Valerian Iulian Pedja and Cristina | OTHER | General | N/A | General power cut of ganil | Due to some water leaks, CSS1 CSS2 and CIME
as the vacuum system of GANIL are down...
Time loss could be considerable... They talked |
|
Pinned | e744 |
Fri May 25 14:10:34 2018 |
Freddy, Louis, Lama | OFFLINE | General | | MM - dE_TOF diagnostic with/without CsI_E | Attached are some plot of dE-TOF PID for run
1004 after the threshold change ( 1 MeV -->
500 keV).
|
 |
Pinned | e744 |
Tue May 29 09:30:42 2018 |
Freddy, Iulian, Pierre | RUN | General | CH2 | Run 2110 - Target 4 CH2 | Run 2110
Beam: 14O (1.5*10^5 pps)
|
 |
Pinned | e744 |
Tue May 29 09:54:01 2018 |
Freddy, Iulian, Pierre | RUN | General | CH2 | Run 2111 - Target 4 CH2 | Run 2111
Beam: 14O (1.5*10^5 pps)
|
8x |
Pinned | e755 |
Thu Jun 21 17:07:14 2018 |
Valerian | MUST2 | General | N/A | run 3046 : Calimero T1-4Y | [U]run 3046 :[/U] Calimero T1-4Y
start @ 16h28
stop @ 16h53 |
|
Pinned | e755 |
Fri Jun 22 22:15:45 2018 |
daisuke | MECH | Hardware | N/A | Geometrical survey report | |
  |
Pinned | e755 |
Tue Jun 26 14:36:55 2018 |
NPteam | OFFLINE | General | | 36Ca(p,t)36Ca analysis with zero degree gate | Here is an update of the analysis results
for the 36Ca(p,t)36Ca channel.
|
 |
Pinned | e755 |
Tue Jun 26 18:43:35 2018 |
Valerian | DAQ | General | N/A | In case of a data acqusition crash | [CODE]If the acquisition crash :
In the acquisition terminal :
|
|
Pinned | e738 |
Wed Jul 4 17:10:28 2018 |
daisuke | DAQ | Software | N/A | Second VXI for CATS and syncrhonisation diagnosis | Second VXI crate was addedd for CATS. If the
synchronisation is not working, there will
be error messages in the display of the chassis |
8x |
Pinned | e738 |
Thu Jul 5 18:33:54 2018 |
gilles,fred,J-C,daisuke | DAQ | Hardware | N/A | Caviar DAQ merged. | The VME crate of CAVIAR was integraded to
the DAQ controlled by the GMT master of MUST2.
|
    |
Pinned | e738 |
Thu Jul 5 19:26:31 2018 |
daisuke | MUST2 | Hardware | N/A | MUST2 BT/HT | |
   |
Pinned | e738 |
Fri Jul 6 09:40:04 2018 |
daisuke | OTHER | General | N/A | kinematics plots | |
  |
Pinned | e738 |
Sat Jul 7 08:26:27 2018 |
Nori | BEAM | General | N/A | Beam production procedure | |
|
Pinned | e738 |
Sat Jul 7 08:29:53 2018 |
daisuke | OTHER | Social | N/A | Shift table | https://docs.google.com/spreadsheets/d/1jyfw2LT3RGfDY4bcN-9zepZoe2uE89b5CnF4tXzqzj8/edit#gid=716299251 |
|
Pinned | e738 |
Sun Jul 8 21:05:50 2018 |
daisuke | OTHER | General | N/A | Phase space simulation: 10C(p,t)8C and 9C(p,d)8C | |
 |
Pinned | e738 |
Thu Jul 12 18:47:32 2018 |
Nori | BEAM | General | N/A | Summary of Brho2 values |
Beam
Brho2 |
|
Pending | e744 |
Tue Apr 24 14:18:22 2018 |
Valerian Freddy and Adrien aka Cherry Mx Team | MUST2 | Hardware | N/A | Current telescope-pcb layout | Telescope 1 : PCB 5 (ref on pcb: 2274)
Telescope 2 : PCB 4
Telescope 3 : PCB 7
|
|
Pending | |
Sat Apr 28 21:12:55 2018 |
iulian | MUST2 | General | 3-alpha | Run 182 end ; problem with cooling | RUN 182 start @13h
Stoped @ 21H
|
|
Pending | e744 |
Sun May 13 13:32:44 2018 |
iulian | ONLINE | Software | N/A | start_online ilegal instruction fault | From time to time the start_online code gives
an ilegal instruction error and crash...
Once the ctrl-c pressed it shows:
|
|
Pending | e744 |
Tue May 22 19:40:26 2018 |
Francois | BEAM | General | | Planning of the experiment | |
|