Fixed
Fri Jun 1 11:11:13 2018
e748
EXL-PPT
General
60Co
run #3002 ppt trigger
run #3002 ppt trigger
start 11h11
Fixed
e744
Fri Jun 1 12:06:47 2018
Valerian
EXL-PPT
General
60Co
run #3002 Calib PPT
run #3002
start @11h09
stop @12h04
Fixed
e744
Fri Jun 1 13:12:16 2018
Valérian
EXL-PPT
General
60Co
run #3003 Calib EXL
run #3003
start @12h06
stop @13h08
Fixed
e744
Fri Jun 1 19:19:20 2018
Valerian
MUST2
General
N/A
Calimero end
For the end of e744 the calimero runs are
the following ones :
Fixed
e744
Fri Jun 1 19:29:17 2018
Valérian
EXL-PPT
General
60Co
EXL efficiency
To test EXL efficiency I start a long run
with the source in front of it.
run 3014
Fixed
e744
Mon Jun 4 18:45:15 2018
shumpei
MUST2
Hardware
N/A
No data for two CsIs of MUST2
During E744 experiment, two CsI crystals (number
1 & 10) of MM2 had no data as attached.
When the M2C chamber was opened today, I
Fixed
e755
Thu Jun 7 09:46:47 2018
Louis
MUST2
Hardware
3-alpha
MUST2 test
The 8 MUST2 telescopes have been installed
and pluged in final configuration. Energy
signal have been tested with 2 3-alphas sources,
Fixed
e755
Thu Jun 7 12:19:18 2018
Louis
MUST2
Hardware
N/A
MUST2 configuration, X1Y1 and PCB numbers
Pictures showing the MUST2 configuration.
X and Y positions and PCB numbers are as
Fixed
e755
Thu Jun 7 13:54:59 2018
Louis
MUST2
Hardware
N/A
MUST2 Time
MUST2 time have been tested for T1 to T8 for
X and Y. FAG has been delayed with 150ns
and 500ns and sent as stop in MUVI 1 and
Fixed
e755
Thu Jun 7 17:12:38 2018
Louis
MUST2
Hardware
3-alpha
Calib Alpha
Run 3028: Calib 3 alpha started at 17h05
Run3029:Calib 3 alpha started at 17h54
Fixed
e755
Sun Jun 10 19:51:52 2018
Louis
MUST2
Hardware
3-alpha
Calibration run
Run3031:Calib 3 alpha started at 19h49
stoped at 9h15
Fixed
e755
Mon Jun 11 12:50:56 2018
Louis
MUST2
Hardware
3-alpha
Impact matrix
Impact matrix for Telescope 1 to 8 from the
run 3029 calibrated
8x
Fixed
e755
Mon Jun 11 13:28:21 2018
Louis
ONLINE
Hardware
3-alpha
Energy resolution MUST2
Energy resolution of the 8 MUST2 telescopes
from central pic of run 3029 calibrated with
3 alpha source.
Fixed
e755
Wed Jun 13 11:40:18 2018
Adrien Valérian Louis
MUST2
Hardware
3-alpha
RUN Source 4 Alpha
run 1: 4 alpha source, without heat shield,
1 bar air inside the target cell.
Fixed
e755
Wed Jun 13 18:20:02 2018
linda, Daisuke, Louis
MUST2
Hardware
3-alpha
Run test with heat shield
Run 9: heat shield added with two MYLAR foil
of 2um, vacuum has been made inside target
cell. 4 alpha source
Fixed
e755
Thu Jun 14 19:03:06 2018
shumpei
OFFLINE
Hardware
N/A
8MeV alpha source T5&T6
8MeV alpha source image on the target was
reconstructed from T5&T6 hit position and
target position information.
Ongoing
e755
Sun Jun 17 11:12:57 2018
takeshi
TARGET
Hardware
N/A
current cooling status of the cryogenic target
This is the temperature log of the cryogenic
hydrogen target during the cooling test done
last night.
Fixed
e755
Sun Jun 17 11:25:31 2018
takeshi
TARGET
Hardware
N/A
current cooling status of the cryogenic target
This is the temperature log (temperaturelog.png)
of the cryogenic hydrogen target during the
cooling test done last night.
Fixed
e755
Wed Jun 20 16:45:00 2018
Cherry Mx Team
TARGET
Hardware
3-alpha
Cryo target is filled
We dont see any alpha in detector 1-6m but
we see them in detector 7-8.
Fixed
e755
Thu Jun 21 07:16:51 2018
daisuke
RUN
General
3-alpha
RUN0039 three alpha source calibration MUST2
alpha source run over night.
Goto page
Previous
1
,
2
,
3
...
28
, 29,
30
...
46
,
47
,
48
Next
ELOG Home Page