Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Fixed | e744 |
Sun May 27 20:47:02 2018 |
e744- Valérie | DAQ | Hardware | N/A | Info to reboot the crates in case of problem |
In case of problems in the run control, if it is not possible to reinstall the crates in the "Ready" mode status,
it is possible to reboot them remotely via the software commands.
this can be done using the iolan windows.
first, open a Terminal, then write:
iolan must2 all
Two windows are opened, for each of the VXI crates. see snapshot IOLANmust2reboot.png
then it is possible to reboot the crates by writing in each of the gansterm terminals the "reboot" command.
(Note that a password is asked, it corresponds to the first letter of all the words between (La cigale ...l'été) in the famous sentence of La Fontaine's fable "La Cigale et la Fourmi" ("The Grasshopper and the Ant").
Then after the operation the run Control Narval should be ready (see snapshot).
If not, it means that we need to enter in the D6 room to reboot the crates directly by pushing the "SYS RES" button (using the tiny yellow screw) on the two crates:
start with the Master crate (ganlx1, the one with the main GMT and MUVI1), then press the button of the second crate (ganlx14, with the GMTslave and the second MUVI).
The click-click on each crate means that the reset is done.
(NB: Simultaneously, the two gansterm terminals show the lines of the on-going reboot operations).
|
Attachment 1: IOLANmust2reboot.png
|
|
Attachment 2: RunControlE744Ready.png
|
|
Fixed | e744 |
Mon May 28 11:00:07 2018 |
Valerian and Iulian and Phil | RUN | General | | two protons |
|
Attachment 1: e2p_15O.pdf
|
|
Fixed | e744 |
Mon May 28 12:22:42 2018 |
Francois & Marlete | OFFLINE | General | | superposition exp / theory for 15O and 15F |
|
Attachment 1: sum.jpg
|
|
Attachment 2: 15F_final.jpg
|
|
Fixed | e744 |
Mon May 28 16:32:38 2018 |
E744- Valérie | DAQ | General | N/A | DAS configuration files-References |
|
Attachment 1: ConfigGMTexp744Mon28th.png
|
|
Attachment 2: ConfigMUVICastelStandardA.png
|
|
Attachment 3: ConfigMUVICastelStandardB.png
|
|
Attachment 4: MM5_thresholdAt992keV.png
|
|
Attachment 5: MM1_thresholdAt1MeV.png
|
|
Attachment 6: ConfigE744actionGanlx14b.png
|
|
Attachment 7: ConfigE744actionGanlx1b.png
|
|
Attachment 8: ConfigE744InterfaceU3M.png
|
|
Attachment 9: ConfigE744paramU2M.png
|
|
Attachment 10: ConfigE774CentrumMaster.png
|
|
Attachment 11: ConfigMUVICastelMufeeYStd.png
|
|
Attachment 12: ConfigMUVICastelMufeeXE744.png
|
|
Attachment 13: ConfigE744Muvi1B.png
|
|
Attachment 14: ConfigE744Muvi1A.png
|
|
Attachment 15: MM1MufeeYtemp5deg.png
|
|
Fixed | e744 |
Mon May 28 18:27:45 2018 |
E744- Valérie | DAQ | General | N/A | High Voltages and intensities on MUST2 |
Check regularly the HT on the MUST2.
NB: without beam the current on Telescope 4 is high, between 9 and 11 µA. see snapshot.
NB: The Ioset was increased at 20 µA on Friday 25th (cf Id entry=490) to avoid trips on this telescope due to strong intensity fluctuations due to the beam. |
Attachment 1: HT_MUST2withoutBeam28may18.png
|
|
Fixed | e744 |
Mon May 28 20:33:39 2018 |
E744- evening shift LISE+e744 teams (edit Iulan, Valérie) | RUN | General | CH2 | BEAM AGAIN RUN 2100 Tuning |
See plot of the Must2 impacts, Wien filter set at +/-0.8kV
Beam on CATS 1.2 10**5 pps
CH2 183 µm
Div as before |
Attachment 1: beam_spot_2100_end.png
|
|
Fixed | e744 |
Mon May 28 20:38:21 2018 |
E744- evening shift LISE+MUST2 teams (edit Valérie) | RUN | General | CH2 | RUN 2101 DATA target 4 |
run #2101
start @20h27
stop @22h20
target 4
Evening shift team:
LISE and E744 François, Iulan, Valérian, Louis, Jean-Charles, Marlete A., Pierre D., Simon G., Valérie L.
E744
Beam on CATS 1.2 10**5 pps
CH2 183 µm // ERROR ?? this should be 100um
Div as before
All Triggers in GMT (without LISE) |
Attachment 1: ScalersDuringRun2101.png
|
|
Attachment 2: HV_EXL_28May18.png
|
|
Attachment 3: TACduringRun2101.png
|
|
Attachment 4: TMM5stripsXYETrun2101.png
|
|
Attachment 5: MM1toMM4strYE_run2101.png
|
|
Attachment 6: MM1toMM4strXT_run2101.png
|
|
Attachment 7: MM1toMM4strYT_run2101.png
|
|
Attachment 8: MM1toMM4impactsMM5_Run2101.png
|
|
Attachment 9: TACcoincMMppt_Run2101.png
|
|
Attachment 10: HV_MUST2duringRun2101.png
|
|
Attachment 11: EXLCsiPads_Run2101.png
|
|
Attachment 12: Scaler_end_Run2101.png
|
|
Fixed | e744 |
Mon May 28 22:11:52 2018 |
e748- Louis | EXL-PPT | Hardware | CH2 | EXL4 trigger excess |
During run 2101, Frequency of the EXL4 channel at 478Hz compared to values around 30Hz for other channels |
Attachment 1: Scaler_EXLTriggerExeed_Run2101.png
|
|
Fixed | e744 |
Mon May 28 22:27:14 2018 |
Simon et Louis | RUN | General | CH2 | RUN 2102 DATA target 4 |
run #2102
start @22h20
stop @23h30
target 4
Evening shift team:
LISE and E744 François, Iulan, Valérian, Louis, Jean-Charles, Marlete A., Pierre D., Simon G., Valérie L.
E744
Beam on CATS 1.3 10**5 pps
CH2 183 µm // ERROR THIS SHOULD BE 100um
Div as before
All Triggers in GMT (without LISE) |
Attachment 1: Scaler_start_Run2102.png
|
|
Attachment 2: Scaler_stop_Run2102.png
|
|
Fixed | e744 |
Mon May 28 23:52:19 2018 |
Simon and Louis (start), Franck (stop) | RUN | General | Carbon | RUN 2103 DATA target 1 Carbon |
run #2103
start @23h49
stop @1h51
target 1 Carbon
Evening shift team:
LISE and E744 François, Iulan, Valérian, Louis, Jean-Charles, Marlete A., Pierre D., Simon G., Valérie L.
E744
Beam on CATS 1.3 10**5 pps
Carbon 75um
Div as before
All Triggers in GMT (without LISE) |
Attachment 1: Scaler_start_Run2103.png
|
|
Attachment 2: Scaler_stop_Run2103.png
|
|
Fixed | e744 |
Tue May 29 01:08:22 2018 |
e748 | BEAM | General | Carbon | Beam intensity |
At 0:46 primary beam intensity reaches 5 uA -> 1.5e5 pps on CATS. |
Fixed | e744 |
Tue May 29 02:01:58 2018 |
Franck, Valerian, Phil | RUN | General | Carbon | Run 2104 - Target 1 Carbon |
Run 2104
Beam: 14O
Start @ 2:00 29 May 2018
Stop @ 4:01 29 May 2018
Target 1 Carbon
Franck, Phil, Valerian
Beam rate (CATS): 1.4e5 pps |
Attachment 1: Scaler_start_Run2104.png
|
|
Attachment 2: Scaler_stop_Run2104.png
|
|
Fixed | e744 |
Tue May 29 02:38:21 2018 |
Franck, Valerian, Phil | ONLINE | General | Carbon | Spectra and HV Start Run 2104 |
|
Attachment 1: GATCONF_stop_run2103.png
|
|
Attachment 2: MM5_E_T_start_run2104.png
|
|
Attachment 3: MM14_EX_start_run2104.png
|
|
Attachment 4: MM14_EY_start_run2104.png
|
|
Attachment 5: MM14_TX_start_run2104.png
|
|
Attachment 6: MM14_TY_start_run2104.png
|
|
Attachment 7: MM_Impact_start_run2104.png
|
|
Attachment 8: TAC_start_run2104.png
|
|
Attachment 9: EXL17_start_run2104.png
|
|
Attachment 10: EXL_start_run2104.png
|
|
Attachment 11: hv_run2104.png
|
|
Fixed | e744 |
Tue May 29 04:08:52 2018 |
Franck, Valerian, Phil | RUN | General | Carbon | Run 2105 - Target 1 Carbon |
Run 2105
Beam 14O
Start 4:06 29 May 2018
Stop 6:06 29 May 2018
Target 1 Carbon
Franck, Valerian, Phil |
Attachment 1: Scaler_start_Run2105.png
|
|
Attachment 2: Scaler_stop_Run2105.png
|
|
Fixed | e744 |
Tue May 29 10:42:00 2018 |
Francois | BEAM | General | | effective beam time |
In total, there were:
1.4 UT of 14O, average 2x10^5 pps
0.7 UT of 14N, calibration
0.7 UT of background subtraction (carbon)
+ plot of the beam current during the last day. |
Attachment 1: os1.jpeg
|
|
Fixed | e744 |
Tue May 29 12:06:05 2018 |
iulian maurycy | OFFLINE | General | CH2 | Carbon substraction |
The scale factor for Carbon subtraction is 1.224. This means: RealCountsHidrogen=Counts CH2 - 1.224 * CountsCarbon
runs considered for the CH2 target
/home/e748/analysis/nptool/Projects/e744/conversion/rootdir/run_2013_0.root
/home/e748/analysis/nptool/Projects/e744/conversion/rootdir/run_2014_0.root
/home/e748/analysis/nptool/Projects/e744/conversion/rootdir/run_2015_0.root
/home/e748/analysis/nptool/Projects/e744/conversion/rootdir/run_2016_0.root
/home/e748/analysis/nptool/Projects/e744/conversion/rootdir/run_2017_0.root
/home/e748/analysis/nptool/Projects/e744/conversion/rootdir/run_2018_0.root
after the long interruption
/home/e748/analysis/nptool/Projects/e744/conversion/rootdir/run_2101_0.root
/home/e748/analysis/nptool/Projects/e744/conversion/rootdir/run_2102_0.root
run 2100 was not considered
runs considered for the Carbon subtraction:
after the long interruption
/home/e748/analysis/nptool/Projects/e744/conversion/rootdir/run_2103_0.root
/home/e748/analysis/nptool/Projects/e744/conversion/rootdir/run_2104_0.root
/home/e748/analysis/nptool/Projects/e744/conversion/rootdir/run_2105_0.root
the rest of runs was not considered |
Attachment 1: Carbon_runs_scale_factor.pdf
|
|
Fixed | e744 |
Tue May 29 17:14:41 2018 |
François, Freddy, Valérie | BEAM | General | | Beam back in D6 |
At 17pm Tuesday 29th we have beam coming back in D6. Run (without storage)
NB: The current on T4 (with Hv set 60V) is fluctuating between 4 and 6.5 µA. |
Attachment 1: HV_MUST2_29mayAt17h20.png
|
|
Attachment 2: HV_EXL_29mayAt17h21.png
|
|
Fixed | e744 |
Tue May 29 19:03:38 2018 |
Valérie (edit) | RUN | General | CH2 | Run #2112 BEAM BACK |
run #2112
Beam back given by the machine.
Beam+ Lise team: Omar K and Pierre Delahaye, Jean-Charles T.
Evening shift team : Valérian, François, Iulan, Valérie
start @ 20h00
stop @ 21h35
Beam intensity from 8. 10**4 pps to around 10**5 pps
target n°4. CH2 104 µm
All triggers, (no LISE)
Divisions CATS1 3. 10**4. PPT 3000 ; EXL 10**4
cf current of T4 to be checked regularly. At present with the beam the current is around 10.5 µA (fluctuates between 9 and 11 µA) for HV set at 60 V.
Beam rate is reduced at the end of the run, around 4000-5000 pps.
The machine operators are trying to recover the initial rate.
Next run (2113) will be started in the low rate conditions. |
Attachment 1: Scaler_start_Run2112.png
|
|
Attachment 2: HV_MUST2Run2112_May29Beam.png
|
|
Attachment 3: Run2112_TriggerConf.png
|
|
Attachment 4: Run2112_CorrelEXL17.png
|
|
Attachment 5: Run2112_RefTacTiming.png
|
|
Attachment 6: Run2112_CSIExl.png
|
|
Attachment 7: Run2112_MMStrXT.png
|
|
Attachment 8: Run2112_MMStrYT.png
|
|
Attachment 9: Run2112_MM1to4strxE.png
|
|
Attachment 10: Run2112_MM1to4strYE.png
|
|
Attachment 11: Run2112_MMEtof.png
|
|
Attachment 12: Run2112_MM5strxyET.png
|
|
Attachment 13: Run2112_MMImpacts.png
|
|
Attachment 14: Scalers_endofRun2112_.png
|
|
Fixed | e744 |
Tue May 29 21:41:55 2018 |
Valérie | RUN | General | CH2 | Run #2113 |
RUN #2113 start @ 21h37; stop 0h14 @
target n°4. CH2 104 µm
All triggers, (no LISE)
Divisions CATS1 3. 10**4. PPT 3000 ; EXL 10**4
Evening shift team: Valérian (offline); Valérie (Online).
with Olivier, Jean-Eric and Marlete.
Between 21h37 and 22h. Beam intensity from 4000 pps increasing around 7. 10**4 pps then down to 800 pps, fluctuating fastly.
Machine operators are trying to compensate the fluctuations.
cf current of T4 around 9.4 µA (fluctuates between 9 and 10 µA) for HV set at 60 V. Strong increase around 13 µA during a few minutes.
cf HV_MUST2run2113_29Mayat21h50.png
Between 23h10 and 23h20 the beam rate was evolving from 80-88k to 90-100 k and the current was fluctuating in T4 from 8.8 to 9.9 µA.
Beam rate is reduced at the beginning of the run, around 4000-5000 pps. See Scalers_Run2113initAt21h39.png
Then around 60k pps at 21h46; at 77k pps at 21h52, at 98k pps at 22h06 but very unstable and then down to 30kcps.
Around 110k pps at 22h35. cf ScalersRun2113_110kAt22h35.png
Stabilization around 88k and 100k pps between 22h50 and 23h05 (hoping we will have the beam rate around these values during the night)
------------------------------------------------------------------------------------------------------------------------------------------
CHECKING THE MISSING STRIPS X and Y IN THE TELESCOPES:
XE || MM1: X44 || MM2: X3, X4, X5, X6, X31 || MM3: all X OK || MM4: X8, X9, X45, X128 || MM5: XE all OK
YE || MM1: Y25, Y123, Y124 || MM2: Y100, Y128 || MM3: all Y OK || MM4: Y29, Y62, Y123, Y126 || MM5: Y15, Y39, Y98
------------------------------------------------------------------------------------------------------------------------------------------ |
Attachment 1: Scalers_Run2113initAt21h39.png
|
|
Attachment 2: HV_MUST2run2113_29Mayat21h50.png
|
|
Attachment 3: ScalersRun2113_110kAt22h35.png
|
|
Attachment 4: Run2113_MMimpacts.png
|
|
Attachment 5: Run2113_MMimpactsAt23h07.png
|
|
Attachment 6: Run2113_CsIExLCorrPpt_ETfag.png
|
|
Attachment 7: Run2113_TAC.png
|
|
Attachment 8: Run2113_refTimingFAG_PPT.png
|
|
Attachment 9: Run2113endRunScalers.png
|
|
Fixed | e744 |
Wed May 30 00:17:02 2018 |
Valérie, Louis | RUN | General | CH2 | Run #2114 |
RUN #2114 30 mai 2018 start @ 0h15; stop @ 2h58
BEAM STOP DUE to the shut down of the deviation element at the entrance of our D6 area.
target n°4. CH2 104 µm
All triggers, (no LISE)
Divisions CATS1 3. 10**4. PPT 3000 ; EXL 10**4
Evening shift team: Louis Valérie (Online)
Beam intensity around 10**5 pps decreasing to 80-70k pps around 1h30 then coming again to 95k pps at 1h40
Between 2h48 and 2h50 beam was decresaing down to few 1000/s on CATS, due to some alarms on the beam line, slowly increasing again after 2h52.
cf current of T4 around 13-14 µA Strong increase around 13 µA (due to the stabilization of the beam rate at 10**5 pps !)
------------------------------------------------------------------------------------------------------------------------------------------
NB: The E_TOF plots for MM1 and MM3 seem to count less than the MM2 and MM4 plots, nearly factor 10 below for MM1, and factor 5 below for MM3.
But the raw spectra for StrXT of MM1 and MM3 have quite the same statistics (see integral values) maybe some software problems.
Check how the TOF parameter is done in the offline (from XT or YT +thresholds and pattern conditions).
The same behaviour was seen in the previous runs. |
Attachment 1: Run2114_initScalers.png
|
|
Attachment 2: Run2114_MMimpactAT1h42.png
|
|
Attachment 3: Run2114_EXLCsIcorrelPPT_QTfag.png
|
|
Attachment 4: Run2114_TimingRefFAGppt.png
|
|
Attachment 5: Run2114_MMStrXT.png
|
|
Attachment 6: Run2114_MMStrYT.png
|
|
Attachment 7: Run2114_ETOFmm1toMM4.png
|
|
Attachment 8: Run2114_scalersEndRun.png
|
|