Fixed, e748, Wed Jul 5 10:58:54 2017, Valérie L, RUN, General, CD2, Run summary 327, 328 
|
run daq E748 (3h30 for 1Go)
-r--r--r-- 1 e748 Exxx 100M 5 juil. 10:14 run_0327.dat.05-07-17_09h55m11s
-rw-r--r-- 1 e748 Exxx 212M 5 juil. 10:55 run_0328.dat.05-07-17_10h14m56s
|
Fixed, e748, Thu Jul 6 08:22:08 2017, Valérie L, RUN, General, CD2, Problem of DAQ and networks problems   
|
After the problem on Run control and the offline of MUST2, the DAQ on numexo could not be started again.
see error messages below.
The soft "astreinte" was called at 8h20 and also the one of G2I at 8h30 for network problems.
|
Fixed, e748, Thu Jul 6 09:54:53 2017, Valérie L, RUN, General, CD2, Run control OK -Runs 339 and 340  
|
After the reboot soft of the AGAVA NUMEXO and realignment of the TGS (time stamp Agava) the situation is stabilized.
The "astreintes" for hardware (Gilles W) and software (Clotilde M) have rebooted from the Terminal the crates (AGAVA).
Antoine Lemasson has reloaded the setup of the GTS.
|
Fixed, e748, Thu Jul 6 10:35:50 2017, Valérie L, MUST2, General, CD2, Sili-1/T5 trip
|
The Sili1 of T5 has tripped (again) at 10h30.
On again. 400V; I ~ 20µA at 10h40, still increasing 25.6µA at 11h30.(The limit Io is set at 26µA)
To regulate this detector the Vo set is put at 380V instead of 400V. Now I ~ 24.4µA.
|
Fixed, e748, Thu Jul 6 11:41:20 2017, Valérie L, DAQ, General, N/A, MEMO START/STOP + AGAVA configuration in DAS    
|
START/STOP of the DAQ
---------------------------------------------------------------------
START acquisition e748chio (DAQ Numexo; in the Run Control display on ganp976)
|
Fixed, e748, Thu Jul 6 13:37:22 2017, Valérie L, RUN, General, CD2, Run 341 
|
Run 341 START AT 13h37 STOP AT 15h21 (beam stop see the ELOG entry Id=239)
At the beginning (cf scalers below) the beam was at 6µA (--> CATS at 30kcps/s), the machine needs to recover slowly to go to 7eµA.
(run checked with Ganil_Tape ok)
|
Fixed, e748, Thu Jul 6 17:05:51 2017, Valérie L, RUN, General, CD2, run 342 +overview of TAC    
|
Beam recovered after shut down due to the vacuum problem (power supply on the vacuum system was off). Beam was off during 1h30.
Run 342 started at 17h04
|
Fixed, e755, Mon Jun 25 02:34:30 2018, Valérie +Target: Takeshi, RUN, General, Cryo-LH2, RUN 113 11x
|
Run 113 25th June start @ 2h34 stop @ 3h57
e748 Exxx 3957925525 25 juin 03:57 /data/e748X/e755/acquisition/run/run_0113.dat.25-06-18_02h34m10s
|
Fixed, e755, Mon Jun 25 03:58:22 2018, Valérie +Target: Takeshi, RUN, General, Cryo-LH2, RUN 114 9x
|
Run 114 25th June start @ 3h57 stop @5h34
e748 Exxx 4015552641 25 juin 05:34 /data/e748X/e755/acquisition/run/run_0114.dat.25-06-18_03h57m34s
|
Fixed, e755, Mon Jun 25 05:34:53 2018, Valérie +Target: Takeshi, RUN, General, Cryo-LH2, RUNS 115, 115.1 and 116    
|
Run 115 25th June start @ 5h34 stop@6h57
e748 Exxx 4190541701 25 juin 06:57 /data/e748X/e755/acquisition/run/run_0115.dat.25-06-18_05h34m33s
-------------------------------------------------------------------------------
|
Fixed, e755, Mon Jun 25 00:13:48 2018, Valérie +Lise team: Jean-Charles+Target: Takeshi, RUN, General, Cryo-LH2, RUN 111 16x
|
Run 111 25th June start @ 0h stop @1h13
e748 Exxx 3590054877 25 juin 01:14 /data/e748X/e755/acquisition/run/run_0111.dat.24-06-18_23h59m52s
|
Fixed, e755, Mon Jun 25 01:17:47 2018, Valérie +Lise team: Jean-Charles+Target: Takeshi, RUN, General, Cryo-LH2, RUN 112 6x
|
Run 112 25th June start @ 1h14 stop @ 2h34
e748 Exxx 3769078581 25 juin 02:34 /data/e748X/e755/acquisition/run/run_0112.dat.25-06-18_01h14m03s
Target seems to be still ok and filled! see CATS plot on target
|
Fixed, e744, Tue May 29 19:03:38 2018, Valérie (edit), RUN, General, CH2, Run #2112 BEAM BACK 14x
|
run #2112
Beam back given by the machine.
Beam+ Lise team: Omar K and Pierre Delahaye, Jean-Charles T.
|
Fixed, e744, Tue May 22 19:40:48 2018, Valérie , MUST2, General, N/A, snapshots for steps in Calimero calibration 11x
|
|
Fixed, e744, Tue May 22 11:37:50 2018, Valérie, MUST2, Software, N/A, calimero config GECO   
|
Calimero T1-T4 strips X
Time Calibrator 640 ns ; period 20 ns |
Fixed, e744, Tue May 22 11:59:06 2018, Valérie, MUST2, Software, N/A, Calimero config GECO 8x
|
|
Fixed, e744, Wed May 23 10:52:28 2018, Valérie, EXL-PPT, General, N/A, RUN #405, EXL PPT trigger   
|
RUN #405
start exl ppt run for checking coincidence
|
Fixed, e744, Tue May 29 21:41:55 2018, Valérie, RUN, General, CH2, Run #2113 9x
|
[B]RUN #2113 start @ 21h37; stop 0h14 @ [/B]
target n°4. CH2 104 µm
All triggers, (no LISE)
|
Fixed, e738, Sun Jul 8 14:23:43 2018, Valérie, RUN, General, Cryo-LH2, RUN Summary and MUST2, DAQ conditions 12x
|
MUST2
Physical thresholds ~ 400 keV see DASmust2T4Thres400keV.png
Pedestals see snapshots DASmust2T1pedestalsThr.png ;
|
Fixed, e748, Tue Jun 6 18:17:03 2017, Valérian et François, EXL, Hardware, , Hardware coupling of EXL with MUST2 
|
EXL seems to fit with Adrien's setup.
We still have to test if it fits inside the chamber. |
|