e748
Wed Jul 5 10:58:54 2017
Valérie L
RUN
General
CD2
Run summary 327, 328
run daq E748 (3h30 for 1Go)
-r--r--r-- 1 e748 Exxx 100M 5 juil. 10:14
run_0327.dat.05-07-17_09h55m11s
Fixed
e748
Thu Jul 6 08:22:08 2017
Valérie L
RUN
General
CD2
Problem of DAQ and networks problems
After the problem on Run control and the offline
of MUST2, the DAQ on numexo could not be
started again.
Fixed
e748
Thu Jul 6 09:54:53 2017
Valérie L
RUN
General
CD2
Run control OK -Runs 339 and 340
After the reboot soft of the AGAVA NUMEXO
and realignment of the TGS (time stamp Agava)
the situation is stabilized.
Fixed
e748
Thu Jul 6 10:35:50 2017
Valérie L
MUST2
General
CD2
Sili-1/T5 trip
The Sili1 of T5 has tripped (again) at 10h30.
On again. 400V; I ~ 20µA at 10h40, still
increasing 25.6µA at 11h30.(The limit Io
Fixed
e748
Thu Jul 6 11:41:20 2017
Valérie L
DAQ
General
N/A
MEMO START/STOP + AGAVA configuration in DAS
START/STOP of the DAQ
---------------------------------------------------------------------
START acquisition e748chio (DAQ Numexo;
Fixed
e748
Thu Jul 6 13:37:22 2017
Valérie L
RUN
General
CD2
Run 341
Run 341 START AT 13h37 STOP AT 15h21 (beam
stop see the ELOG entry Id=239)
At the beginning (cf scalers below) the beam
Fixed
e748
Thu Jul 6 17:05:51 2017
Valérie L
RUN
General
CD2
run 342 +overview of TAC
Beam recovered after shut down due to the
vacuum problem (power supply on the vacuum
system was off). Beam was off during 1h30.
Fixed
e755
Mon Jun 25 02:34:30 2018
Valérie +Target: Takeshi
RUN
General
Cryo-LH2
RUN 113
Run 113 25th June start @ 2h34 stop @ 3h57
e748 Exxx 3957925525 25 juin 03:57 /data/e748X/e755/acquisition/run/run_0113.dat.25-06-18_02h34m10s
11x
Fixed
e755
Mon Jun 25 03:58:22 2018
Valérie +Target: Takeshi
RUN
General
Cryo-LH2
RUN 114
Run 114 25th June start @ 3h57 stop @5h34
e748 Exxx 4015552641 25 juin 05:34 /data/e748X/e755/acquisition/run/run_0114.dat.25-06-18_03h57m34s
9x
Fixed
e755
Mon Jun 25 05:34:53 2018
Valérie +Target: Takeshi
RUN
General
Cryo-LH2
RUNS 115, 115.1 and 116
Run 115 25th June start @ 5h34 stop@6h57
e748 Exxx 4190541701 25 juin 06:57 /data/e748X/e755/acquisition/run/run_0115.dat.25-06-18_05h34m33s
-------------------------------------------------------------------------------
Fixed
e755
Mon Jun 25 00:13:48 2018
Valérie +Lise team: Jean-Charles+Target: Takeshi
RUN
General
Cryo-LH2
RUN 111
Run 111 25th June start @ 0h stop @1h13
e748 Exxx 3590054877 25 juin 01:14 /data/e748X/e755/acquisition/run/run_0111.dat.24-06-18_23h59m52s
16x
Fixed
e755
Mon Jun 25 01:17:47 2018
Valérie +Lise team: Jean-Charles+Target: Takeshi
RUN
General
Cryo-LH2
RUN 112
Run 112 25th June start @ 1h14 stop @ 2h34
e748 Exxx 3769078581 25 juin 02:34 /data/e748X/e755/acquisition/run/run_0112.dat.25-06-18_01h14m03s
Target seems to be still ok and filled!
6x
Fixed
e744
Tue May 29 19:03:38 2018
Valérie (edit)
RUN
General
CH2
Run #2112 BEAM BACK
run #2112
Beam back given by the machine.
Beam+ Lise team: Omar K and Pierre Delahaye,
14x
Fixed
e744
Tue May 22 19:40:48 2018
Valérie
MUST2
General
N/A
snapshots for steps in Calimero calibration
11x
Fixed
e744
Tue May 22 11:37:50 2018
Valérie
MUST2
Software
N/A
calimero config GECO
Calimero T1-T4 strips X
Time Calibrator 640 ns ; period 20 ns
Fixed
e744
Tue May 22 11:59:06 2018
Valérie
MUST2
Software
N/A
Calimero config GECO
8x
Fixed
e744
Wed May 23 10:52:28 2018
Valérie
EXL-PPT
General
N/A
RUN #405, EXL PPT trigger
RUN #405
start exl ppt run for checking coincidence
Fixed
e744
Tue May 29 21:41:55 2018
Valérie
RUN
General
CH2
Run #2113
[B]RUN #2113 start @ 21h37; stop 0h14 @ [/B]
target n°4. CH2 104 µm
9x
Fixed
e738
Sun Jul 8 14:23:43 2018
Valérie
RUN
General
Cryo-LH2
RUN Summary and MUST2, DAQ conditions
MUST2
Physical thresholds ~ 400 keV see DASmust2T4Thres400keV.png
12x
Fixed
e748
Tue Jun 6 18:17:03 2017
Valérian et François
EXL
Hardware
Hardware coupling of EXL with MUST2
EXL seems to fit with Adrien's setup.
We still have to test if it fits inside the
chamber.