Pinnede744 Fri May 25 04:02:29 2018 Valerian Iulian Pedja and CristinaOTHERGeneralN/AGeneral power cut of ganil
Due to some water leaks, CSS1 CSS2 and CIME as the vacuum system of GANIL are down... Time loss could be considerable... They talked about beam possibility in the morning but it seems unlikely.
Pinnede744 Fri May 25 14:10:34 2018 Freddy, Louis, LamaOFFLINEGeneral MM - dE_TOF diagnostic with/without CsI_E
Attached are some plot of dE-TOF PID for run 1004 after the threshold change ( 1 MeV --> 500 keV).

Putting a condition on CsI_E>0 select well punch through event as expected.
Attachment 1: T2_diag_dETOF.pdf
T2_diag_dETOF.pdf
Attachment 2: MM12345_diag_dETOF.pdf
MM12345_diag_dETOF.pdf
Pinnede744 Tue May 29 09:30:42 2018 Freddy, Iulian, PierreRUNGeneralCH2Run 2110 - Target 4 CH2
Run 2110

Beam: 14O (1.5*10^5 pps)

start: 9h27m29s
stop: 9h50m35s

Target nbr 4: CH2 (104 um)

Warning: Telescope 4 HV was at 40 V at the beginning of the run. The leakage current finally stabilized and decreased down to about 1.5 uA. We tried to increase the HV to the nominal voltage of 80 V but the leakage current suddenly raised to 10-15 uA again. We decide to let it to 60V for a while. In short Telescope 4 data can't be used for this run.
Attachment 1: Scaler_start_Run2110.png
Scaler_start_Run2110.png
Attachment 2: impact_Run2110.png
impact_Run2110.png
Pinnede744 Tue May 29 09:54:01 2018 Freddy, Iulian, PierreRUNGeneralCH2Run 2111 - Target 4 CH2
Run 2111

Beam: 14O (1.5*10^5 pps)

start: 9h51m
stop: 10h30

Target nbr 4: CH2 (104 um)

Remark: T4 HV at 60 V during all the run.
Run stopped because something tripped in CSS1.
Attachment 1: Scaler_start_Run2111.png
Scaler_start_Run2111.png
Attachment 2: impact_Run2111.png
impact_Run2111.png
Attachment 3: mm5_EandT_Run2111.png
mm5_EandT_Run2111.png
Attachment 4: ttac_Run2111.png
ttac_Run2111.png
Attachment 5: mm1_4_TX_Run2111.png
mm1_4_TX_Run2111.png
Attachment 6: mm1_4_XE_Run2111.png
mm1_4_XE_Run2111.png
Attachment 7: mm1_4_YE_Run2111.png
mm1_4_YE_Run2111.png
Attachment 8: impact_Run2111_end.png
impact_Run2111_end.png
Pinnede755 Thu Jun 21 17:07:14 2018 ValerianMUST2GeneralN/Arun 3046 : Calimero T1-4Y
run 3046 : Calimero T1-4Y
start @ 16h28
stop @ 16h53
Attachment 1: Calimero_T14Y.png
Calimero_T14Y.png
Pinnede755 Fri Jun 22 22:15:45 2018 daisukeMECHHardwareN/AGeometrical survey report
Attachment 1: E755_Listing_DSSD_X_Y_Z_repère_géomètre.xlsx
Attachment 2: STP-2018-E071_D6_E755_Sorlin_Suzuki.pdf
STP-2018-E071_D6_E755_Sorlin_Suzuki.pdf STP-2018-E071_D6_E755_Sorlin_Suzuki.pdf STP-2018-E071_D6_E755_Sorlin_Suzuki.pdf STP-2018-E071_D6_E755_Sorlin_Suzuki.pdf
Attachment 3: E755_Listing_DSSD_X_Y_Z.pdf
E755_Listing_DSSD_X_Y_Z.pdf
Pinnede755 Tue Jun 26 14:36:55 2018 NPteamOFFLINEGeneral 36Ca(p,t)36Ca analysis with zero degree gate
Here is an update of the analysis results for the 36Ca(p,t)36Ca channel.

Run concerned: 128 to 137
Gates: target, triton in dE vs E, Incoming 38Ca from TCATS_HF

First plot: outgoing Z=20 (from dE(IC) Vs E (PL))

Second Plot: outgoing Z=19
Attachment 1: kine_38Capt_zrodeg_gated.pdf
kine_38Capt_zrodeg_gated.pdf
Attachment 2: kine_38Capt_zrodeg_gatedZ19.pdf
kine_38Capt_zrodeg_gatedZ19.pdf
Pinnede755 Tue Jun 26 18:43:35 2018 ValerianDAQGeneralN/AIn case of a data acqusition crash
If the acquisition crash :  

In the acquisition terminal : 

    Type TK 

    Type KNA 

    Type KALL 

    Press enter 

    Type q and y 

    Close the terminal 

Open a new terminal : 

    Type ssh -X e748@lpcgrit 

    Type start_acq e755 

    Type RC 

Once the run control is on : 

    Go back in the terminal  

    Type NA 

Then in the run control : 

    Click mode and select monitoring mode 

    Click Init 

You should be able to do start once everything is : READY
Pinnede738 Wed Jul 4 17:10:28 2018 daisukeDAQSoftwareN/ASecond VXI for CATS and syncrhonisation diagnosis
Second VXI crate was addedd for CATS. If the synchronisation is not working, there will be error messages in the display of the chassis in trouble (Desktop IOLAN).

The width of FAG is set 100 ns by default setting for both GMTMASTER and GMTSLAVE. A longer width of FAG of GMT slave (like a few micro sec) will result in failure, as the GMT master cannot wait for a signal from the slave no more than 6 micro second which is defined by the signal CT. Make sure the chronograms of GMT are the same as in the figures attached, in case of synchronisation failure.Also confirm the configuration of CENTRUM master (figure attached).
Attachment 1: desktop_2018-07-04_17h00m39s.png
desktop_2018-07-04_17h00m39s.png
Attachment 2: screenshot_2018-07-04_17h03m45s.png
screenshot_2018-07-04_17h03m45s.png
Attachment 3: screenshot_2018-07-04_17h03m49s.png
screenshot_2018-07-04_17h03m49s.png
Attachment 4: screenshot_2018-07-04_17h03m52s.png
screenshot_2018-07-04_17h03m52s.png
Attachment 5: screenshot_2018-07-04_17h03m57s.png
screenshot_2018-07-04_17h03m57s.png
Attachment 6: 2018-07-04_chrono_gmtmaster.png
2018-07-04_chrono_gmtmaster.png
Attachment 7: 2018-07-04_chrono_gmtslave.png
2018-07-04_chrono_gmtslave.png
Attachment 8: das_2018-07-04_17h08m46s.png
das_2018-07-04_17h08m46s.png
Pinnede738 Thu Jul 5 18:33:54 2018 gilles,fred,J-C,daisukeDAQHardwareN/ACaviar DAQ merged.
The VME crate of CAVIAR was integraded to the DAQ controlled by the GMT master of MUST2.

One caution. The visual scaler will not refresh if the TGV module of CAVIAR is listed in the configuration files
/home/e748/ganacq_manip/e755/das-save/e755_echelles.sav
and
/home/e748/ganacq_manip/e755/das-save/echelle.sav


Every time DAS configurations are saved, these files will be rewritten and the TGV module will be added. In such as case, run the macro

/home/e748/ganacq_manip/e755/das-save/echelle_without_caviar/copy_echelles.sh

This will remove the TGV module from these configuration files and make the visual scaler refreshing.
Attachment 1: rc_2018-07-05_18h32m56s.png
rc_2018-07-05_18h32m56s.png
Attachment 2: das_2018-07-05_18h32m46s.png
das_2018-07-05_18h32m46s.png
Attachment 3: das_2018-07-05_18h32m18s.png
das_2018-07-05_18h32m18s.png
Attachment 4: scaler_2018-07-05_18h32m06s.png
scaler_2018-07-05_18h32m06s.png
Attachment 5: desktop_2018-07-05_18h25m17s.png
desktop_2018-07-05_18h25m17s.png
Pinnede738 Thu Jul 5 19:26:31 2018 daisukeMUST2HardwareN/AMUST2 BT/HT
Attachment 1: screenshot_2018-07-05_19h23m54s.png
screenshot_2018-07-05_19h23m54s.png
Attachment 2: screenshot_2018-07-05_19h24m07s.png
screenshot_2018-07-05_19h24m07s.png
Attachment 3: screenshot_2018-07-05_19h24m17s.png
screenshot_2018-07-05_19h24m17s.png
Attachment 4: screenshot_2018-07-05_19h24m24s.png
screenshot_2018-07-05_19h24m24s.png
Pinnede738 Fri Jul 6 09:40:04 2018 daisukeOTHERGeneralN/Akinematics plots
Attachment 1: pt_kinema_30deg_1050um.pdf
pt_kinema_30deg_1050um.pdf pt_kinema_30deg_1050um.pdf pt_kinema_30deg_1050um.pdf pt_kinema_30deg_1050um.pdf
Attachment 2: pt_kinema_30deg_2250um.pdf
pt_kinema_30deg_2250um.pdf pt_kinema_30deg_2250um.pdf pt_kinema_30deg_2250um.pdf pt_kinema_30deg_2250um.pdf
Attachment 3: pt_kinema_30deg_750um_7be.pdf
pt_kinema_30deg_750um_7be.pdf pt_kinema_30deg_750um_7be.pdf pt_kinema_30deg_750um_7be.pdf pt_kinema_30deg_750um_7be.pdf
Pinnede738 Sat Jul 7 08:26:27 2018 NoriBEAMGeneralN/ABeam production procedure
Attachment 1: e738beamproduction.pdf
e738beamproduction.pdf e738beamproduction.pdf e738beamproduction.pdf e738beamproduction.pdf e738beamproduction.pdf e738beamproduction.pdf e738beamproduction.pdf e738beamproduction.pdf
Pinnede738 Sat Jul 7 08:29:53 2018 daisukeOTHERSocialN/AShift table
https://docs.google.com/spreadsheets/d/1jyfw2LT3RGfDY4bcN-9zepZoe2uE89b5CnF4tXzqzj8/edit#gid=716299251
Attachment 1: 2018-05-08_lise_must2_crypta_schedule_-_Shift_(July_7_to_15).pdf
2018-05-08_lise_must2_crypta_schedule_-_Shift_(July_7_to_15).pdf 2018-05-08_lise_must2_crypta_schedule_-_Shift_(July_7_to_15).pdf 2018-05-08_lise_must2_crypta_schedule_-_Shift_(July_7_to_15).pdf 2018-05-08_lise_must2_crypta_schedule_-_Shift_(July_7_to_15).pdf
Pinnede738 Sun Jul 8 21:05:50 2018 daisukeOTHERGeneralN/APhase space simulation: 10C(p,t)8C and 9C(p,d)8C
Attachment 1: pt_sim_phase_plot_8c_t.pdf
pt_sim_phase_plot_8c_t.pdf pt_sim_phase_plot_8c_t.pdf
Attachment 2: pt_sim_phase_plot_8c_d.pdf
pt_sim_phase_plot_8c_d.pdf pt_sim_phase_plot_8c_d.pdf
Pinnede738 Thu Jul 12 18:47:32 2018 NoriBEAMGeneralN/ASummary of Brho2 values
Beam Brho2 RMN (Tm) Brho2 L++ (Tm)
9C 1.6352 1.6343
10C 1.8345 1.8335
40Ca (high) 2.2448 2.2432
37Ca 1.9242 1.9228
38Ca 1.9860 1.9846
40Ca (low) 2.1672 (?) 2.1656 (?)

 

Pendinge744 Tue Apr 24 14:18:22 2018 Valerian Freddy and Adrien aka Cherry Mx TeamMUST2HardwareN/ACurrent telescope-pcb layout
Telescope 1 : PCB 5 (ref on pcb: 2274)
Telescope 2 : PCB 4
Telescope 3 : PCB 7
Telescope 4 : PCB 11 (ref on pcb: n°2834-9)

Telescope 5 : PCB 2 (ref on pcb: X2489-8) Backward angles
Telescope 6 : PCB 6 around 90d eg.
------------------------   ------------------------
                       /  \
                      /    \
        4            /      \            1
                    /        \
                   /          \ 
                  /            \
                 /              \
-----------------                -----------------
-----------------        x       -----------------
                 \     BEAM     /
                  \            /
                   \          /
        3           \        /         2
                     \      /
                      \    /
                       \  /
------------------------  ------------------------
Pending  Sat Apr 28 21:12:55 2018 iulianMUST2General3-alphaRun 182 end ; problem with cooling
RUN 182 start @13h
Stoped @ 21H

3alpha run
Problem with cooling of M2 in M2C. Looks like the debit reduced in time: retour no longer as cold as entrance.

Removed the HVs but mantain cooling to test.
Attachment 1: end_result_alpha_source_28_April.png
end_result_alpha_source_28_April.png
Pendinge744 Sun May 13 13:32:44 2018 iulianONLINESoftwareN/Astart_online ilegal instruction fault
From time to time the start_online code gives an ilegal instruction error and crash... Once the ctrl-c pressed it shows:


"Error in <TFile::cd>: No such file /home/e748/analysis/nptool/Outputs/Simulation.root:/"
Pendinge744 Tue May 22 19:40:26 2018 FrancoisBEAMGeneral Planning of the experiment
Attachment 1: Chekclist_E744_4.pdf
Chekclist_E744_4.pdf Chekclist_E744_4.pdf Chekclist_E744_4.pdf Chekclist_E744_4.pdf Chekclist_E744_4.pdf Chekclist_E744_4.pdf Chekclist_E744_4.pdf Chekclist_E744_4.pdf

ELOG Home Page