Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Fixed | e755 |
Sun Jun 24 09:48:46 2018 |
Francois | BEAM | General | | No beam |
9H10: D5 stopped at 9H10. We asked for the beam.
9H48: Still no beam. There is a problem with the beam current limits set in the accelerator. They have to change it from 40 nAe between CO1 and CSS1 to 3.8 µAe after CSS2.
10H05: Still no beam. Vincent arrived for the air conditioning of D6.
10H23: No beam. They have to re-align the beam in the alpha line.
11H45: Beam is back after alignment of the entrance of the LISE line |
Fixed | e755 |
Sun Jun 24 12:10:35 2018 |
takeshi | TARGET | Hardware | | target temperature during warming up |
I would share the temperature log of the target cell during warming it up.
The thick line is the heat shield and the thin line is the cell.
The heat shield may takes 2 hours to reach 200 K and 6 hours for 270K.
Note that we need 45 minutes to evaporate liquid hydrogen before warming up. |
Fixed | e755 |
Sun Jun 24 13:20:51 2018 |
takeshi | TARGET | Hardware | N/A | start target cooling |
We started cooling the target cell at 13h03.
It would take 4 - 5 hours to cooling the cell enough low for liquifying hydrogen.
|
Fixed | e755 |
Sun Jun 24 13:25:30 2018 |
Fred, valérian, daisuke | DAQ | Software | N/A | Scalers to be recorded |
The U2M scaler data cannot be recorded to the data in the current version of Narval. So there were no scaler data during the measurement of 40Ca.
To resolve the situation, we added register parameters for specified channels of U2M. This allows us to record the counts of a given channel at each event.
Here is the procedure by Fred
---
dans l'onglet Parametres de l'U2M, créer un "parametre sur registre" en choisissant le registre U2M_SCALERS et l'item correspondant à la voie désirée (item 0 pour la première voie, item 1 pour la deuxième voie...).
Sauver la config DAS (donc attention à ce qu'elle soit entièrement correcte, notamment pour les MUVI ...).
Ouvrir le fichier action, ajouter "READ/PARAM=nom_du_parametre"
Suaver le fichier action puis le compiler.
INIT dans le Run Control.
Relanceer le online.
---
Notes:
- the parameter name should be 15 characters or shorter. If not, the compilation will take forever.
- More registers, more dead time. So we included only CATS, CAVIAR, Plastic, DT and 100 Hz clock. |
Fixed | e755 |
Sun Jun 24 16:11:38 2018 |
daisuke | ONLINE | Software | N/A | Automated screenshot |
automated screenshot commands
shot: Capture the window selected by the mouse
shotall: Capture the current display
shotvisu: Capture Vigru window
shotsca: Capture Scaler window
shotdas: Capture DAS window
shotrc: Capture Run controller window
img: Move to the save folder /home/e748/Images/e738_e755
Shotcut icons are available on the Desktop (in the picture in the attachment 1).
PNG images will be stored to:
/home/e748/Images/e738_e75
The macros are in the same directory.
/home/e748/Images/e738_e755/screenshot.sh
*** To capture a window, move to the workspace where the given window exists. The window is not necessary to be active, but should be unfolded. |
Fixed | e755 |
Sun Jun 24 19:51:09 2018 |
Faïrouz, daisuke | MUST2 | Software | N/A | MUST2 threshold from 1 MeV to 0.4 MeV |
It was found that the energy threshold of the strips was as high as 1 MeV. This threshold setting was chosen for the calibration and was never set back to the nominal threshold (0.4 MeV) for experiments.
Lowered to 0.4 MeV.
Note that due to the low energy threshold, triton of energies higher than 70 MeV were partially rejected during the measurement of 40Ca(p,t). |
Fixed | e755 |
Sun Jun 24 21:12:25 2018 |
e755- Valérie | DAQ | Hardware | | GMT chronogrammes |
Since Run 103
MASTER FAG 100 ns
SLAVE 100 ns |
Fixed | e755 |
Sun Jun 24 21:36:24 2018 |
e755-Daisuke, Louis, Olivier, Pierre, Valérie | RUN | General | Cryo-empty | Summary of the evening runs 101-105 |
run 101 Trigger Cats 2 div; div =1
Run 102
run 103
Run 104 Trigger Cats 2 div; div =1 I~ 10 nA
run 105 Trigger Cats 1 div (div was thought to be 10**4 but it seems not the cas when we looked at the FAg).
-r--r--r-- 1 e748 Exxx 98187 24 juin 20:36 /data/e748X/e755/acquisition/run/run_0101.dat.24-06-18_20h31m25s
-r--r--r-- 1 e748 Exxx 57497 24 juin 20:43 /data/e748X/e755/acquisition/run/run_0102.dat.24-06-18_20h38m29s
-r--r--r-- 1 e748 Exxx 48984849 24 juin 20:51 /data/e748X/e755/acquisition/run/run_0103.dat.24-06-18_20h45m02s
-r--r--r-- 1 e748 Exxx 1328045829 24 juin 21:20 /data/e748X/e755/acquisition/run/run_0104.dat.24-06-18_20h52m33s
-r--r--r-- 1 e748 Exxx 1227627571 24 juin 21:30 /data/e748X/e755/acquisition/run/run_0105.dat.24-06-18_21h21m00s
lpcgrit:/home/e748/analysis/nptool/Projects/e755 $ ls -lrt /data/e748X/e755/acquisition/run/run*dat* |
Fixed | e755 |
Sun Jun 24 22:13:29 2018 |
takeshi | TARGET | Hardware | N/A | temperature log of the target |
We liquefied the hydrogen target around 22:00.
I would share the temperature log of the liquid hydrogen target during cooling and liquifying.
Black line is today and the other colors represent the references , The thicker liens are the heat shield and the thinner lines are the cell.
The behavior is almost same as the previous logs and seems okay. |
Fixed | e755 |
Sun Jun 24 22:13:30 2018 |
valérie, daisuke | RUN | General | Cryo-empty | RUN 106 empty target run |
Run 106 Trigger: MUST2 all
start @ 21h31; stop @21h44
e748 Exxx 168154021 24 juin 21:44 /data/e748X/e755/acquisition/run/run_0106.dat.24-06-18_21h31m26s |
Fixed | e755 |
Sun Jun 24 22:18:50 2018 |
Daisuke, Louis, Olivier, Valérie | RUN | General | Cryo-LH2 | RUN 107 |
run 107 start@ 22h15; stop@ 22h37
e748 Exxx 689278077 24 juin 22:37 /data/e748X/e755/acquisition/run/run_0107.dat.24-06-18_22h15m16s |
Fixed | e755 |
Sun Jun 24 22:25:53 2018 |
shumpei | MUST2 | Hardware | Cryo-empty | threshold for DSSDs of MUST2 |
Threshold of DSSDs were changed (see entry 638).
Run 106 was analyzed and now the threshold seems about 0.4 MeV. |
Fixed | e755 |
Sun Jun 24 22:26:46 2018 |
Daisuke, Louis, Olivier, Valérie | MUST2 | General | Cryo-LH2 | HV on MUST2, currents, CATS |
NB: SiLi1 T7 has tripped during the evening (since Run 104)
It should be put on again (better to increase the HV during a beam stop) |
Fixed | e755 |
Sun Jun 24 22:45:41 2018 |
Daisuke, Fairouz, Louis, Olivier, Valérie | RUN | General | Cryo-LH2 | RUN 108 |
Run 108 24 june start @ 22h38 stop@ 22h54
e748 Exxx 10068143 24 juin 22:54 /data/e748X/e755/acquisition/run/run_0108.dat.24-06-18_22h38m15s
Triggers Cats 1 and Cats2 DIV= 3.10**4
I ~ 2. 10**5 /s |
Fixed | e755 |
Sun Jun 24 23:07:45 2018 |
Daisuke, Fairouz, Louis, Olivier, Valérie | RUN | General | Cryo-LH2 | RUN 109 |
Run 109 24 june start @ 22h54 stop@ 23h14
e748 Exxx 9723325 24 juin 23:14 /data/e748X/e755/acquisition/run/run_0109.dat.24-06-18_22h54m26s
Triggers Cats 1 and Cats2 DIV= 3.10**4
from I ~ 1.6 to 2. 10**5 /s by opening FH43 slits from 1.2 mm to 4mm
At the end of the run, we have:
Slits FH43 +/-4mm ; FV43 +/- 10mm ;
after putting FV43 at +/- 10 mm, we change the Wien filter from 4kV (initial value) to 6 kV, then to 2kV. |
Fixed | e755 |
Sun Jun 24 23:17:01 2018 |
Daisuke, Fairouz, Olivier, Valérie | RUN | General | Cryo-LH2 | RUN 110 |
Run 110 24 june start @ 23h15 stop @ 23h56
e748 Exxx 1339167483 24 juin 23:56 /data/e748X/e755/acquisition/run/run_0110.dat.24-06-18_23h14m53s
All Triggers: MUST2 and Cats 1 and Cats2 DIV= 3.10**4
I ~1.9 10**5 /s FH43 4mm
Slits FH43 +/-4mm ; FV43 +/- 10mm ;
Wien filter is 2kV.
--r--r-- 1 e748 Exxx 1339167483 24 juin 23:56 /data/e748X/e755/acquisition/run/run_0110.dat.24-06-18_23h14m53s |
Fixed | e755 |
Mon Jun 25 00:13:48 2018 |
Valérie +Lise team: Jean-Charles+Target: Takeshi | RUN | General | Cryo-LH2 | RUN 111 |
Run 111 25th June start @ 0h stop @1h13
e748 Exxx 3590054877 25 juin 01:14 /data/e748X/e755/acquisition/run/run_0111.dat.24-06-18_23h59m52s
--------------------------------------------------------------------------------
Triggers All Must2 Cats 1 and Cats2 DIV= 3.10**4
I ~2.0 10**5 /s FH43 +/- 5mm ; FV 43 +/- 4.1mm ; FH31 = +/-4mm
D33G D31 RMN = 8310.81 G
BRMN= 8311 G <--> Brho = 2.1614 T.m
Wien Filter +2 kV
-------------------------------------------------------------------------------------
Dead time between 15 and 27%
|
Fixed | e755 |
Mon Jun 25 01:17:47 2018 |
Valérie +Lise team: Jean-Charles+Target: Takeshi | RUN | General | Cryo-LH2 | RUN 112 |
Run 112 25th June start @ 1h14 stop @ 2h34
e748 Exxx 3769078581 25 juin 02:34 /data/e748X/e755/acquisition/run/run_0112.dat.25-06-18_01h14m03s
Target seems to be still ok and filled! see CATS plot on target
--------------------------------------------------------------------------------
Triggers All Must2 Cats 1 and Cats2 DIV= 3.10**4
I ~2.0 10**5 /s FH43 +/- 5mm ; FV 43 +/- 4.1mm ; FH31 = +/-4mm
D33G D31 RMN = 8310.81 G
BRMN= 8311 G <--> Brho = 2.1614 T.m
Wien Filter +2 kV
-------------------------------------------------------------------------------------
Dead time between 15 and 27%
Beam fluctuations, I down at 1.2 1°**5 at 1h35, then increasing at 2.4 10**5 at 1h40 and 3. 10**5 at 1h42 - see scalers at 1h41 and at1h43.
dead time around 25-30% at maximum.
We noticed that caviar was at 0 during the first part of run 112 (due to a cable removed on the LISE electronics).See scalers: Run112ScalersAt1h19.png
The cable was correctely connected again and now it is ok. See scalers Run112ScalersAt2h08.png
|
Fixed | e755 |
Mon Jun 25 02:34:30 2018 |
Valérie +Target: Takeshi | RUN | General | Cryo-LH2 | RUN 113 |
Run 113 25th June start @ 2h34 stop @ 3h57
e748 Exxx 3957925525 25 juin 03:57 /data/e748X/e755/acquisition/run/run_0113.dat.25-06-18_02h34m10s
--------------------------------------------------------------------------------
Triggers All Must2 Cats 1 and Cats2 DIV= 3.10**4
I ~2.0 10**5 /s FH43 +/- 5mm ; FV 43 +/- 4.1mm ; FH31 = +/-4mm
-------------------------------------------------------------------------------------
Dead time between 20 and 29%
Beam I~ 2.7 10**5 at 2h37 and 2.8 10**5 at 2h39- see scalers
dead time around 25-30% at maximum.
Beam Intensity at 3. 10**5 at 3h30 dead time up to 35%
------------------------------------------------------------------------------
|
Fixed | e755 |
Mon Jun 25 03:14:38 2018 |
e755- Valérie | MUST2 | Hardware | Cryo-LH2 | HV on MUST2, currents, CATS |
HV and currents on DSSDs and SiLi at 3h20
Telescopes T
T1 80V ; I ~ 4.9 µA
T2 80V ; I ~ 1.6 µA
T3 70V ; I ~ 0.7 µA
T4 60V ; I ~ 0.5 µA
T5 80V ; I ~ 7.6 µA
T6 80V ; I ~ 0.7 µA
T7 80V ; I ~ 1.2 µA
T8 80V ; I ~ 4 µA
SiLi 1/T7 300V tripped since 24th evening ; SiLi 2 /T7 750V; 1.5 µA
SiLi 1/T8 750V; ~ 26.4 µA ; SiLi 2 /T8 750V; ~ 1.8 µA
CATS1 580V ; 0.44 µA
CATS2 580V ; 0.54 µA |