Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Fixed | e744 |
Thu May 24 20:18:00 2018 |
e744 Must2 + Lise teams | RUN | General | N/A | tuning Wien-Spiral 14N test |
Run 24May at 19h50-20pm no storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)
see plot of beam impact Wien filter +0.4 kV, +0.4 kV
cf scalers during Run |
Attachment 1: MM5impactWien2kV.png
|
|
Attachment 2: MM5stripsXYWien0.4et0.4kV.png
|
|
Attachment 3: MM5impactXYWien0.4et0.4kV.png
|
|
Attachment 4: scalersduringTuningwithWienfilter.png
|
|
Fixed | e744 |
Thu May 24 20:19:19 2018 |
e744 Must2 + Lise teams | RUN | General | N/A | Beam centering on MM5-Spiral 14N test |
Run 24May at 19h50-20pm no storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)
see plot of beam impact when the beam is centered
cf scalers during Run |
Attachment 1: MM5strXYWienCenter.png
|
|
Attachment 2: MM5impactXYWienCenter.png
|
|
Attachment 3: ScalersTuningWienCenterMM5.png
|
|
Fixed | e744 |
Thu May 24 20:21:57 2018 |
e744 Must2 + Lise teams | RUN | General | N/A | Run 462 Beam centering on MM5-Spiral 14N test |
Run 462 focalisation on target 24May at 20h15pm storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)
see plot of beam impact the beam is centered
cf scalers during Run and end of run. |
Attachment 1: MM5ImpactsRun462.png
|
|
Attachment 2: BeamOnMM5stripsXYRun462.png
|
|
Attachment 3: ScalersduringRun462.png
|
|
Attachment 4: ScalersEndRun462.png
|
|
Fixed | e744 |
Thu May 24 20:31:30 2018 |
e744 Must2 + Lise teams (edit: Valérie) | RUN | General | N/A | Run 463 Beam Spiral 14N test |
Run 463 focalisation on Must2 24May at 20h30pm storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)
see plot of beam impact
cf scalers end of run.
NOTE THAT The delay is at present 50 ns on the Cats signal "CATS delayed"
it was changed during the run 463 (the previous value was 500 ns). |
Attachment 1: scalersendOfRun463.png
|
|
Attachment 2: MM5stripsXYERun463.png
|
|
Attachment 3: MM5ImpactsRun463.png
|
|
Fixed | e744 |
Thu May 24 21:05:05 2018 |
Valerian Iulian and Francois | TARGET | Hardware | | 14N - 187um target placement |
For resonant elastic scattering of 14N(pp)14N the 187um target is placed. |
Attachment 1: 20180524_210115.jpg
|
|
Fixed | e744 |
Thu May 24 21:05:19 2018 |
e744 Must2 + Lise teams (edit: Valérie) | MUST2 | Hardware | N/A | change of STOP MUST2 |
The STOP of MUST2 with CATS is now directly the CATS "delayed signal".
No coincidence with FAG.
NB: the CATS "delayed signal"is the fast time signal from CATS in D4, which is sent to the DAQ area of D6, then delayed.
The delay is at present 50 ns, it was changed during the run 463 (previous value was 500 ns).
Total time to go between exp area to DAQ room then back to exp area is measured to be 780ns.
-->approximately we have the time of 390 to 400 ns to go between DAQ room and D6 exp area.
|
Fixed | e744 |
Thu May 24 21:28:45 2018 |
e744 Must2 + Lise teams (edit: Valérie) | RUN | General | CH2 | Run 464 Beam Spiral 14N test |
Run 464 focalisation on Must2 24May at 21h25m storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)
focalisation on target ; Target CH2 187µm position num6
see plot of beam impact
cf scalers end of run.
14N 7.6791 MeV/n 14N7+ Brho = 0.79679 T.m measured at CIME
!!!NOTE THAT The delay is at present 50 ns on the Cats signal "CATS delayed"
it was changed during the run 463 (the previous value was 500 ns). |
Attachment 1: TAcrefGAGmmCatsHFRun464.png
|
|
Attachment 2: ScalersDuringRun464at21h30.png
|
|
Attachment 3: MM5ImpactsRun464.png
|
|
Attachment 4: MM5ImpactsRun464zoom.png
|
|
Attachment 5: MM5StrXYRun464.png
|
|
Fixed | e744 |
Thu May 24 22:38:44 2018 |
e744 Must2+lise teams | RUN | General | CH2 | Run Beam Spiral 14N centered |
Shift teams: François, Iulan, Freddy, Fairouz, Valérian, Valérie, Mihail
LISE teams during evening: Omar Kamalou, Luc Perrot, Pierre Delahaye
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)
focalisation on target ; Target CH2 187µm position num6
see plot of beam impact
cf scalers end of run.
14N 7.6791 MeV/n 14N7+ Brho = 0.79679 T.m measured at CIME
|
Attachment 1: MM1234TY_14N_Centered.png
|
|
Attachment 2: MM1234TX_14N_Centered.png
|
|
Attachment 3: MM1234Y_14N_Centered.png
|
|
Attachment 4: MM1234_14N_Centered.png
|
|
Attachment 5: MM5_14N_Centered.png
|
|
Attachment 6: TAC_14N_Centered.png
|
|
Attachment 7: MM_IMPACT_MATRIX_14N_Centered.png
|
|
Fixed | e744 |
Thu May 24 22:45:36 2018 |
e744 Must2+lise teams | RUN | General | CH2 | Run 1001 Beam Spiral 14N centered |
Run 1001, cible n°6: 183 um
start @ 21h55; Stop @ 22h36
Shift teams: François, Iulan, Freddy, Fairouz, Valérian, Valérie, Mihail
LISE teams during evening: Omar Kamalou, Luc Perrot, Pierre Delahaye
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)
focalisation on target ; Target CH2 187µm position num6
see plot of beam impact
cf scalers end of run.
14N 7.6791 MeV/n 14N7+ Brho = 0.79679 T.m measured at CIME
|
Attachment 1: scaler-run1001.png
|
|
Attachment 2: MMimpactsRun1001.png
|
|
Fixed | e744 |
Fri May 25 00:09:03 2018 |
Cristina | RUN | General | CH2 | run 1003 (target no 6 -CH2 180 um) |
run 1003
14N
start@ 23:18 24/05/2018
stop@ 000:33 |
Attachment 1: ESi_ECSI_run1003.png
|
|
Attachment 2: MM1_MM4_Y_run1003.png
|
|
Attachment 3: MM1_MM4_X_run1003.png
|
|
Attachment 4: MM5beam_run1003.png
|
|
Attachment 5: TAC_run1003.png
|
|
Attachment 6: scalers_end_run1003.png
|
|
Fixed | e744 |
Fri May 25 00:41:19 2018 |
Cristina and Pedja | RUN | General | CH2 | run 1004 (target no 6 -CH2 180 um) |
Run 1004
the thresholds of MUST detector changed to ~0.5 MeV
start@ 00:38 25/05/2018
stop@ 00:57 (due to beam problems Q31 was at 0 - CAMA22 had to be reset) |
Attachment 1: scalers_start_run1004.png
|
|
Attachment 2: scalers_stop_run1004.png
|
|
Attachment 3: ESi_ECSI_run1004.png
|
|
Attachment 4: MM1_MM4_Y_run1004.png
|
|
Attachment 5: MM1_MM4_X_run1004.png
|
|
Attachment 6: TAC_run1004.png
|
|
Attachment 7: MM5_run1004.png
|
|
Fixed | e744 |
Fri May 25 01:05:05 2018 |
Cristina and Pedja | RUN | General | CH2 | run 1005 (target no 6 -CH2 180 um) |
Run 1005
beam intensity fluctuations
start@ 01:17 25/05/2018
stop@ 02:28 |
Attachment 1: scalers_start_run1005.png
|
|
Attachment 2: scalers_stop_run1005.png
|
|
Attachment 3: MMimpactsRun1005.png
|
|
Attachment 4: TAC_run1005.png
|
|
Fixed | e744 |
Fri May 25 02:35:13 2018 |
Cristina and Pedja | RUN | General | CH2 | run 1006 (target no 6 -CH2 180 um) |
Run 1006
Around 3h10 Water leak was happened, shutting down all power supplies.
start@ 02:29 25/05/2018
stop@ 03:10 |
Attachment 1: scalers_start_run1006.png
|
|
Attachment 2: scaler-stop-run1006.png
|
|
Attachment 3: tac-run1006.png
|
|
Attachment 4: mm_impact_run1006.png
|
|
Fixed | e744 |
Fri May 25 08:37:04 2018 |
Adrien Matta | MUST2 | Hardware | N/A | MUST2 cooling |
Vacuum at 1.7 e-5 torr this morning.
I started the MUST2 cooling, setting both coolers at -5C.
Time of operation 8h35.
Alcohol level checked, look OK. |
Fixed | e744 |
Fri May 25 15:29:51 2018 |
François | OTHER | Hardware | | tac FAG_HF |
A delay of 500 ns was put to the start signal = FAG of the FAG_HF_validated TAC
and a range of 500 ns selected |
Fixed | e744 |
Fri May 25 15:41:50 2018 |
e744- Valérie | DAQ | General | N/A | DAS configurations for E744-Summary |
List of the saved files of the DAS configuration used on May-24h and May-25th:
[Note that:
All the files are used on run with the name "e744.das".
It means that, for changing from the present das file to another one for the run, you need to open it in the DAS, then to save it with the current experiment name "e774.das".
then you need to be ONLINE to write hardware, in order to apply the electronic settings.
- file for the CALIMERO configuration with the thresholds set at 1 MeV e744.das = e744calimero_1MeVOK.das
- files for the test runs with the 14N:
the file at the beginning of the experiment on 14N was: e744.das = 744_24MayMANIPok.das
Then for the run 1004 and the next ones, the thresholds were changed to around 500keV on all the telescopes.
Runs 1004, 1005, 1006 The config file corresponds to e744.das = e744_25MayMANIPok500keV.das
Thresholds on CsI for the runs with 14N: MATE 18 Seuil Haut 8220 ; Seuil bas 8160
ConfigCsIThreshBefore8220.png
------------------------------------EXPERIMENT 14O 25 MAY evening 17pm ----------------------------------------------
New DAS file corresponds to the change of the CsI thresholds on all telescopes
e744_25MayEXPok500keVCsIThr.das
This is the file that we will use at the beginning of the runs with the 14O beam.
New threshold pedestals on CsI for the runs: ChangeAllCsIThresholds8210.png
MATE 18 Seuil Haut 8210 ; Seuil bas 8160
Later on, the threshold on MM5 will be increased to around 1 MeV (to reduce the background rate due to the beta).
NB: the files are in:
home/e748/ganacq_manip/e744/das-save
------------------------------------------------------
threshold T1 488 keV
threshold T2 480 keV
threshold T3 492 keV
threshold T4 457 keV
threshold T5 480 keV <----------------Maybe to be changed to 1 MeV later on, during the tuning of 14O, depending on the dead time.
---------------------------------------------------
E744_GMTtrigAll.png
Input entried of the GMT trigger module:
IN1 to IN5 : MM1 to MM5
IN6: nothing IN7: nothing
IN8: Cats (divided by 3. 10**4)
IN9: nothing
IN10: PPT
IN11: EXL
IN12: nothing
IN13: LISE trigger (SiD4 or D6)
IN14, IN15: nothing
----------------------------------------------- |
Attachment 1: mm_thresholdT1.png
|
|
Attachment 2: mm_thresholdT2.png
|
|
Attachment 3: mm_thresholdT3.png
|
|
Attachment 4: mm_thresholdT4.png
|
|
Attachment 5: mm_thresholdT5.png
|
|
Attachment 6: ConfigCsIThreshBefore8220.png
|
|
Attachment 7: ChangeAllCsIThresholds8210.png
|
|
Attachment 8: E744_GMTtrigAll.png
|
|
Attachment 9: ChronogrammeE744_GMTmuvi1.png
|
|
Attachment 10: E744_GMTtrigslave.png
|
|
Attachment 11: ChronoE744_GMT2muvi2.png
|
|
Fixed | e744 |
Fri May 25 17:42:21 2018 |
shumpei | MUST2 | Software | N/A | CsI energy calibration for MUST2 telescopes |
Calibration parameter for MUST2 CsI crystals are calculated with run1001-1006.
Attached are dE(DSSD)-E(CsI) plot of all the telescopes and parameters.
The parameter files are in
/home/e748/analysis/nptool/Projects/e744/Calibration/Energy/Calibration/CsI_rough
How to make the parameters;
For dE-E plot, the strongest locus should be proton.
Approximation formula for proton dE (Si 300 micrometer)-E (residual) I used is
(CsI_Energy) = -6.81774+41.1823/(Si_Energy-0.0814779).
Absolute value for the total energy may have some offset, but the gain of all the crystals should be roughly matched.
Maybe we need one more common parameter to adjust absolute value.
T2 Crystal #1 and #10 have no data. As I remember, this is the same as E748 exp. last year.
Crystals #9 for all the telescopes have low statistics. I'm afraid the mapping of crystal #9 is not correct.
->nptool/NPLib/Detectors/MUST2/TMust2Physics.cxx m_CsI_MatchingY[8]=48 but should be equal to 16 (corrected and re-compiled 27/05/2018). |
Attachment 1: pid.pdf
|
|
Attachment 2: Cal_CsI_E_MM1.cal
|
MUST2_T1_CsI1_E -415.065 0.0506445
MUST2_T1_CsI2_E -394.373 0.0481228
MUST2_T1_CsI3_E -258.191 0.0315073
MUST2_T1_CsI4_E -298.563 0.0364456
MUST2_T1_CsI5_E -355.137 0.0433388
MUST2_T1_CsI6_E -411.171 0.0502037
MUST2_T1_CsI7_E -386.543 0.0471846
MUST2_T1_CsI8_E -382.674 0.0466991
MUST2_T1_CsI9_E -327.057 0.039966
MUST2_T1_CsI10_E -409.776 0.0500127
MUST2_T1_CsI11_E -376.919 0.0460117
MUST2_T1_CsI12_E -349.89 0.0427133
MUST2_T1_CsI13_E -363.497 0.0443635
MUST2_T1_CsI14_E -296.737 0.0361737
MUST2_T1_CsI15_E -466.684 0.0569536
MUST2_T1_CsI16_E -403.822 0.0492548
|
Attachment 3: Cal_CsI_E_MM2.cal
|
MUST2_T2_CsI1_E 0 -1000.0
MUST2_T2_CsI2_E -256.055 0.0312712
MUST2_T2_CsI3_E -305.683 0.0373285
MUST2_T2_CsI4_E -236.362 0.0288615
MUST2_T2_CsI5_E -230.941 0.0282124
MUST2_T2_CsI6_E -300.793 0.0367438
MUST2_T2_CsI7_E -332.791 0.0406243
MUST2_T2_CsI8_E -313.525 0.0382459
MUST2_T2_CsI9_E -308.535 0.0376744
MUST2_T2_CsI10_E 0 -1000.0
MUST2_T2_CsI11_E -331.027 0.0404172
MUST2_T2_CsI12_E -322.929 0.0393791
MUST2_T2_CsI13_E -269.007 0.0328459
MUST2_T2_CsI14_E -311.052 0.0379616
MUST2_T2_CsI15_E -264.410 0.0322532
MUST2_T2_CsI16_E -266.863 0.0325516
|
Attachment 4: Cal_CsI_E_MM3.cal
|
MUST2_T3_CsI1_E -286.396 0.0349372
MUST2_T3_CsI2_E -264.209 0.0322131
MUST2_T3_CsI3_E -229.529 0.0280088
MUST2_T3_CsI4_E -322.16 0.0393184
MUST2_T3_CsI5_E -252.731 0.0308459
MUST2_T3_CsI6_E -291.944 0.0356323
MUST2_T3_CsI7_E -297.43 0.036301
MUST2_T3_CsI8_E -295.725 0.036043
MUST2_T3_CsI9_E -263.931 0.0321985
MUST2_T3_CsI10_E -294.309 0.0359069
MUST2_T3_CsI11_E -345.658 0.0421607
MUST2_T3_CsI12_E -328.481 0.0400503
MUST2_T3_CsI13_E -253.866 0.0309577
MUST2_T3_CsI14_E -239.05 0.0291408
MUST2_T3_CsI15_E -238.476 0.029073
MUST2_T3_CsI16_E -265.489 0.0323667
|
Attachment 5: Cal_CsI_E_MM4.cal
|
MUST2_T4_CsI1_E -370.19 0.045178
MUST2_T4_CsI2_E -393.585 0.0480225
MUST2_T4_CsI3_E -436.711 0.0532717
MUST2_T4_CsI4_E -331.873 0.0405191
MUST2_T4_CsI5_E -321.175 0.0391971
MUST2_T4_CsI6_E -361.306 0.0440623
MUST2_T4_CsI7_E -332.709 0.0405858
MUST2_T4_CsI8_E -317.569 0.03871
MUST2_T4_CsI9_E -441.852 0.0538625
MUST2_T4_CsI10_E -396.533 0.0483559
MUST2_T4_CsI11_E -370.464 0.0452019
MUST2_T4_CsI12_E -386.657 0.0471578
MUST2_T4_CsI13_E -320.009 0.0390499
MUST2_T4_CsI14_E -375.625 0.0458199
MUST2_T4_CsI15_E -423.558 0.0516807
MUST2_T4_CsI16_E -393.189 0.0479347
|
Attachment 6: Cal_CsI_E_MM5.cal
|
MUST2_T5_CsI1_E -387.732 0.0472463
MUST2_T5_CsI2_E -373.018 0.0454952
MUST2_T5_CsI3_E -469.892 0.0573254
MUST2_T5_CsI4_E -404.644 0.0493125
MUST2_T5_CsI5_E -361.705 0.0440708
MUST2_T5_CsI6_E -232.821 0.0284066
MUST2_T5_CsI7_E -272.427 0.0331412
MUST2_T5_CsI8_E -271.507 0.0330741
MUST2_T5_CsI9_E 0 -1000.0
MUST2_T5_CsI10_E -396.211 0.048246
MUST2_T5_CsI11_E -399.039 0.0486078
MUST2_T5_CsI12_E -333.308 0.0406365
MUST2_T5_CsI13_E -306.32 0.0374199
MUST2_T5_CsI14_E -430.116 0.0525099
MUST2_T5_CsI15_E -394.692 0.04816
MUST2_T5_CsI16_E -363.795 0.0443958
|
Fixed | e744 |
Fri May 25 17:51:45 2018 |
e744 Iulan Valérie | RUN | General | CH2 | Run 1008 starting runs with 14N |
BAD RUN FOR 14N
Run 1008 BAD RUN 0 Events
14N beam rate high intensity ~ 0.1 nA
CH2 n°6
All triggers ON
MM1 to MM5 ; cats div
EXL PPT and LISE
NB: at the beginning there was no HV on EXL then put ON.
No beam at the end of the run.
NB: The power is around 1 kW on machine production target. |
Attachment 1: BTdssdMust2_25May18.png
|
|
Attachment 2: HTdssdMust2_25May.png
|
|
Attachment 3: HV_EXL_25May.png
|
|
Fixed | e744 |
Fri May 25 18:15:41 2018 |
Pierre | MUST2 | General | CD2 | new dEE PID using Shumpei calibration |
|
Attachment 1: PID_dEE_newCsIcalib.png
|
|
Fixed | e744 |
Fri May 25 21:34:19 2018 |
e744 Iulan, Fairouz, Valerie | DAQ | Hardware | CH2 | Problem of FAG validation +change of ADC parameter for TAC signal |
The Time signal MM_PPT is now in the parameter MCP_HF of the ADC.
The problem was on the FAG signal validation (bad output of the discriminator)
the TAC MM_PPT with start FAG and STOP ppt is now coded in the entry of ADC MCP_HF , add=9 (channel 10)
Previously it was add =3 (channel 4).
Problem of DAQ encountered in the evening (20 pm) no DAQ counting, no FAG from GMT: we first reboot on software (Terminal iolan: iolan must2 all; reboot).
but the DAQ was still blocked.
We phoned to the hardware astreinte (Charles H), he told us to reset the hardware.
The problem was solved by resetting the crates (reset button on the crates ganlx1 and ganlx14 in D6).
The DAQ restarted correctly. |
Attachment 1: ProblemGMTtriggerVXI.png
|
|