Fixed, e744, Tue May 29 21:41:55 2018, Valérie, RUN, General, CH2, Run #2113 9x
|
[B]RUN #2113 start @ 21h37; stop 0h14 @ [/B]
target n°4. CH2 104 µm
All triggers, (no LISE)
|
Fixed, e744, Wed May 30 00:17:02 2018, Valérie, Louis, RUN, General, CH2, Run #2114 8x
|
[B]RUN #2114 30 mai 2018 start @ 0h15; stop @ 2h58[/B]
BEAM STOP DUE to the shut down of the deviation element at the entrance of our D6 area.
target n°4. CH2 104 µm
|
Fixed, e744, Wed May 30 01:15:58 2018, Valérie, Louis, RUN, General, CH2, Run #2115 6x
|
[B]Since 2h58 : WAITING FOR THE BEAM TO START THE RUN[/B]
[B]RUN #2115 30 mai 2018 start @ 03h20; stop @ 4h56[/B]
|
Ongoing, e744, Wed May 30 01:30:34 2018, Valerian, OFFLINE, General, CH2, Checking the T4
|
After checking every telescope, it seems that the calibration of T4 is very off, I think that for now, it might be a good thing to consider this telescope
out of the analysis ? |
Ongoing, e744, Wed May 30 03:09:09 2018, Valérie, Louis, RUN, General, CH2, BEAM LINE PROBLEMS, alarm "water leakage"
|
The beam was stopped at 4h56, due to the alarm of "water leakage" on equipments, indicated in the D6 area.
All QPole in D6 were automatically put to 0.
Wien filter and DAP were put OFF to stop the beam and enter in the D6 area.
|
Fixed, e744, Wed May 30 07:06:58 2018, François, Louis, Valérie, RUN, General, CH2, Run 2116  
|
Wednesday 30th May.
Beam back at 6h59. Run 2116 started at 6h69. STOP at 8h33 (beam rate decreasing at the end of the run due to machine problems).
|
Fixed, e744, Wed May 30 08:34:51 2018, Valérie, RUN, General, CH2, Run 2117- low or no beam
|
Wednesday 30th May.
Run 2117 started at 8h36 ; Stop at 8h45: BEAM STOP.
Beam decreased at the end of Run 2116, still very low at the beginning of run 2117, 300 pps then 3 pps.
|
Ongoing, e744, Wed May 30 09:24:28 2018, Valérie, Adrien, Freddy, RUN, General, CH2, Run 2118    
|
Wednesday 30th May.
Run 2118 started at 9h23 ;
Stop at: 11h25
|
Ongoing, e744, Wed May 30 11:17:00 2018, Valerian maurycy and Olivier, OFFLINE, General, CH2, Condition on time T5
|
One should add the condition Si_TX < 150 for T5, problem from Ta? |
Ongoing, e744, Wed May 30 11:22:16 2018, Valerian maurycy and Olivier, OFFLINE, General, CH2, Checking the cuts
|
cut_DeE :
- T1 OK
|
Fixed, e744, Wed May 30 11:42:41 2018, Freddy, Adrien, RUN, General, CH2, Run 2119 - Target 4 CH2    
|
[U][B]Run 2119[/B][/U]
Start: 11h25m53s
|
Fixed, e744, Wed May 30 13:25:57 2018, Phil, Freddy, RUN, General, CH2, Run 2020 - target number 4 
|
Run 2020
Start: 13h24m
|
Ongoing, e744, Wed May 30 13:48:02 2018, Phil, DAQ, General, N/A, Pulser values
|
Here's a list of pulser values taken from the last few runs as a reference for what rate the "100-Hz" pulser is actually seeing.
All rates in Hz.
|
Pending, e744, Wed May 30 15:26:40 2018, Francois Marlete, BEAM, General, , problem with beam
|
14H00 : The primary beam was misaligned, they are still working on it. No 14O beam. |
Ongoing, e744, Thu May 31 16:42:30 2018, iulian, EXL-PPT, General, 60Co, Run 3000 60Co source PPT & EXL triggers   
|
Run 3000
60Co source
PPT & EXL triggers
|
Ongoing, e744, Thu May 31 17:45:21 2018, iulian, MUST2, General, 3-alpha, run #3001 alpha source T1-T5 
|
run #3001
alpha source T1-T5 |
Fixed, , Fri Jun 1 11:11:13 2018, e748, EXL-PPT, General, 60Co, run #3002 ppt trigger
|
run #3002 ppt trigger
start 11h11 |
Fixed, e744, Fri Jun 1 12:06:47 2018, Valerian, EXL-PPT, General, 60Co, run #3002 Calib PPT 
|
run #3002
start @11h09
stop @12h04 |
Fixed, e744, Fri Jun 1 13:12:16 2018, Valérian, EXL-PPT, General, 60Co, run #3003 Calib EXL 
|
run #3003
start @12h06
stop @13h08 |
Fixed, e744, Fri Jun 1 19:19:20 2018, Valerian, MUST2, General, N/A, Calimero end
|
For the end of e744 the calimero runs are the following ones :
run 3009 X T1-4
|
Fixed, e744, Fri Jun 1 19:29:17 2018, Valérian, EXL-PPT, General, 60Co, EXL efficiency
|
To test EXL efficiency I start a long run with the source in front of it.
run 3014
start @19h25
|
|