHardware target temperature during warming upI would share the temperature log of the target
cell during warming it up.
The thick line is the heat shield and the
 warming2406.png 
Fixede755 Sun Jun 24 13:20:51 2018 takeshiTARGETHardwareN/Astart target coolingWe started cooling the target cell at 13h03.
It would take 4 - 5 hours to cooling the
cell enough low for liquifying hydrogen.
 cooling.png 
Fixede755 Sun Jun 24 13:25:30 2018 Fred, valérian, daisukeDAQSoftwareN/AScalers to be recordedThe U2M scaler data cannot be recorded to
the data in the current version of Narval.
So there were no scaler data during the measurement
 run_0092_scaler_record_check.png 
Fixede755 Sun Jun 24 16:11:38 2018 daisukeONLINESoftwareN/AAutomated screenshotautomated screenshot commands

shot: Capture the window selected by the
 screenshot_2018-06-24_18h06m11s.pngscreenshot.sh 
Fixede755 Sun Jun 24 19:51:09 2018 Faïrouz, daisukeMUST2SoftwareN/AMUST2 threshold from 1 MeV to 0.4 MeVIt was found that the energy threshold of
the strips was as high as 1 MeV. This threshold
setting was chosen for the calibration and
 das_2018-06-24_19h33m36s.pngdas_2018-06-24_19h49m33s.png 
Fixede755 Sun Jun 24 21:12:25 2018 e755- ValérieDAQHardware GMT chronogrammesSince Run 103 
MASTER FAG 100 ns
SLAVE 100 ns
 GMTchronoMaster.pngGMTslaveChrono.png 
Fixede755 Sun Jun 24 21:36:24 2018 e755-Daisuke, Louis, Olivier, Pierre, ValérieRUNGeneralCryo-emptySummary of the evening runs 101-105 run 101 Trigger Cats 2 div; div =1
Run 102
run 103
  
Fixede755 Sun Jun 24 22:13:29 2018 takeshiTARGETHardwareN/Atemperature log of the targetWe liquefied the hydrogen target around 22:00.

I would share the temperature log of the
 temperature2406.pngliquiefy2406.png 
Fixede755 Sun Jun 24 22:13:30 2018 valérie, daisukeRUNGeneralCryo-emptyRUN 106 empty target run Run 106 Trigger: MUST2 all
start @ 21h31; stop @21h44
e748 Exxx 168154021 24 juin 21:44 /data/e748X/e755/acquisition/run/run_0106.dat.24-06-18_21h31m26s
 6x 
Fixede755 Sun Jun 24 22:18:50 2018 Daisuke, Louis, Olivier, ValérieRUNGeneralCryo-LH2RUN 107 run 107 start@ 22h15; stop@ 22h37
e748 Exxx  689278077 24 juin  22:37 /data/e748X/e755/acquisition/run/run_0107.dat.24-06-18_22h15m16s
 Run107scalersAt22h17.pngTriggerMMandCATSRun107.pngTriggerMM2Run107ProfileCats.png 
Fixede755 Sun Jun 24 22:25:53 2018 shumpeiMUST2HardwareCryo-emptythreshold for DSSDs of MUST2Threshold of DSSDs were changed (see entry
638).
Run 106 was analyzed and now the threshold
 pid_threshold.pdf 
Fixede755 Sun Jun 24 22:26:46 2018 Daisuke, Louis, Olivier, ValérieMUST2GeneralCryo-LH2HV on MUST2, currents, CATSNB: SiLi1 T7 has tripped during the evening
(since Run 104)
It should be put on again (better to increase
 HVonMUST2mm1to4.pngHVonMUST2mm5to8andCats.png 
Fixede755 Sun Jun 24 22:45:41 2018 Daisuke, Fairouz, Louis, Olivier, ValérieRUNGeneralCryo-LH2RUN 108Run 108 24 june start @ 22h38 stop@ 22h54
e748 Exxx   10068143 24 juin  22:54 /data/e748X/e755/acquisition/run/run_0108.dat.24-06-18_22h38m15s
Triggers Cats 1 and Cats2 DIV= 3.10**4
 Run108_TriggersCats.pngRun108_scalersAt22h43.png 
Fixede755 Sun Jun 24 23:07:45 2018 Daisuke, Fairouz, Louis, Olivier, ValérieRUNGeneralCryo-LH2RUN 109Run 109 24 june start @ 22h54 stop@ 23h14
e748 Exxx    9723325 24 juin  23:14 /data/e748X/e755/acquisition/run/run_0109.dat.24-06-18_22h54m26s
Triggers Cats 1 and Cats2 DIV= 3.10**4
 Run109_ScalersAt22h56.pngRun109_CaTSslits10-8.5mm_W1.4kV.pngRun109_CaTSslitsFV43at10mm_W2kV.pngRun109filledTargetOKat16KprojBinY.pngRun109_ProfileCatsTargetFrame.png 
Fixede755 Sun Jun 24 23:17:01 2018 Daisuke, Fairouz, Olivier, ValérieRUNGeneralCryo-LH2RUN 110Run 110 24 june start @  23h15 stop @ 23h56

e748 Exxx 1339167483 24 juin  23:56 /data/e748X/e755/acquisition/run/run_0110.dat.24-06-18_23h14m53s
 Run110-projCATS2-CAVIAR.png 
Fixede755 Mon Jun 25 00:13:48 2018 Valérie +Lise team: Jean-Charles+Target: TakeshiRUNGeneralCryo-LH2RUN 111Run 111  25th June start @ 0h stop @1h13

e748 Exxx 3590054877 25 juin  01:14 /data/e748X/e755/acquisition/run/run_0111.dat.24-06-18_23h59m52s
 16x 
Fixede755 Mon Jun 25 01:17:47 2018 Valérie +Lise team: Jean-Charles+Target: TakeshiRUNGeneralCryo-LH2RUN 112Run 112 25th June start @ 1h14 stop @ 2h34
e748 Exxx 3769078581 25 juin  02:34 /data/e748X/e755/acquisition/run/run_0112.dat.25-06-18_01h14m03s
 Target seems to be still ok and filled!
 6x 
Fixede755 Mon Jun 25 02:34:30 2018 Valérie +Target: TakeshiRUNGeneralCryo-LH2RUN 113Run 113 25th June start @ 2h34 stop @ 3h57
e748 Exxx 3957925525 25 juin  03:57 /data/e748X/e755/acquisition/run/run_0113.dat.25-06-18_02h34m10s
  
 11x 
Fixede755 Mon Jun 25 03:14:38 2018 e755- ValérieMUST2HardwareCryo-LH2HV on MUST2, currents, CATSHV and currents on DSSDs and SiLi at 3h20

Telescopes T
  

ELOG Home Page