Fixed, e744, Thu May 24 20:18:00 2018, e744 Must2 + Lise teams, RUN, General, N/A, tuning Wien-Spiral 14N test MM5impactWien2kV.pngMM5stripsXYWien0.4et0.4kV.pngMM5impactXYWien0.4et0.4kV.pngscalersduringTuningwithWienfilter.png
Run 24May at 19h50-20pm no storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)

see plot of beam impact Wien filter +0.4 kV, +0.4 kV
cf scalers during Run
Fixed, e744, Thu May 24 20:19:19 2018, e744 Must2 + Lise teams, RUN, General, N/A, Beam centering on MM5-Spiral 14N test MM5strXYWienCenter.pngMM5impactXYWienCenter.pngScalersTuningWienCenterMM5.png
Run 24May at 19h50-20pm no storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)

see plot of beam impact when the beam is centered
cf scalers during Run
Fixed, e744, Thu May 24 20:21:57 2018, e744 Must2 + Lise teams, RUN, General, N/A, Run 462 Beam centering on MM5-Spiral 14N test MM5ImpactsRun462.pngBeamOnMM5stripsXYRun462.pngScalersduringRun462.pngScalersEndRun462.png
Run 462 focalisation on target 24May at 20h15pm storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)

see plot of beam impact the beam is centered
cf scalers during Run and end of run.
Fixed, e744, Thu May 24 20:31:30 2018, e744 Must2 + Lise teams (edit: Valérie), RUN, General, N/A, Run 463 Beam Spiral 14N test scalersendOfRun463.pngMM5stripsXYERun463.pngMM5ImpactsRun463.png
Run 463 focalisation on Must2 24May at 20h30pm storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)

see plot of beam impact
cf scalers end of run.

NOTE THAT The delay is at present 50 ns on the Cats signal "CATS delayed"
it was changed during the run 463 (the previous value was 500 ns).
Fixed, e744, Thu May 24 21:05:05 2018, Valerian Iulian and Francois, TARGET, Hardware, , 14N - 187um target placement 20180524_210115.jpg
For resonant elastic scattering of 14N(pp)14N the 187um target is placed.
Fixed, e744, Thu May 24 21:05:19 2018, e744 Must2 + Lise teams (edit: Valérie), MUST2, Hardware, N/A, change of STOP MUST2 
The STOP of MUST2 with CATS is now directly the CATS "delayed signal".
No coincidence with FAG.
NB: the CATS "delayed signal"is the fast time signal from CATS in D4, which is sent to the DAQ area of D6, then delayed.
The delay is at present 50 ns, it was changed during the run 463 (previous value was 500 ns).

Total time to go between exp area to DAQ room then back to exp area is measured to be 780ns.
-->approximately we have the time of 390 to 400 ns to go between DAQ room and D6 exp area.
Fixed, e744, Thu May 24 21:28:45 2018, e744 Must2 + Lise teams (edit: Valérie), RUN, General, CH2, Run 464 Beam Spiral 14N test TAcrefGAGmmCatsHFRun464.pngScalersDuringRun464at21h30.pngMM5ImpactsRun464.pngMM5ImpactsRun464zoom.pngMM5StrXYRun464.png
Run 464 focalisation on Must2 24May at 21h25m storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)

focalisation on target ; Target CH2 187µm position num6
see plot of beam impact
cf scalers end of run.
14N 7.6791 MeV/n 14N7+ Brho = 0.79679 T.m measured at CIME
!!!NOTE THAT The delay is at present 50 ns on the Cats signal "CATS delayed"
it was changed during the run 463 (the previous value was 500 ns).
Fixed, e744, Thu May 24 22:38:44 2018, e744 Must2+lise teams , RUN, General, CH2, Run Beam Spiral 14N centered 7x
Shift teams: François, Iulan, Freddy, Fairouz, Valérian, Valérie, Mihail
LISE teams during evening: Omar Kamalou, Luc Perrot, Pierre Delahaye
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)

focalisation on target ; Target CH2 187µm position num6
see plot of beam impact
cf scalers end of run.
14N 7.6791 MeV/n 14N7+ Brho = 0.79679 T.m measured at CIME
Fixed, e744, Thu May 24 22:45:36 2018, e744 Must2+lise teams , RUN, General, CH2, Run 1001 Beam Spiral 14N centered scaler-run1001.pngMMimpactsRun1001.png
Run 1001, cible n°6: 183 um
start @ 21h55; Stop @ 22h36
Shift teams: François, Iulan, Freddy, Fairouz, Valérian, Valérie, Mihail
LISE teams during evening: Omar Kamalou, Luc Perrot, Pierre Delahaye
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)

focalisation on target ; Target CH2 187µm position num6

see plot of beam impact
cf scalers end of run.
14N 7.6791 MeV/n 14N7+ Brho = 0.79679 T.m measured at CIME
Fixed, e744, Fri May 25 00:09:03 2018, Cristina , RUN, General, CH2, run 1003 (target no 6 -CH2 180 um) 6x
run 1003

14N

start@ 23:18 24/05/2018

stop@ 000:33
Fixed, e744, Fri May 25 00:41:19 2018, Cristina and Pedja, RUN, General, CH2, run 1004 (target no 6 -CH2 180 um) 7x

Run 1004
the thresholds of MUST detector changed to ~0.5 MeV

start@ 00:38 25/05/2018
stop@ 00:57 (due to beam problems Q31 was at 0 - CAMA22 had to be reset)
Fixed, e744, Fri May 25 01:05:05 2018, Cristina and Pedja, RUN, General, CH2, run 1005 (target no 6 -CH2 180 um) scalers_start_run1005.pngscalers_stop_run1005.pngMMimpactsRun1005.pngTAC_run1005.png

Run 1005

beam intensity fluctuations

start@ 01:17 25/05/2018

stop@ 02:28
Fixed, e744, Fri May 25 02:35:13 2018, Cristina and Pedja, RUN, General, CH2, run 1006 (target no 6 -CH2 180 um) scalers_start_run1006.pngscaler-stop-run1006.pngtac-run1006.pngmm_impact_run1006.png

Run 1006

Around 3h10 Water leak was happened, shutting down all power supplies.
start@ 02:29 25/05/2018

stop@ 03:10
Fixed, e744, Fri May 25 08:37:04 2018, Adrien Matta, MUST2, Hardware, N/A, MUST2 cooling 
Vacuum at 1.7 e-5 torr this morning.
I started the MUST2 cooling, setting both coolers at -5C.
Time of operation 8h35.
Alcohol level checked, look OK.
Fixed, e744, Fri May 25 15:29:51 2018, François, OTHER, Hardware, , tac FAG_HF 
A delay of 500 ns was put to the start signal = FAG of the FAG_HF_validated TAC
and a range of 500 ns selected
Fixed, e744, Fri May 25 15:41:50 2018, e744- Valérie, DAQ, General, N/A, DAS configurations for E744-Summary 11x
List of the saved files of the DAS configuration used on May-24h and May-25th:
[Note that:
All the files are used on run with the name "e744.das".
It means that, for changing from the present das file to another one for the run, you need to open it in the DAS, then to save it with the current experiment name "e774.das".
then you need to be ONLINE to write hardware, in order to apply the electronic settings.


- file for the CALIMERO configuration with the thresholds set at 1 MeV e744.das = e744calimero_1MeVOK.das

- files for the test runs with the 14N:
the file at the beginning of the experiment on 14N was: e744.das = 744_24MayMANIPok.das
Then for the run 1004 and the next ones, the thresholds were changed to around 500keV on all the telescopes.
Runs 1004, 1005, 1006 The config file corresponds to e744.das = e744_25MayMANIPok500keV.das
Thresholds on CsI for the runs with 14N: MATE 18 Seuil Haut 8220 ; Seuil bas 8160
ConfigCsIThreshBefore8220.png
------------------------------------EXPERIMENT 14O 25 MAY evening 17pm ----------------------------------------------
New DAS file corresponds to the change of the CsI thresholds on all telescopes
e744_25MayEXPok500keVCsIThr.das
This is the file that we will use at the beginning of the runs with the 14O beam.
New threshold pedestals on CsI for the runs: ChangeAllCsIThresholds8210.png
MATE 18 Seuil Haut 8210 ; Seuil bas 8160

Later on, the threshold on MM5 will be increased to around 1 MeV (to reduce the background rate due to the beta).
NB: the files are in:
home/e748/ganacq_manip/e744/das-save

------------------------------------------------------
threshold T1 488 keV
threshold T2 480 keV
threshold T3 492 keV
threshold T4 457 keV
threshold T5 480 keV <----------------Maybe to be changed to 1 MeV later on, during the tuning of 14O, depending on the dead time.

---------------------------------------------------

E744_GMTtrigAll.png
Input entried of the GMT trigger module:
IN1 to IN5 : MM1 to MM5
IN6: nothing IN7: nothing
IN8: Cats (divided by 3. 10**4)
IN9: nothing
IN10: PPT
IN11: EXL
IN12: nothing
IN13: LISE trigger (SiD4 or D6)
IN14, IN15: nothing
-----------------------------------------------
Fixed, e744, Fri May 25 17:42:21 2018, shumpei, MUST2, Software, N/A, CsI energy calibration for MUST2 telescopes 6x
Calibration parameter for MUST2 CsI crystals are calculated with run1001-1006.
Attached are dE(DSSD)-E(CsI) plot of all the telescopes and parameters.
The parameter files are in
/home/e748/analysis/nptool/Projects/e744/Calibration/Energy/Calibration/CsI_rough

How to make the parameters;
For dE-E plot, the strongest locus should be proton.
Approximation formula for proton dE (Si 300 micrometer)-E (residual) I used is
(CsI_Energy) = -6.81774+41.1823/(Si_Energy-0.0814779).

Absolute value for the total energy may have some offset, but the gain of all the crystals should be roughly matched.
Maybe we need one more common parameter to adjust absolute value.

T2 Crystal #1 and #10 have no data. As I remember, this is the same as E748 exp. last year.
Crystals #9 for all the telescopes have low statistics. I'm afraid the mapping of crystal #9 is not correct.
->nptool/NPLib/Detectors/MUST2/TMust2Physics.cxx m_CsI_MatchingY[8]=48 but should be equal to 16 (corrected and re-compiled 27/05/2018).
Fixed, e744, Fri May 25 17:51:45 2018, e744 Iulan Valérie, RUN, General, CH2, Run 1008 starting runs with 14N BTdssdMust2_25May18.pngHTdssdMust2_25May.pngHV_EXL_25May.png
BAD RUN FOR 14N

Run 1008 BAD RUN 0 Events
14N beam rate high intensity ~ 0.1 nA
CH2 n°6
All triggers ON
MM1 to MM5 ; cats div
EXL PPT and LISE
NB: at the beginning there was no HV on EXL then put ON.
No beam at the end of the run.
NB: The power is around 1 kW on machine production target.
Fixed, e744, Fri May 25 18:15:41 2018, Pierre, MUST2, General, CD2, new dEE PID using Shumpei calibration PID_dEE_newCsIcalib.png
Fixed, e744, Fri May 25 21:34:19 2018, e744 Iulan, Fairouz, Valerie, DAQ, Hardware, CH2, Problem of FAG validation +change of ADC parameter for TAC signal ProblemGMTtriggerVXI.png
The Time signal MM_PPT is now in the parameter MCP_HF of the ADC.
The problem was on the FAG signal validation (bad output of the discriminator)

the TAC MM_PPT with start FAG and STOP ppt is now coded in the entry of ADC MCP_HF , add=9 (channel 10)
Previously it was add =3 (channel 4).

Problem of DAQ encountered in the evening (20 pm) no DAQ counting, no FAG from GMT: we first reboot on software (Terminal iolan: iolan must2 all; reboot).
but the DAQ was still blocked.
We phoned to the hardware astreinte (Charles H), he told us to reset the hardware.
The problem was solved by resetting the crates (reset button on the crates ganlx1 and ganlx14 in D6).
The DAQ restarted correctly.