Pinned, e744, Fri May 25 04:02:29 2018, Valerian Iulian Pedja and Cristina, OTHER, General, N/A, General power cut of ganil 
Due to some water leaks, CSS1 CSS2 and CIME as the vacuum system of GANIL are down... Time loss could be considerable... They talked about beam possibility
in the morning but it seems unlikely.
Pinned, e744, Fri May 25 14:10:34 2018, Freddy, Louis, Lama, OFFLINE, General, , MM - dE_TOF diagnostic with/without CsI_E T2_diag_dETOF.pdfMM12345_diag_dETOF.pdf
Attached are some plot of dE-TOF PID for run 1004 after the threshold change ( 1 MeV --> 500 keV).

Putting a condition on CsI_E>0 select well punch through event as expected.
Pinned, e744, Tue May 29 09:30:42 2018, Freddy, Iulian, Pierre, RUN, General, CH2, Run 2110 - Target 4 CH2 Scaler_start_Run2110.pngimpact_Run2110.png
Run 2110

Beam: 14O (1.5*10^5 pps)
Pinned, e744, Tue May 29 09:54:01 2018, Freddy, Iulian, Pierre, RUN, General, CH2, Run 2111 - Target 4 CH2 8x
Run 2111

Beam: 14O (1.5*10^5 pps)
Pinned, e755, Thu Jun 21 17:07:14 2018, Valerian, MUST2, General, N/A, run 3046 : Calimero T1-4Y Calimero_T14Y.png
[U]run 3046 :[/U] Calimero T1-4Y
start @ 16h28
stop @ 16h53
Pinned, e755, Fri Jun 22 22:15:45 2018, daisuke, MECH, Hardware, N/A, Geometrical survey report E755_Listing_DSSD_X_Y_Z_repère_géomètre.xlsxSTP-2018-E071_D6_E755_Sorlin_Suzuki.pdfE755_Listing_DSSD_X_Y_Z.pdf
 
Pinned, e755, Tue Jun 26 14:36:55 2018, NPteam, OFFLINE, General, , 36Ca(p,t)36Ca analysis with zero degree gate kine_38Capt_zrodeg_gated.pdfkine_38Capt_zrodeg_gatedZ19.pdf
Here is an update of the analysis results for the 36Ca(p,t)36Ca channel.

Run concerned: 128 to 137
Pinned, e755, Tue Jun 26 18:43:35 2018, Valerian, DAQ, General, N/A, In case of a data acqusition crash  
[CODE]If the acquisition crash :  

In the acquisition terminal : 
Pinned, e738, Wed Jul 4 17:10:28 2018, daisuke, DAQ, Software, N/A, Second VXI for CATS and syncrhonisation diagnosis 8x
Second VXI crate was addedd for CATS. If the synchronisation is not working, there will be error messages in the display of the chassis in trouble (Desktop
IOLAN).
Pinned, e738, Thu Jul 5 18:33:54 2018, gilles,fred,J-C,daisuke, DAQ, Hardware, N/A, Caviar DAQ merged. rc_2018-07-05_18h32m56s.pngdas_2018-07-05_18h32m46s.pngdas_2018-07-05_18h32m18s.pngscaler_2018-07-05_18h32m06s.pngdesktop_2018-07-05_18h25m17s.png
The VME crate of CAVIAR was integraded to the DAQ controlled by the GMT master of MUST2. 

One caution. The visual scaler will not refresh if the TGV module of CAVIAR is listed in the configuration files
Pinned, e738, Thu Jul 5 19:26:31 2018, daisuke, MUST2, Hardware, N/A, MUST2 BT/HT screenshot_2018-07-05_19h23m54s.pngscreenshot_2018-07-05_19h24m07s.pngscreenshot_2018-07-05_19h24m17s.pngscreenshot_2018-07-05_19h24m24s.png
 
Pinned, e738, Fri Jul 6 09:40:04 2018, daisuke, OTHER, General, N/A, kinematics plots pt_kinema_30deg_1050um.pdfpt_kinema_30deg_2250um.pdfpt_kinema_30deg_750um_7be.pdf
 
Pinned, e738, Sat Jul 7 08:26:27 2018, Nori, BEAM, General, N/A, Beam production procedure e738beamproduction.pdf
 
Pinned, e738, Sat Jul 7 08:29:53 2018, daisuke, OTHER, Social, N/A, Shift table 2018-05-08_lise_must2_crypta_schedule_-_Shift_(July_7_to_15).pdf
https://docs.google.com/spreadsheets/d/1jyfw2LT3RGfDY4bcN-9zepZoe2uE89b5CnF4tXzqzj8/edit#gid=716299251
Pinned, e738, Sun Jul 8 21:05:50 2018, daisuke, OTHER, General, N/A, Phase space simulation: 10C(p,t)8C and 9C(p,d)8C pt_sim_phase_plot_8c_t.pdfpt_sim_phase_plot_8c_d.pdf
 
Pinned, e738, Thu Jul 12 18:47:32 2018, Nori, BEAM, General, N/A, Summary of Brho2 values 



Beam
Brho2 RMN (Tm)
Brho2 L++ (Tm)




9C
1.6352
1.6343


10C
1.8345
1.8335


40Ca
(high)
2.2448
2.2432


37Ca
1.9242
1.9228


38Ca
1.9860
1.9846


40Ca
Pending, e744, Tue Apr 24 14:18:22 2018, Valerian Freddy and Adrien aka Cherry Mx Team, MUST2, Hardware, N/A, Current telescope-pcb layout 
Telescope 1 : PCB 5 (ref on pcb: 2274)
Telescope 2 : PCB 4
Telescope 3 : PCB 7
Pending, , Sat Apr 28 21:12:55 2018, iulian, MUST2, General, 3-alpha, Run 182 end ; problem with cooling end_result_alpha_source_28_April.png
RUN 182 start @13h
Stoped @ 21H
Pending, e744, Sun May 13 13:32:44 2018, iulian, ONLINE, Software, N/A, start_online ilegal instruction fault 
From time to time the start_online code gives an ilegal instruction error and crash... Once the ctrl-c pressed it shows:

Pending, e744, Tue May 22 19:40:26 2018, Francois, BEAM, General, , Planning of the experiment Chekclist_E744_4.pdf
 