Ongoing | e744 |
Tue May 29 16:23:56 2018 |
Valerian Iulian Maurycy | OFFLINE | General | CH2 | Hint of a 2p peaks |
|
Attachment 1: Two_proton_14Ovs12C.pdf
|
|
Fixed | e744 |
Tue May 29 17:14:41 2018 |
François, Freddy, Valérie | BEAM | General | | Beam back in D6 |
At 17pm Tuesday 29th we have beam coming back in D6. Run (without storage)
NB: The current on T4 (with Hv set 60V) is fluctuating between 4 and 6.5 µA. |
Attachment 1: HV_MUST2_29mayAt17h20.png
|
|
Attachment 2: HV_EXL_29mayAt17h21.png
|
|
Ongoing | e744 |
Tue May 29 18:49:21 2018 |
Valerian | OFFLINE | General | CH2 | Comparison of gamma prompt spectrum for EXL and PPT |
Quick note, there is less data seen in EXL prompt. This should be investigated |
Attachment 1: prompt_energyEXL_12C_14O.pdf
|
|
Attachment 2: prompt_energyPPT_12C_14O.pdf
|
|
Fixed | e744 |
Tue May 29 19:03:38 2018 |
Valérie (edit) | RUN | General | CH2 | Run #2112 BEAM BACK |
run #2112
Beam back given by the machine.
Beam+ Lise team: Omar K and Pierre Delahaye, Jean-Charles T.
Evening shift team : Valérian, François, Iulan, Valérie
start @ 20h00
stop @ 21h35
Beam intensity from 8. 10**4 pps to around 10**5 pps
target n°4. CH2 104 µm
All triggers, (no LISE)
Divisions CATS1 3. 10**4. PPT 3000 ; EXL 10**4
cf current of T4 to be checked regularly. At present with the beam the current is around 10.5 µA (fluctuates between 9 and 11 µA) for HV set at 60 V.
Beam rate is reduced at the end of the run, around 4000-5000 pps.
The machine operators are trying to recover the initial rate.
Next run (2113) will be started in the low rate conditions. |
Attachment 1: Scaler_start_Run2112.png
|
|
Attachment 2: HV_MUST2Run2112_May29Beam.png
|
|
Attachment 3: Run2112_TriggerConf.png
|
|
Attachment 4: Run2112_CorrelEXL17.png
|
|
Attachment 5: Run2112_RefTacTiming.png
|
|
Attachment 6: Run2112_CSIExl.png
|
|
Attachment 7: Run2112_MMStrXT.png
|
|
Attachment 8: Run2112_MMStrYT.png
|
|
Attachment 9: Run2112_MM1to4strxE.png
|
|
Attachment 10: Run2112_MM1to4strYE.png
|
|
Attachment 11: Run2112_MMEtof.png
|
|
Attachment 12: Run2112_MM5strxyET.png
|
|
Attachment 13: Run2112_MMImpacts.png
|
|
Attachment 14: Scalers_endofRun2112_.png
|
|
Fixed | e744 |
Tue May 29 21:41:55 2018 |
Valérie | RUN | General | CH2 | Run #2113 |
RUN #2113 start @ 21h37; stop 0h14 @
target n°4. CH2 104 µm
All triggers, (no LISE)
Divisions CATS1 3. 10**4. PPT 3000 ; EXL 10**4
Evening shift team: Valérian (offline); Valérie (Online).
with Olivier, Jean-Eric and Marlete.
Between 21h37 and 22h. Beam intensity from 4000 pps increasing around 7. 10**4 pps then down to 800 pps, fluctuating fastly.
Machine operators are trying to compensate the fluctuations.
cf current of T4 around 9.4 µA (fluctuates between 9 and 10 µA) for HV set at 60 V. Strong increase around 13 µA during a few minutes.
cf HV_MUST2run2113_29Mayat21h50.png
Between 23h10 and 23h20 the beam rate was evolving from 80-88k to 90-100 k and the current was fluctuating in T4 from 8.8 to 9.9 µA.
Beam rate is reduced at the beginning of the run, around 4000-5000 pps. See Scalers_Run2113initAt21h39.png
Then around 60k pps at 21h46; at 77k pps at 21h52, at 98k pps at 22h06 but very unstable and then down to 30kcps.
Around 110k pps at 22h35. cf ScalersRun2113_110kAt22h35.png
Stabilization around 88k and 100k pps between 22h50 and 23h05 (hoping we will have the beam rate around these values during the night)
------------------------------------------------------------------------------------------------------------------------------------------
CHECKING THE MISSING STRIPS X and Y IN THE TELESCOPES:
XE || MM1: X44 || MM2: X3, X4, X5, X6, X31 || MM3: all X OK || MM4: X8, X9, X45, X128 || MM5: XE all OK
YE || MM1: Y25, Y123, Y124 || MM2: Y100, Y128 || MM3: all Y OK || MM4: Y29, Y62, Y123, Y126 || MM5: Y15, Y39, Y98
------------------------------------------------------------------------------------------------------------------------------------------ |
Attachment 1: Scalers_Run2113initAt21h39.png
|
|
Attachment 2: HV_MUST2run2113_29Mayat21h50.png
|
|
Attachment 3: ScalersRun2113_110kAt22h35.png
|
|
Attachment 4: Run2113_MMimpacts.png
|
|
Attachment 5: Run2113_MMimpactsAt23h07.png
|
|
Attachment 6: Run2113_CsIExLCorrPpt_ETfag.png
|
|
Attachment 7: Run2113_TAC.png
|
|
Attachment 8: Run2113_refTimingFAG_PPT.png
|
|
Attachment 9: Run2113endRunScalers.png
|
|
Fixed | e744 |
Wed May 30 00:17:02 2018 |
Valérie, Louis | RUN | General | CH2 | Run #2114 |
RUN #2114 30 mai 2018 start @ 0h15; stop @ 2h58
BEAM STOP DUE to the shut down of the deviation element at the entrance of our D6 area.
target n°4. CH2 104 µm
All triggers, (no LISE)
Divisions CATS1 3. 10**4. PPT 3000 ; EXL 10**4
Evening shift team: Louis Valérie (Online)
Beam intensity around 10**5 pps decreasing to 80-70k pps around 1h30 then coming again to 95k pps at 1h40
Between 2h48 and 2h50 beam was decresaing down to few 1000/s on CATS, due to some alarms on the beam line, slowly increasing again after 2h52.
cf current of T4 around 13-14 µA Strong increase around 13 µA (due to the stabilization of the beam rate at 10**5 pps !)
------------------------------------------------------------------------------------------------------------------------------------------
NB: The E_TOF plots for MM1 and MM3 seem to count less than the MM2 and MM4 plots, nearly factor 10 below for MM1, and factor 5 below for MM3.
But the raw spectra for StrXT of MM1 and MM3 have quite the same statistics (see integral values) maybe some software problems.
Check how the TOF parameter is done in the offline (from XT or YT +thresholds and pattern conditions).
The same behaviour was seen in the previous runs. |
Attachment 1: Run2114_initScalers.png
|
|
Attachment 2: Run2114_MMimpactAT1h42.png
|
|
Attachment 3: Run2114_EXLCsIcorrelPPT_QTfag.png
|
|
Attachment 4: Run2114_TimingRefFAGppt.png
|
|
Attachment 5: Run2114_MMStrXT.png
|
|
Attachment 6: Run2114_MMStrYT.png
|
|
Attachment 7: Run2114_ETOFmm1toMM4.png
|
|
Attachment 8: Run2114_scalersEndRun.png
|
|
Fixed | e744 |
Wed May 30 01:15:58 2018 |
Valérie, Louis | RUN | General | CH2 | Run #2115 |
Since 2h58 : WAITING FOR THE BEAM TO START THE RUN
RUN #2115 30 mai 2018 start @ 03h20; stop @ 4h56
END OF THE RUN because there is an alarm related to a potential water leakage in the D3-D6 equipments. see next entry.
PCP will make a survey and enter to check the Qpole all off. We put the Wien filter off.
target n°4. CH2 104 µm
All triggers, (no LISE)
Divisions CATS1 3. 10**4. PPT 3000 ; EXL 10**4
Night shift team: Louis, Valérie
Beam intensity recovered around 70k-90k pps at 3h37
Again down at 300 pps at 3h30 due to the loss of the "HyperPi" of the source (hummm we should ask experts about the meaning cf JCT)
cf current of T4 around 15 µA (at 3h15 without beam; same at 3h20 with beam), increasing during the run, 16 µA see Run2115_HVMust2At3h50.png
cf small rate at the beginning, cf Run2115_scalersInit.png
max around 91k pps at 3h27, cf Run2115_scalersAt3h27.png
------------------------------------------------------------------------------------------------------------------------------------------ |
Attachment 1: Run2115_scalersInit.png
|
|
Attachment 2: Run2115_scalersAt3h27.png
|
|
Attachment 3: Run2115_HVMust2At3h50.png
|
|
Attachment 4: Run2115_scalersEnd.png
|
|
Attachment 5: Run2115_MMimpact.png
|
|
Attachment 6: Run2115TriggerU2M.png
|
|
Ongoing | e744 |
Wed May 30 01:30:34 2018 |
Valerian | OFFLINE | General | CH2 | Checking the T4 |
After checking every telescope, it seems that the calibration of T4 is very off, I think that for now, it might be a good thing to consider this telescope out of the analysis ? |
Ongoing | e744 |
Wed May 30 03:09:09 2018 |
Valérie, Louis | RUN | General | CH2 | BEAM LINE PROBLEMS, alarm "water leakage" |
The beam was stopped at 4h56, due to the alarm of "water leakage" on equipments, indicated in the D6 area.
All QPole in D6 were automatically put to 0.
Wien filter and DAP were put OFF to stop the beam and enter in the D6 area.
Between 5h and 5h30 PCP investigated the problem along the D3 and D6 areas, to check the water leakage problem indicated by the control command messages.
Since the problem could not be solved directly on the command boxes in PCP, it was not possible to put again the values on the QPoles.
then the area astreinte, Sébastien Le Moal, was called at 5h40.
At 6h15, he investigated the problem and check the cables in the D6 area. He saw some water condensation around the cable surveyor of the equipment (located behind the cooling system of MUST2).
Night/morning shift team: Louis Valérie.
[NB: in order to let them end up their night quietly, we will call later on the LISE experts for the beam line checking once the Qpoles are ready to put ON again.]
The T4 was increasing, from 16µA at 5h, then around 17 µA at 5h40 (see snapshot HT_MUST2_Wed30May_At5h52.png) we decided to put it OFF to let it end the night quietly.
|
Attachment 1: HT_MUST2_Wed30May_At5h52.png
|
|
Fixed | e744 |
Wed May 30 07:06:58 2018 |
François, Louis, Valérie | RUN | General | CH2 | Run 2116 |
Wednesday 30th May.
Beam back at 6h59. Run 2116 started at 6h69. STOP at 8h33 (beam rate decreasing at the end of the run due to machine problems).
Around 6-6h40 Leakage alarm problem was solved by Sébastien Le Moal (see last entry) and Qpoles were set again.
Wien filter +/-0.8 kV.
target n°4. CH2 104 µm
All triggers, (no LISE)
Divisions CATS1 3. 10**4. PPT 3000 ; EXL 10**4
Night morning shift team: Louis, Valérie; François arriving at 7h just on time to apply the values of the Qpoles in D6 and to check the beam profile on PR62Gaz.
See LISE notebook for the printed beam profile. The plot of MM impacts looks good.
Beam intensity around 100k pps at 7h15.
cf current of T4 around 15 µA at 7h15. |
Attachment 1: Run2116_initScalers.png
|
|
Attachment 2: HT_MUST2_Wed30May_At7h05.png
|
|
Attachment 3: Run2116_MMimpacts_At7h23.png
|
|
Fixed | e744 |
Wed May 30 08:34:51 2018 |
Valérie | RUN | General | CH2 | Run 2117- low or no beam |
Wednesday 30th May.
Run 2117 started at 8h36 ; Stop at 8h45: BEAM STOP.
Beam decreased at the end of Run 2116, still very low at the beginning of run 2117, 300 pps then 3 pps.
PCP told us that it should take a few minutes to recover it, but it will take more time (maybe 1/2 hour) to recover the beam,
due to vacuum problems before the target. The operators have to enter in the vault to check the equipments.
target n°4. CH2 104 µm
All triggers, (no LISE)
Divisions CATS1 3. 10**4. PPT 3000 ; EXL 10**4
Morning team: Louis, Phil, Marlete Valérie
cf current of T4 around 12 µA at 8h50 decreasing to 10 µA at 9h02 when there is no beam. |
Attachment 1: Run2117_scalersINIT.png
|
|
Ongoing | e744 |
Wed May 30 09:24:28 2018 |
Valérie, Adrien, Freddy | RUN | General | CH2 | Run 2118 |
Wednesday 30th May.
Run 2118 started at 9h23 ;
Stop at: 11h25
Beam back at low rate and increase to 1.2*10^5 pps
target n°4. CH2 104 µm
All triggers, (no LISE)
Divisions CATS1 3. 10**4. PPT 3000 ; EXL 10**4
Morning team: Adrien, Freddy, François, Valérie ; LISE team: Jean-Charles.
cf current of T4 around 9.2 µA at 9h25. CHECK IT REGULARLY |
Attachment 1: Run2118_scalersINIT.png
|
|
Attachment 2: Run2118_HT_EXLat9h29.png
|
|
Attachment 3: Run2118_scalersIat9h33.png
|
|
Attachment 4: Run2118_MMimpacts.png
|
|
Attachment 5: Run2118_CsIExlandETimePPT.png
|
|
Ongoing | e744 |
Wed May 30 11:17:00 2018 |
Valerian maurycy and Olivier | OFFLINE | General | CH2 | Condition on time T5 |
One should add the condition Si_TX < 150 for T5, problem from Ta? |
Attachment 1: SiEvsSiT_T5_issue.png
|
|
Ongoing | e744 |
Wed May 30 11:22:16 2018 |
Valerian maurycy and Olivier | OFFLINE | General | CH2 | Checking the cuts |
cut_DeE :
- T1 OK
- T2 OK
- T3 OK
cut ToF :
- T1 OK
- T2 OK
- T3 OK |
Fixed | e744 |
Wed May 30 11:42:41 2018 |
Freddy, Adrien | RUN | General | CH2 | Run 2119 - Target 4 CH2 |
Run 2119
Start: 11h25m53s
Stop: 13h24
Beam 14O at: 1.6*10^5 pps
target n°4. CH2 104 µm
All triggers, (no LISE)
Divisions (Unchanged) CATS1 3. 10**4. PPT 3000 ; EXL 10**4
Comments:
- We realized that the pulser frequency for dead time measurement changed from 100 Hz to 50 Hz a few runs ago. It is not clear if someone changed it during an intervention in D6.
|
Attachment 1: Run2119_initScalers.png
|
|
Attachment 2: Run2119_MMimpacts_At11h25.png
|
|
Attachment 3: Run2119_TAC.png
|
|
Attachment 4: Run2119_Trigger.png
|
|
Attachment 5: Run2119_HT.png
|
|
Fixed | e744 |
Wed May 30 13:25:57 2018 |
Phil, Freddy | RUN | General | CH2 | Run 2020 - target number 4 |
Run 2020
Start: 13h24m
Stop: 13h41
Beam 14O at: 1.2*10^5 pps
target n°4. CH2 104 µm
All triggers, (no LISE)
Divisions (Unchanged) CATS1 3. 10**4. PPT 3000 ; EXL 10**4
Comments:
Pulser frequency is still at 48 Hz, i.e. lower than expected - expect 100ish Hz. Freddy is investigating.
!!! Beam intensity is dropping a lot so run stopped at 13h41. !!! |
Attachment 1: Scalers_start_run2020.png
|
|
Attachment 2: Run2020_leakages_13h35.png
|
|
Ongoing | e744 |
Wed May 30 13:48:02 2018 |
Phil | DAQ | General | N/A | Pulser values |
Here's a list of pulser values taken from the last few runs as a reference for what rate the "100-Hz" pulser is actually seeing.
All rates in Hz.
29 May:
6h52 62
9h36 96
9.39 96
10.35 50
30 May
12.15 76
12.16 84
3.01 48
3.21 96
3.27 48
4.57 48
7.15 48
8.39 48
9.26 48
9.33 66
11.35 48
1.29 48
Rate was 48 Hz when the run was stopped due to loss of beam (I looked but didn't take a picture).
I don't know if this problem is caused by the scaler counting behaving oddly but that seems like a more obvious solution than the pulser frequency randomly changing. If the pulser is actually vital for the experiment, someone should look in the offline data to see what's happening. |
Pending | e744 |
Wed May 30 15:26:40 2018 |
Francois Marlete | BEAM | General | | problem with beam |
14H00 : The primary beam was misaligned, they are still working on it. No 14O beam. |
Ongoing | e744 |
Thu May 31 16:42:30 2018 |
iulian | EXL-PPT | General | 60Co | Run 3000 60Co source PPT & EXL triggers |
Run 3000
60Co source
PPT & EXL triggers
EXL 1 HT found tripped at the end of the run...
start 16h40 31/05
stop 17h35 31/05 |
Attachment 1: Scalers_start_run3001.png
|
|
Attachment 2: Scalers_stop_run3000.png
|
|
Attachment 3: ppt_exl_run3000.png
|
|
Attachment 4: ppt_exl2_run3000.png
|
|
Ongoing | e744 |
Thu May 31 17:45:21 2018 |
iulian | MUST2 | General | 3-alpha | run #3001 alpha source T1-T5 |
run #3001
alpha source T1-T5 |
Attachment 1: scaler_startt_run3001.png
|
|
Attachment 2: scaler_stop_run3002.png
|
|