MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 27 of 48  Not logged in MUST2
Status ExpNbr Date Authordown Type Category Target-Source Subject Text Attachments
Fixede748 Wed Jul 5 10:58:54 2017 Valérie LRUNGeneralCD2Run summary 327, 328run daq E748  (3h30 for 1Go)
-r--r--r-- 1 e748 Exxx  100M  5 juil. 10:14
run_0327.dat.05-07-17_09h55m11s
 Run328Scaler.pngCheckParamBytesEvtNumexoRun328.png 
Fixede748 Thu Jul 6 08:22:08 2017 Valérie LRUNGeneralCD2Problem of DAQ and networks problemsAfter the problem on Run control and the offline
of MUST2, the DAQ on numexo could not be
started again.
 ProblèmeDAQ6juillet8h.pngProblemGUIRuncontrolNumExo.pngRebootsoftCrateAGAVApassword.pngProblemDAQ5juilletNumExo.png 
Fixede748 Thu Jul 6 09:54:53 2017 Valérie LRUNGeneralCD2Run control OK -Runs 339 and 340After the reboot soft of the AGAVA NUMEXO
and realignment of the TGS (time stamp Agava)
the situation is stabilized.
 CorrelBidimChioandplotCatsRun340.pngRun339scalers.pngScalersAnalyserRun340.png 
Fixede748 Thu Jul 6 10:35:50 2017 Valérie LMUST2GeneralCD2Sili-1/T5 tripThe Sili1 of T5 has tripped (again) at 10h30.
On again. 400V; I ~ 20µA at 10h40, still
increasing 25.6µA at 11h30.(The limit Io
  
Fixede748 Thu Jul 6 11:41:20 2017 Valérie LDAQGeneralN/AMEMO START/STOP + AGAVA configuration in DASSTART/STOP of the DAQ
---------------------------------------------------------------------
START acquisition e748chio  (DAQ Numexo;
 AfterRebootAgavaRegStatusOx80entréeAfterAlignt.pngDasVMEChioCheckSamplesNumber.pngRunControl748On.pngRunControlNarvalE748chioON.pngParameterListWatcherOnRCe748chio.png 
Fixede748 Thu Jul 6 13:37:22 2017 Valérie LRUNGeneralCD2Run 341Run 341 START AT 13h37 STOP AT 15h21 (beam
stop see the ELOG entry Id=239)
At the beginning (cf scalers below) the beam
 ScalersRun341Beginning.pngScalersRun341At14h35.png 
Fixede748 Thu Jul 6 17:05:51 2017 Valérie LRUNGeneralCD2run 342 +overview of TACBeam recovered after shut down due to the
vacuum problem (power supply on the vacuum
system was off). Beam was off during 1h30.
 ScalersRun342at17h10.pngCorrelDatTrigGatconfRun342.pngCorrelTpulserChiorun342.pngRun342_Tcats12.pngRun342_TACcats1.png 
Fixede755 Mon Jun 25 02:34:30 2018 Valérie +Target: TakeshiRUNGeneralCryo-LH2RUN 113Run 113 25th June start @ 2h34 stop @ 3h57
e748 Exxx 3957925525 25 juin  03:57 /data/e748X/e755/acquisition/run/run_0113.dat.25-06-18_02h34m10s
  
 11x 
Fixede755 Mon Jun 25 03:58:22 2018 Valérie +Target: TakeshiRUNGeneralCryo-LH2RUN 114Run 114 25th June start @ 3h57 stop @5h34

 e748 Exxx 4015552641 25 juin  05:34 /data/e748X/e755/acquisition/run/run_0114.dat.25-06-18_03h57m34s
 9x 
Fixede755 Mon Jun 25 05:34:53 2018 Valérie +Target: TakeshiRUNGeneralCryo-LH2RUNS 115, 115.1 and 116Run 115 25th June start @ 5h34 stop@6h57
 e748 Exxx 4190541701 25 juin  06:57 /data/e748X/e755/acquisition/run/run_0115.dat.25-06-18_05h34m33s
  -------------------------------------------------------------------------------
 Run115ScalersAt5h37.pngRun115ScalersAt6h39.pngRun115b1_scalersAt7h20.pngRun115b1BeamProfile.pngRun116_ScalersAt8h26.png 
Fixede755 Mon Jun 25 00:13:48 2018 Valérie +Lise team: Jean-Charles+Target: TakeshiRUNGeneralCryo-LH2RUN 111Run 111  25th June start @ 0h stop @1h13

e748 Exxx 3590054877 25 juin  01:14 /data/e748X/e755/acquisition/run/run_0111.dat.24-06-18_23h59m52s
 16x 
Fixede755 Mon Jun 25 01:17:47 2018 Valérie +Lise team: Jean-Charles+Target: TakeshiRUNGeneralCryo-LH2RUN 112Run 112 25th June start @ 1h14 stop @ 2h34
e748 Exxx 3769078581 25 juin  02:34 /data/e748X/e755/acquisition/run/run_0112.dat.25-06-18_01h14m03s
 Target seems to be still ok and filled!
 6x 
Fixede744 Tue May 29 19:03:38 2018 Valérie (edit)RUNGeneralCH2Run #2112 BEAM BACKrun #2112
Beam back given by the machine. 
Beam+ Lise team: Omar K and Pierre Delahaye,
 14x 
Fixede744 Tue May 22 19:40:48 2018 Valérie MUST2GeneralN/Asnapshots for steps in Calimero calibration   11x 
Fixede744 Tue May 22 11:37:50 2018 ValérieMUST2SoftwareN/Acalimero config GECO 
Calimero T1-T4 strips X
Time Calibrator 640 ns ; period 20 ns
 PlotTel1strxT101calimOk.pngPlotXTel1tXT88Probmate.pngPlotXTel1to4XTProbmate.pngPlotXTel1to4XTcalimero.png 
Fixede744 Tue May 22 11:59:06 2018 ValérieMUST2SoftwareN/A Calimero config GECO   8x 
Fixede744 Wed May 23 10:52:28 2018 ValérieEXL-PPTGeneralN/ARUN #405, EXL PPT triggerRUN #405
start exl ppt run for checking coincidence
 
 GMTtriggerRun405.pngScalersRun405.pngEXL_E1to16duringRun405.pngEXL_T1to16duringRun405.png 
Fixede744 Tue May 29 21:41:55 2018 ValérieRUNGeneralCH2Run #2113[B]RUN #2113 start @ 21h37; stop 0h14 @ [/B]

 target n°4. CH2 104 µm
 9x 
Fixede738 Sun Jul 8 14:23:43 2018 ValérieRUNGeneralCryo-LH2RUN Summary and MUST2, DAQ conditionsMUST2 
Physical thresholds ~ 400 keV see DASmust2T4Thres400keV.png
 12x 
Fixede748 Tue Jun 6 18:17:03 2017 Valérian et FrançoisEXLHardware Hardware coupling of EXL with MUST2EXL seems to fit with Adrien's setup. 
We still have to test if it fits inside the
chamber.
 EXL_MUST2_top.jpgEXL_MUST2_side.jpg 

ELOG Home Page