MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 27 of 48  Not logged in MUST2
Fixed, e748, Wed Jul 5 10:58:54 2017, Valérie L, RUN, General, CD2, Run summary 327, 328 Run328Scaler.pngCheckParamBytesEvtNumexoRun328.png
run daq E748  (3h30 for 1Go)
-r--r--r-- 1 e748 Exxx  100M  5 juil. 10:14 run_0327.dat.05-07-17_09h55m11s
-rw-r--r-- 1 e748 Exxx  212M  5 juil. 10:55 run_0328.dat.05-07-17_10h14m56s
Fixed, e748, Thu Jul 6 08:22:08 2017, Valérie L, RUN, General, CD2, Problem of DAQ and networks problems ProblèmeDAQ6juillet8h.pngProblemGUIRuncontrolNumExo.pngRebootsoftCrateAGAVApassword.pngProblemDAQ5juilletNumExo.png
After the problem on Run control and the offline of MUST2, the DAQ on numexo could not be started again.
see error messages below.
The soft "astreinte" was called at 8h20 and also the one of G2I at 8h30 for network problems.
Fixed, e748, Thu Jul 6 09:54:53 2017, Valérie L, RUN, General, CD2, Run control OK -Runs 339 and 340 CorrelBidimChioandplotCatsRun340.pngRun339scalers.pngScalersAnalyserRun340.png
After the reboot soft of the AGAVA NUMEXO and realignment of the TGS (time stamp Agava) the situation is stabilized.
The  "astreintes" for hardware (Gilles W) and software (Clotilde M) have rebooted from the Terminal the crates (AGAVA).
Antoine Lemasson has reloaded the setup of the GTS.
Fixed, e748, Thu Jul 6 10:35:50 2017, Valérie L, MUST2, General, CD2, Sili-1/T5 trip 
The Sili1 of T5 has tripped (again) at 10h30.
On again. 400V; I ~ 20µA at 10h40, still increasing 25.6µA at 11h30.(The limit Io is set at 26µA)
To regulate this detector the Vo set is put at 380V instead of 400V. Now I ~ 24.4µA.
Fixed, e748, Thu Jul 6 11:41:20 2017, Valérie L, DAQ, General, N/A, MEMO START/STOP + AGAVA configuration in DAS AfterRebootAgavaRegStatusOx80entréeAfterAlignt.pngDasVMEChioCheckSamplesNumber.pngRunControl748On.pngRunControlNarvalE748chioON.pngParameterListWatcherOnRCe748chio.png
START/STOP of the DAQ
---------------------------------------------------------------------
START acquisition e748chio  (DAQ Numexo; in the Run Control display on ganp976)
Fixed, e748, Thu Jul 6 13:37:22 2017, Valérie L, RUN, General, CD2, Run 341 ScalersRun341Beginning.pngScalersRun341At14h35.png
Run 341 START AT 13h37 STOP AT 15h21 (beam stop see the ELOG entry Id=239)
At the beginning (cf scalers below) the beam was at 6µA (--> CATS at 30kcps/s), the machine needs to recover slowly to go to 7eµA.
(run checked with Ganil_Tape ok)
Fixed, e748, Thu Jul 6 17:05:51 2017, Valérie L, RUN, General, CD2, run 342 +overview of TAC ScalersRun342at17h10.pngCorrelDatTrigGatconfRun342.pngCorrelTpulserChiorun342.pngRun342_Tcats12.pngRun342_TACcats1.png
Beam recovered after shut down due to the vacuum problem (power supply on the vacuum system was off). Beam was off during 1h30.

Run 342 started at 17h04 
Fixed, e755, Mon Jun 25 02:34:30 2018, Valérie +Target: Takeshi, RUN, General, Cryo-LH2, RUN 113 11x
Run 113 25th June start @ 2h34 stop @ 3h57
e748 Exxx 3957925525 25 juin  03:57 /data/e748X/e755/acquisition/run/run_0113.dat.25-06-18_02h34m10s
  
Fixed, e755, Mon Jun 25 03:58:22 2018, Valérie +Target: Takeshi, RUN, General, Cryo-LH2, RUN 114 9x
Run 114 25th June start @ 3h57 stop @5h34

 e748 Exxx 4015552641 25 juin  05:34 /data/e748X/e755/acquisition/run/run_0114.dat.25-06-18_03h57m34s
Fixed, e755, Mon Jun 25 05:34:53 2018, Valérie +Target: Takeshi, RUN, General, Cryo-LH2, RUNS 115, 115.1 and 116 Run115ScalersAt5h37.pngRun115ScalersAt6h39.pngRun115b1_scalersAt7h20.pngRun115b1BeamProfile.pngRun116_ScalersAt8h26.png
Run 115 25th June start @ 5h34 stop@6h57
 e748 Exxx 4190541701 25 juin  06:57 /data/e748X/e755/acquisition/run/run_0115.dat.25-06-18_05h34m33s
  -------------------------------------------------------------------------------
Fixed, e755, Mon Jun 25 00:13:48 2018, Valérie +Lise team: Jean-Charles+Target: Takeshi, RUN, General, Cryo-LH2, RUN 111 16x
Run 111  25th June start @ 0h stop @1h13

e748 Exxx 3590054877 25 juin  01:14 /data/e748X/e755/acquisition/run/run_0111.dat.24-06-18_23h59m52s
Fixed, e755, Mon Jun 25 01:17:47 2018, Valérie +Lise team: Jean-Charles+Target: Takeshi, RUN, General, Cryo-LH2, RUN 112 6x
Run 112 25th June start @ 1h14 stop @ 2h34
e748 Exxx 3769078581 25 juin  02:34 /data/e748X/e755/acquisition/run/run_0112.dat.25-06-18_01h14m03s
 Target seems to be still ok and filled! see CATS plot on target
Fixed, e744, Tue May 29 19:03:38 2018, Valérie (edit), RUN, General, CH2, Run #2112 BEAM BACK 14x
run #2112
Beam back given by the machine. 
Beam+ Lise team: Omar K and Pierre Delahaye, Jean-Charles T.
Fixed, e744, Tue May 22 19:40:48 2018, Valérie , MUST2, General, N/A, snapshots for steps in Calimero calibration 11x
 
Fixed, e744, Tue May 22 11:37:50 2018, Valérie, MUST2, Software, N/A, calimero config GECO PlotTel1strxT101calimOk.pngPlotXTel1tXT88Probmate.pngPlotXTel1to4XTProbmate.pngPlotXTel1to4XTcalimero.png
 
Calimero T1-T4 strips X
Time Calibrator 640 ns ; period 20 ns
Fixed, e744, Tue May 22 11:59:06 2018, Valérie, MUST2, Software, N/A, Calimero config GECO 8x
 
Fixed, e744, Wed May 23 10:52:28 2018, Valérie, EXL-PPT, General, N/A, RUN #405, EXL PPT trigger GMTtriggerRun405.pngScalersRun405.pngEXL_E1to16duringRun405.pngEXL_T1to16duringRun405.png
RUN #405
start exl ppt run for checking coincidence
 
Fixed, e744, Tue May 29 21:41:55 2018, Valérie, RUN, General, CH2, Run #2113 9x
[B]RUN #2113 start @ 21h37; stop 0h14 @ [/B] 
 target n°4. CH2 104 µm
All triggers, (no LISE)
Fixed, e738, Sun Jul 8 14:23:43 2018, Valérie, RUN, General, Cryo-LH2, RUN Summary and MUST2, DAQ conditions 12x
MUST2 
Physical thresholds ~ 400 keV see DASmust2T4Thres400keV.png 
Pedestals see snapshots DASmust2T1pedestalsThr.png ; 
Fixed, e748, Tue Jun 6 18:17:03 2017, Valérian et François, EXL, Hardware, , Hardware coupling of EXL with MUST2 EXL_MUST2_top.jpgEXL_MUST2_side.jpg
EXL seems to fit with Adrien's setup. 
We still have to test if it fits inside the chamber.

ELOG Home Page