MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 29 of 48  Not logged in MUST2
Fixed, e744, Mon Jun 4 18:45:15 2018, shumpei, MUST2, Hardware, N/A, No data for two CsIs of MUST2 csin.pdfcsip.pdf
During E744 experiment, two CsI crystals (number 1 & 10) of MM2 had no data as attached.
When the M2C chamber was opened today, I found at least connection for CsI number 1 of MM2 has a problem.
It takes some time to fix the connection for CsI, so it may be going to be fixed after some hardware problems are found in this week.
Fixed, e755, Thu Jun 7 09:46:47 2018, Louis, MUST2, Hardware, 3-alpha, MUST2 test MMYE1_4_3alpha_06062022.pngMMYE1_4_3alpha_06062021.pngMMYE1_4_3alpha_06062020.pngMMYE1_4_3alpha_06062019.png
The 8 MUST2 telescopes have been installed and pluged in final configuration. Energy signal have been tested with 2 3-alphas sources, one in front of T5-T6
and one in front of the others. 
Energy signal for all telescopes looks ok exept for telescopes 5. Concidering their position with respect to the source T5 and T6 should have the same
Fixed, e755, Thu Jun 7 12:19:18 2018, Louis, MUST2, Hardware, N/A, MUST2 configuration, X1Y1 and PCB numbers  Config_MUST2.jpgConfig_MUST2_T56.jpg
Pictures showing the MUST2 configuration. 
X and Y positions and PCB numbers are as folow are as follow: 
Fixed, e755, Thu Jun 7 13:54:59 2018, Louis, MUST2, Hardware, N/A, MUST2 Time MMXT1_4_07062018.pngMMYT1_4_07062018.pngMMYT5_8_07062018.pngMMXT5_8_07062018.png
MUST2 time have been tested for T1 to T8 for X and Y. FAG has been delayed with 150ns and 500ns and sent as stop in MUVI 1 and 2. One can see two pics in
all spectrum. All scales of TAC have been setted to 600ns.
Fixed, e755, Thu Jun 7 17:12:38 2018, Louis, MUST2, Hardware, 3-alpha, Calib Alpha MMYE1_4_08062020.pngMMYE5_8_08062020.pngMMXE1_4_08062019.pngMMXE5_8_08062019.png
Run 3028: Calib 3 alpha started at 17h05
Run3029:Calib 3 alpha started at 17h54
Fixed, e755, Sun Jun 10 19:51:52 2018, Louis, MUST2, Hardware, 3-alpha, Calibration run MMYE1_4_11062020.pngMMYE5_8_11062020.pngMMXE1_4_11062020.pngMMXE5_8_projection_11062020.png
Run3031:Calib 3 alpha started at 19h49
stoped at 9h15
Fixed, e755, Mon Jun 11 12:50:56 2018, Louis, MUST2, Hardware, 3-alpha, Impact matrix 8x
Impact matrix for Telescope 1 to 8 from the run 3029 calibrated
Fixed, e755, Mon Jun 11 13:28:21 2018, Louis, ONLINE, Hardware, 3-alpha, Energy resolution MUST2 
Energy resolution of the 8 MUST2 telescopes from central pic of run 3029 calibrated with 3 alpha source.

T1: mean = 5.389MeV  ,  sigma = 15.0keV
Fixed, e755, Wed Jun 13 11:40:18 2018, Adrien Valérian Louis, MUST2, Hardware, 3-alpha, RUN Source 4 Alpha EY_T1_4_13062020.pngEY_T5_8_13062020.pngEX_T1_4_13062020.pngEX_T5_8_13062020.png
run 1: 4 alpha source, without heat shield, 1 bar air inside the target cell.

Data has been taken with a 4 alpha source: 3 alpha around 5Mev plus one around 8.7MeV
Fixed, e755, Wed Jun 13 18:20:02 2018, linda, Daisuke, Louis, MUST2, Hardware, 3-alpha, Run test with heat shield EX_T5_8_14062021.pngEX_T1_4_14062021.pngEY_T1_4_14062021.pngEY_T5_8_14062021.png
Run 9: heat shield added with two MYLAR foil of 2um, vacuum has been made inside target cell. 4 alpha source
Fixed, e755, Thu Jun 14 19:03:06 2018, shumpei, OFFLINE, Hardware, N/A, 8MeV alpha source T5&T6 tqrget.pdf
8MeV alpha source image on the target was reconstructed from T5&T6 hit position and target position information.
The target is something like 2 cm diameter collimator.
Now the center of the image is a little bit close to T6(bottom) maybe because the center of the target is placed to bottom side at room temperature since
Ongoing, e755, Sun Jun 17 11:12:57 2018, takeshi, TARGET, Hardware, N/A, current cooling status of the cryogenic target 
This is the temperature log of the cryogenic hydrogen target during the cooling test done last night.
The temperature of the heat shield (green line) and the cell (blue line) increased while it went the minimum values at once.
Fixed, e755, Sun Jun 17 11:25:31 2018, takeshi, TARGET, Hardware, N/A, current cooling status of the cryogenic target temperaturelog.pngpeak.pngboilingpoint.png
This is the temperature log (temperaturelog.png) of the cryogenic hydrogen target during the cooling test done last night.
The temperature of the heat shield (green line) and the cell (blue line) increased while it went the minimum values at once.
In addition to the overall behaviour, a narrow peak was found (peak,png) in the cell temperature which anti-correlate to that of the heat shield. We consider
Fixed, e755, Wed Jun 20 16:45:00 2018, Cherry Mx Team, TARGET, Hardware, 3-alpha, Cryo target is filled targefilled.png
We dont see any alpha in detector 1-6m but we see them in detector 7-8.

Fixed, e755, Thu Jun 21 07:16:51 2018, daisuke, RUN, General, 3-alpha, RUN0039 three alpha source calibration MUST2 2018-06-21_run0039_01.png2018-06-21_run0039_02.png2018-06-21_run0039_03.png2018-06-21_run0039_04.png
alpha source run over night. 
Fixed, e755, Thu Jun 21 08:30:48 2018, shumpei, daisuke, RUN, General, 3-alpha, RUN0040 8 MeV source run with liquid hydrogen 2018-06-21_run0040_04.png2018-06-21_run0040_03.png2018-06-21_run0040_02.png2018-06-21_run0040_01.png
RUN 0040. started 7:23 am 
 
8 MeV source was set upstream at 0 degrees to confirm that the target is filled with liquid. The target has been cooled since 4 pm yesterday. From the
Fixed, e755, Thu Jun 21 09:16:01 2018, Kitamura, TARGET, Hardware, N/A, Vapor pressure isobutane.pngcf4.png
Vapor pressures of isobutane and CF4. The paramateres of the Antoine equation were taken from the following NIST
pages.
Fixed, e755, Thu Jun 21 16:08:32 2018, Valerian, MUST2, Hardware, N/A, Run 3045 : Calimero T1-4 X Calimero_T14X.png
[U][B]run 3045 :[/B][/U] 
start @ 15h35
stop  @ 15h59
Pinned, e755, Thu Jun 21 17:07:14 2018, Valerian, MUST2, General, N/A, run 3046 : Calimero T1-4Y Calimero_T14Y.png
[U]run 3046 :[/U] Calimero T1-4Y
start @ 16h28
stop @ 16h53
Fixed, e755, Thu Jun 21 18:52:42 2018, takeshi, TARGET, Hardware, N/A, target temperature entire.pngheatshield.pngcell.png
Here I attached the temperature graph which is daisuke discussed at the meeting.
Both the heat shield (blue line) and the cell (green) increase after the minimum at 8 hours.
They had a second minimum at 21 hours and now they are increasing.

ELOG Home Page