Pinned, e744, Fri May 25 04:02:29 2018, Valerian Iulian Pedja and Cristina, OTHER, General, N/A, General power cut of ganil 
Due to some water leaks, CSS1 CSS2 and CIME as the vacuum system of GANIL are down... Time loss could be considerable... They talked about beam possibility in the morning but it seems unlikely.
Pinned, e744, Fri May 25 14:10:34 2018, Freddy, Louis, Lama, OFFLINE, General, , MM - dE_TOF diagnostic with/without CsI_E T2_diag_dETOF.pdfMM12345_diag_dETOF.pdf
Attached are some plot of dE-TOF PID for run 1004 after the threshold change ( 1 MeV --> 500 keV).

Putting a condition on CsI_E>0 select well punch through event as expected.
Pinned, e744, Tue May 29 09:30:42 2018, Freddy, Iulian, Pierre, RUN, General, CH2, Run 2110 - Target 4 CH2 Scaler_start_Run2110.pngimpact_Run2110.png
Run 2110

Beam: 14O (1.5*10^5 pps)

start: 9h27m29s
stop: 9h50m35s

Target nbr 4: CH2 (104 um)

Warning: Telescope 4 HV was at 40 V at the beginning of the run. The leakage current finally stabilized and decreased down to about 1.5 uA. We tried to increase the HV to the nominal voltage of 80 V but the leakage current suddenly raised to 10-15 uA again. We decide to let it to 60V for a while. In short Telescope 4 data can't be used for this run.
Pinned, e744, Tue May 29 09:54:01 2018, Freddy, Iulian, Pierre, RUN, General, CH2, Run 2111 - Target 4 CH2 8x
Run 2111

Beam: 14O (1.5*10^5 pps)

start: 9h51m
stop: 10h30

Target nbr 4: CH2 (104 um)

Remark: T4 HV at 60 V during all the run.
Run stopped because something tripped in CSS1.
Pinned, e755, Thu Jun 21 17:07:14 2018, Valerian, MUST2, General, N/A, run 3046 : Calimero T1-4Y Calimero_T14Y.png
run 3046 : Calimero T1-4Y
start @ 16h28
stop @ 16h53
Pinned, e755, Fri Jun 22 22:15:45 2018, daisuke, MECH, Hardware, N/A, Geometrical survey report E755_Listing_DSSD_X_Y_Z_repère_géomètre.xlsxSTP-2018-E071_D6_E755_Sorlin_Suzuki.pdfE755_Listing_DSSD_X_Y_Z.pdf
Pinned, e755, Tue Jun 26 14:36:55 2018, NPteam, OFFLINE, General, , 36Ca(p,t)36Ca analysis with zero degree gate kine_38Capt_zrodeg_gated.pdfkine_38Capt_zrodeg_gatedZ19.pdf
Here is an update of the analysis results for the 36Ca(p,t)36Ca channel.

Run concerned: 128 to 137
Gates: target, triton in dE vs E, Incoming 38Ca from TCATS_HF

First plot: outgoing Z=20 (from dE(IC) Vs E (PL))

Second Plot: outgoing Z=19
Pinned, e755, Tue Jun 26 18:43:35 2018, Valerian, DAQ, General, N/A, In case of a data acqusition crash  
If the acquisition crash :  

In the acquisition terminal : 

    Type TK 

    Type KNA 

    Type KALL 

    Press enter 

    Type q and y 

    Close the terminal 

Open a new terminal : 

    Type ssh -X e748@lpcgrit 

    Type start_acq e755 

    Type RC 

Once the run control is on : 

    Go back in the terminal  

    Type NA 

Then in the run control : 

    Click mode and select monitoring mode 

    Click Init 

You should be able to do start once everything is : READY
Pinned, e738, Wed Jul 4 17:10:28 2018, daisuke, DAQ, Software, N/A, Second VXI for CATS and syncrhonisation diagnosis 8x
Second VXI crate was addedd for CATS. If the synchronisation is not working, there will be error messages in the display of the chassis in trouble (Desktop IOLAN).

The width of FAG is set 100 ns by default setting for both GMTMASTER and GMTSLAVE. A longer width of FAG of GMT slave (like a few micro sec) will result in failure, as the GMT master cannot wait for a signal from the slave no more than 6 micro second which is defined by the signal CT. Make sure the chronograms of GMT are the same as in the figures attached, in case of synchronisation failure.Also confirm the configuration of CENTRUM master (figure attached).
Pinned, e738, Thu Jul 5 18:33:54 2018, gilles,fred,J-C,daisuke, DAQ, Hardware, N/A, Caviar DAQ merged. rc_2018-07-05_18h32m56s.pngdas_2018-07-05_18h32m46s.pngdas_2018-07-05_18h32m18s.pngscaler_2018-07-05_18h32m06s.pngdesktop_2018-07-05_18h25m17s.png
The VME crate of CAVIAR was integraded to the DAQ controlled by the GMT master of MUST2.

One caution. The visual scaler will not refresh if the TGV module of CAVIAR is listed in the configuration files
/home/e748/ganacq_manip/e755/das-save/e755_echelles.sav
and
/home/e748/ganacq_manip/e755/das-save/echelle.sav


Every time DAS configurations are saved, these files will be rewritten and the TGV module will be added. In such as case, run the macro

/home/e748/ganacq_manip/e755/das-save/echelle_without_caviar/copy_echelles.sh

This will remove the TGV module from these configuration files and make the visual scaler refreshing.
Pinned, e738, Thu Jul 5 19:26:31 2018, daisuke, MUST2, Hardware, N/A, MUST2 BT/HT screenshot_2018-07-05_19h23m54s.pngscreenshot_2018-07-05_19h24m07s.pngscreenshot_2018-07-05_19h24m17s.pngscreenshot_2018-07-05_19h24m24s.png
Pinned, e738, Fri Jul 6 09:40:04 2018, daisuke, OTHER, General, N/A, kinematics plots pt_kinema_30deg_1050um.pdfpt_kinema_30deg_2250um.pdfpt_kinema_30deg_750um_7be.pdf
Pinned, e738, Sat Jul 7 08:26:27 2018, Nori, BEAM, General, N/A, Beam production procedure e738beamproduction.pdf
 
Pinned, e738, Sat Jul 7 08:29:53 2018, daisuke, OTHER, Social, N/A, Shift table 2018-05-08_lise_must2_crypta_schedule_-_Shift_(July_7_to_15).pdf
https://docs.google.com/spreadsheets/d/1jyfw2LT3RGfDY4bcN-9zepZoe2uE89b5CnF4tXzqzj8/edit#gid=716299251
Pinned, e738, Sun Jul 8 21:05:50 2018, daisuke, OTHER, General, N/A, Phase space simulation: 10C(p,t)8C and 9C(p,d)8C pt_sim_phase_plot_8c_t.pdfpt_sim_phase_plot_8c_d.pdf
Pinned, e738, Thu Jul 12 18:47:32 2018, Nori, BEAM, General, N/A, Summary of Brho2 values 
Beam Brho2 RMN (Tm) Brho2 L++ (Tm)
9C 1.6352 1.6343
10C 1.8345 1.8335
40Ca (high) 2.2448 2.2432
37Ca 1.9242 1.9228
38Ca 1.9860 1.9846
40Ca (low) 2.1672 (?) 2.1656 (?)

 

Pending, e744, Tue Apr 24 14:18:22 2018, Valerian Freddy and Adrien aka Cherry Mx Team, MUST2, Hardware, N/A, Current telescope-pcb layout 
Telescope 1 : PCB 5 (ref on pcb: 2274)
Telescope 2 : PCB 4
Telescope 3 : PCB 7
Telescope 4 : PCB 11 (ref on pcb: n°2834-9)

Telescope 5 : PCB 2 (ref on pcb: X2489-8) Backward angles
Telescope 6 : PCB 6 around 90d eg.
------------------------   ------------------------
                       /  \
                      /    \
        4            /      \            1
                    /        \
                   /          \ 
                  /            \
                 /              \
-----------------                -----------------
-----------------        x       -----------------
                 \     BEAM     /
                  \            /
                   \          /
        3           \        /         2
                     \      /
                      \    /
                       \  /
------------------------  ------------------------
Pending, , Sat Apr 28 21:12:55 2018, iulian, MUST2, General, 3-alpha, Run 182 end ; problem with cooling end_result_alpha_source_28_April.png
RUN 182 start @13h
Stoped @ 21H

3alpha run
Problem with cooling of M2 in M2C. Looks like the debit reduced in time: retour no longer as cold as entrance.

Removed the HVs but mantain cooling to test.
Pending, e744, Sun May 13 13:32:44 2018, iulian, ONLINE, Software, N/A, start_online ilegal instruction fault 
From time to time the start_online code gives an ilegal instruction error and crash... Once the ctrl-c pressed it shows:


"Error in <TFile::cd>: No such file /home/e748/analysis/nptool/Outputs/Simulation.root:/"
Pending, e744, Tue May 22 19:40:26 2018, Francois, BEAM, General, , Planning of the experiment Chekclist_E744_4.pdf