MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 27 of 48  Not logged in MUST2
Status ExpNbr Date Authordown Type Category Target-Source Subject
Fixede748 Wed Jul 5 10:58:54 2017 Valérie LRUNGeneralCD2Run summary 327, 328
run daq E748 (3h30 for 1Go)
-r--r--r-- 1 e748 Exxx 100M 5 juil. 10:14 run_0327.dat.05-07-17_09h55m11s
-rw-r--r-- 1 e748 Exxx 212M 5 juil. 10:55 run_0328.dat.05-07-17_10h14m56s


run chio
-r--r--r-- 1 e748chio Exxx 1217525 5 juil. 10:14 run_0327.dat.05-07-17_09h55m08s
-rw-r--r-- 1 e748chio Exxx 2604161 5 juil. 10:56 run_0328.dat.05-07-17_10h15m09s


Check the flux (very low now that the FAG window conditions are applied) by looking at the byte parameter in the "PAramter List"
on the watcher in the Chio Numexo Run control window. See plot below.
Fixede748 Thu Jul 6 08:22:08 2017 Valérie LRUNGeneralCD2Problem of DAQ and networks problems
After the problem on Run control and the offline of MUST2, the DAQ on numexo could not be started again.
see error messages below.
The soft "astreinte" was called at 8h20 and also the one of G2I at 8h30 for network problems.
The G2I was on responding machine.
A series of junk runs was done after a series of init on both Run controls.
We asked to the hardware to reboot the AGAVA crtae from the Terminal.
Problem: we need to know the password - the software "astreinte" has it.
--------------------------------------------------------------------------------------
Junk runs during the tests of the restart of the DAQ
General DAQ
-rw-r--r-- 1 e748 Exxx 2,0M 6 juil. 08:04 run_0332.dat.06-07-17_07h56m55s
-r--r--r-- 1 e748 Exxx 1,4M 6 juil. 08:16 run_0333.dat.06-07-17_08h15m05s
-r--r--r-- 1 e748 Exxx 1,1M 6 juil. 08:20 run_0334.dat.06-07-17_08h18m59s
-r--r--r-- 1 e748 Exxx 2,0M 6 juil. 08:40 run_0335.dat.06-07-17_08h38m27s
-r--r--r-- 1 e748 Exxx 832K 6 juil. 09:10 run_0336.dat.06-07-17_09h08m47s
-r--r--r-- 1 e748 Exxx 1,3M 6 juil. 09:16 run_0337.dat.06-07-17_09h15m06s
-r--r--r-- 1 e748 Exxx 9,2M 6 juil. 09:26 run_0338.dat.06-07-17_09h24m30s

DAQ chio
-r--r--r-- 1 e748chio Exxx 16K 6 juil. 08:04 run_0332.dat.06-07-17_07h57m06s
-r--r--r-- 1 e748chio Exxx 1,9K 6 juil. 08:15 run_0333.dat.06-07-17_08h15m16s
-r--r--r-- 1 e748chio Exxx 4,1K 6 juil. 08:20 run_0334.dat.06-07-17_08h18m33s

--------------------------------------------------------------------------------------
Fixede748 Thu Jul 6 09:54:53 2017 Valérie LRUNGeneralCD2Run control OK -Runs 339 and 340
After the reboot soft of the AGAVA NUMEXO and realignment of the TGS (time stamp Agava) the situation is stabilized.
The "astreintes" for hardware (Gilles W) and software (Clotilde M) have rebooted from the Terminal the crates (AGAVA).
Antoine Lemasson has reloaded the setup of the GTS.
Charles Houarner and Antoine have checked the configuration for the VME AGAVA
cf the ELOG entry Id=233 indicating the procedure for the correct configuration of Agava before restarting.
https://elog.lpc-caen.in2p3.fr/MUST2/233 ]
Now the run control is starting correctly for Numexo.
The correlation plots are checked cf plots below for Chio and Cats.
There were DAQ problems between 7h20 and 9h30. It took ~ 2h to test the restart/init, then after calling the astreintes (at 8h30) it took nearly 1 hour to solve the problem (reboot+ settings of the crates and DAQ. The data runs restarted at 9h32 with run 339.

===========================================================================================
General DAQ e748 /data/e748X/e748/acquisition/run
Run 339 6 JULY start 9h32 STOP 9h43
-r--r--r-- 1 e748 Exxx 65M 6 juil. 09:43 run_0339.dat.06-07-17_09h32m52s

DAQ chio e748 chio /data/e748chioX/e748chio/acquisition/run
-r--r--r-- 1 e748chio Exxx 757K 6 juil. 09:43 run_0339.dat.06-07-17_09h32m40s
===========================================================================================
General DAQ e748
Run 340 6 JULY start 9h47 STOP ...
-rw-r--r-- 1 e748 Exxx 506M 6 juil. 11:07 run_0340.dat.06-07-17_09h47m43s

DAQ chio e748 chio
-rw-r--r-- 1 e748chio Exxx 6,2M 6 juil. 11:12 run_0340.dat.06-07-17_09h47m33s
===========================================================================================
Fixede748 Thu Jul 6 10:35:50 2017 Valérie LMUST2GeneralCD2Sili-1/T5 trip
The Sili1 of T5 has tripped (again) at 10h30.
On again. 400V; I ~ 20ľA at 10h40, still increasing 25.6ľA at 11h30.(The limit Io is set at 26ľA)
To regulate this detector the Vo set is put at 380V instead of 400V. Now I ~ 24.4ľA.
We wil check that the current is stabilized below 24ľA, and after the V will be set again at 400V.
Fixede748 Thu Jul 6 11:41:20 2017 Valérie LDAQGeneralN/AMEMO START/STOP + AGAVA configuration in DAS
START/STOP of the DAQ
---------------------------------------------------------------------
START acquisition e748chio (DAQ Numexo; in the Run Control display on ganp976)
START acquisition e748 (in the Run Control of 748)
....do your quiet RUN (cf NB1). check it is incremented ll -h
--> on DAQ e748 /data/e748X/e748/acquisition/run
--> on DAQ e748chio /data/e748chioX/e748chio/acquisition/run
........
STOP acquisition e748
STOP acquisition e748chio

DATA RYTHM:
During 3h45 (with the beam rate at 45k /s on CATS)
data run size for e748 is 1Go and for e748chio the corresponding run size is 15Mo.

Plots: Narval Run control for E748, RC for e748chio
Parameter checking of buffer in Numexo (-->RUn Control of e748chio --> clock right on Watcher --> Paremeter list -->window refresh and check the incrementation of the buffers)
---------------------------------------------------------------------
[ Cas oů l'acquisition est "tombée en marche" (GAP dixit) il faut procéder ŕ un reset et contrôler ].

Checking of the AGAVA/NUMEXO configuration
In case of a REBOOT of the AGAVA VXI/VME crate (reboot command in the AGAVA terminal for instance), we need:
i) to load again the setup, ii) to check it on the DAS window of the general DAQ.

To load the setup, go and connect to the terminal e748chio (best is to do it directly by going to the computer Numexo, room close to DAQ D6; otherwise do it by remote control)
launch the setup command:
> setupGTS
> configure_gts_numexo2-94.csh

checking on the DAS window
Then go to the DAS of the general experiment e748 and check the status of the VME AGAVA
- Put the DAS ONLINE, the window appears: SOFTWARE / HARDWARE /CANCEL
click on CANCEL if the das sofware was already correctly set (check the MUST2 configuration before going to ONLINE)

1. check the register status, initially we may find it at 0 due to the setup command, it should be written at 0x80 (picture below).
2. the sampling numbers should be correct see first plot, sample number = 120; sample number before stop = 60.

-----------------------------------------------------------------------------------------
run control Numexo is opened by connecting on the numexo machine by:
ssh -X e748chio@ganp976
then start_acq e748chio



NB1: you may check that the header of the run is correct by looking at it with Ganil_Tape:
Terminal
cd /data/e748X/e748/acquisition/run
ll -h
Ganil_Tape run_03***
Fixede748 Thu Jul 6 13:37:22 2017 Valérie LRUNGeneralCD2Run 341
Run 341 START AT 13h37 STOP AT 15h21 (beam stop see the ELOG entry Id=239)
At the beginning (cf scalers below) the beam was at 6ľA (--> CATS at 30kcps/s), the machine needs to recover slowly to go to 7eľA.
(run checked with Ganil_Tape ok)
-r--r--r-- 1 e748 Exxx 433M 6 juil. 15:21 run_0341.dat.06-07-17_13h35m20s

DAQ CHIO
-r--r--r-- 1 e748chio Exxx 4,9M 6 juil. 15:21 run_0341.dat.06-07-17_13h35m04s

===========================================================================================
Fixede748 Thu Jul 6 17:05:51 2017 Valérie LRUNGeneralCD2run 342 +overview of TAC
Beam recovered after shut down due to the vacuum problem (power supply on the vacuum system was off). Beam was off during 1h30.

Run 342 started at 17h04
run DAQ 748 run_0342.dat.06-07-17_17h04m50s
-r--r--r-- 1 e748 Exxx 561M 6 juil. 18:58 run_0342.dat.06-07-17_17h04m50s
DAQ chio
/data/e748chioX/e748chio/acquisition/run
-r--r--r-- 1 e748chio Exxx 254K 6 juil. 19:01 run_0342.dat.06-07-17_17h04m27s

Stopped at 18:59 to close roof windows of the accelerator...
(they were opened today to give some "fresh air" above the machine sector)
Beam is stopped a priori during 1/4 hour.
Fixede755 Mon Jun 25 02:34:30 2018 Valérie +Target: TakeshiRUNGeneralCryo-LH2RUN 113
Run 113 25th June start @ 2h34 stop @ 3h57
e748 Exxx 3957925525 25 juin 03:57 /data/e748X/e755/acquisition/run/run_0113.dat.25-06-18_02h34m10s

--------------------------------------------------------------------------------
Triggers All Must2 Cats 1 and Cats2 DIV= 3.10**4
I ~2.0 10**5 /s FH43 +/- 5mm ; FV 43 +/- 4.1mm ; FH31 = +/-4mm

-------------------------------------------------------------------------------------
Dead time between 20 and 29%
Beam I~ 2.7 10**5 at 2h37 and 2.8 10**5 at 2h39- see scalers
dead time around 25-30% at maximum.
Beam Intensity at 3. 10**5 at 3h30 dead time up to 35%
------------------------------------------------------------------------------


Fixede755 Mon Jun 25 03:58:22 2018 Valérie +Target: TakeshiRUNGeneralCryo-LH2RUN 114
Run 114 25th June start @ 3h57 stop @5h34

e748 Exxx 4015552641 25 juin 05:34 /data/e748X/e755/acquisition/run/run_0114.dat.25-06-18_03h57m34s
--------------------------------------------------------------------------------
Triggers All Must2 Cats 1 and Cats2 DIV= 3.10**4
I ~2.4 10**5 /s FH43 +/- 5mm ; FV 43 +/- 4.1mm ; FH31 = +/-4mm;
FH62 +/-15 mm; FV62 +11 mm

-------------------------------------------------------------------------------------
Dead time between 20 and 25%
Beam I~ 2.4 10**5 down to 2.2 10**5 at 4h01- see scalers
down to 3. 10**4 at 4h55 then up to 2.3 10**5 at 5h07; 1.6 10**5 at 5h30


------------------------------------------------------------------------------


Fixede755 Mon Jun 25 05:34:53 2018 Valérie +Target: TakeshiRUNGeneralCryo-LH2RUNS 115, 115.1 and 116
Run 115 25th June start @ 5h34 stop@6h57
e748 Exxx 4190541701 25 juin 06:57 /data/e748X/e755/acquisition/run/run_0115.dat.25-06-18_05h34m33s
-------------------------------------------------------------------------------
Run 115.1 25th June start @ 6h57 stop@ 8h15
r--r--r-- 1 e748 Exxx 4003567657 25 juin 08:15 /data/e748X/e755/acquisition/run/run_0115.dat.25-06-18_05h34m33s.1

--------------------------------------------------------------------------------
Run 116 25th June start @ 8h15 stop@ 10h53
-rw-r--r-- 1 e748 Exxx 95322557 25 juin 2018 /data/e748X/e755/acquisition/run/run_0116.dat.25-06-18_08h14m39s
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Triggers All Must2 Cats 1 and Cats2 DIV= 3.10**4
I ~2.4 10**5 /s FH43 +/- 5mm ; FV 43 +/- 4.1mm ; FH31 = +/-4mm;
FH62 +/-15 mm; FV62 +11 mm

-------------------------------------------------------------------------------------
Dead time between 17 to 26% for I between 1.5 and 1.7 10**5/s on CATS1 and 2
Beam I~ 1.6 10**5 at 5h37
Beam I~ 2.7 10**5 at 6h39 ;dead time ~ 16 to 30%.

Stopped cause noticed that there was no CAVIAR anymore

------------------------------------------------------------------------------


Fixede755 Mon Jun 25 00:13:48 2018 Valérie +Lise team: Jean-Charles+Target: TakeshiRUNGeneralCryo-LH2RUN 111
Run 111 25th June start @ 0h stop @1h13

e748 Exxx 3590054877 25 juin 01:14 /data/e748X/e755/acquisition/run/run_0111.dat.24-06-18_23h59m52s

--------------------------------------------------------------------------------
Triggers All Must2 Cats 1 and Cats2 DIV= 3.10**4
I ~2.0 10**5 /s FH43 +/- 5mm ; FV 43 +/- 4.1mm ; FH31 = +/-4mm
D33G D31 RMN = 8310.81 G
BRMN= 8311 G <--> Brho = 2.1614 T.m
Wien Filter +2 kV
-------------------------------------------------------------------------------------
Dead time between 15 and 27%


Fixede755 Mon Jun 25 01:17:47 2018 Valérie +Lise team: Jean-Charles+Target: TakeshiRUNGeneralCryo-LH2RUN 112
Run 112 25th June start @ 1h14 stop @ 2h34
e748 Exxx 3769078581 25 juin 02:34 /data/e748X/e755/acquisition/run/run_0112.dat.25-06-18_01h14m03s
Target seems to be still ok and filled! see CATS plot on target
--------------------------------------------------------------------------------
Triggers All Must2 Cats 1 and Cats2 DIV= 3.10**4
I ~2.0 10**5 /s FH43 +/- 5mm ; FV 43 +/- 4.1mm ; FH31 = +/-4mm
D33G D31 RMN = 8310.81 G
BRMN= 8311 G <--> Brho = 2.1614 T.m
Wien Filter +2 kV
-------------------------------------------------------------------------------------
Dead time between 15 and 27%
Beam fluctuations, I down at 1.2 1°**5 at 1h35, then increasing at 2.4 10**5 at 1h40 and 3. 10**5 at 1h42 - see scalers at 1h41 and at1h43.
dead time around 25-30% at maximum.

We noticed that caviar was at 0 during the first part of run 112 (due to a cable removed on the LISE electronics).See scalers: Run112ScalersAt1h19.png
The cable was correctely connected again and now it is ok. See scalers Run112ScalersAt2h08.png
Fixede744 Tue May 29 19:03:38 2018 Valérie (edit)RUNGeneralCH2Run #2112 BEAM BACK
run #2112
Beam back given by the machine.
Beam+ Lise team: Omar K and Pierre Delahaye, Jean-Charles T.
Evening shift team : Valérian, François, Iulan, Valérie
start @ 20h00
stop @ 21h35
Beam intensity from 8. 10**4 pps to around 10**5 pps
target n°4. CH2 104 ľm
All triggers, (no LISE)
Divisions CATS1 3. 10**4. PPT 3000 ; EXL 10**4
cf current of T4 to be checked regularly. At present with the beam the current is around 10.5 ľA (fluctuates between 9 and 11 ľA) for HV set at 60 V.
Beam rate is reduced at the end of the run, around 4000-5000 pps.
The machine operators are trying to recover the initial rate.
Next run (2113) will be started in the low rate conditions.
Fixede744 Tue May 22 19:40:48 2018 Valérie MUST2GeneralN/Asnapshots for steps in Calimero calibration
Fixede744 Tue May 22 11:37:50 2018 ValérieMUST2SoftwareN/Acalimero config GECO

Calimero T1-T4 strips X
Time Calibrator 640 ns ; period 20 ns
Fixede744 Tue May 22 11:59:06 2018 ValérieMUST2SoftwareN/A Calimero config GECO
Fixede744 Wed May 23 10:52:28 2018 ValérieEXL-PPTGeneralN/ARUN #405, EXL PPT trigger
RUN #405
start exl ppt run for checking coincidence
Fixede744 Tue May 29 21:41:55 2018 ValérieRUNGeneralCH2Run #2113
RUN #2113 start @ 21h37; stop 0h14 @
target n°4. CH2 104 ľm
All triggers, (no LISE)
Divisions CATS1 3. 10**4. PPT 3000 ; EXL 10**4

Evening shift team: Valérian (offline); Valérie (Online).
with Olivier, Jean-Eric and Marlete.

Between 21h37 and 22h. Beam intensity from 4000 pps increasing around 7. 10**4 pps then down to 800 pps, fluctuating fastly.
Machine operators are trying to compensate the fluctuations.

cf current of T4 around 9.4 ľA (fluctuates between 9 and 10 ľA) for HV set at 60 V. Strong increase around 13 ľA during a few minutes.
cf HV_MUST2run2113_29Mayat21h50.png
Between 23h10 and 23h20 the beam rate was evolving from 80-88k to 90-100 k and the current was fluctuating in T4 from 8.8 to 9.9 ľA.
Beam rate is reduced at the beginning of the run, around 4000-5000 pps. See Scalers_Run2113initAt21h39.png
Then around 60k pps at 21h46; at 77k pps at 21h52, at 98k pps at 22h06 but very unstable and then down to 30kcps.
Around 110k pps at 22h35. cf ScalersRun2113_110kAt22h35.png
Stabilization around 88k and 100k pps between 22h50 and 23h05 (hoping we will have the beam rate around these values during the night)
------------------------------------------------------------------------------------------------------------------------------------------
CHECKING THE MISSING STRIPS X and Y IN THE TELESCOPES:

XE || MM1: X44 || MM2: X3, X4, X5, X6, X31 || MM3: all X OK || MM4: X8, X9, X45, X128 || MM5: XE all OK

YE || MM1: Y25, Y123, Y124 || MM2: Y100, Y128 || MM3: all Y OK || MM4: Y29, Y62, Y123, Y126 || MM5: Y15, Y39, Y98
------------------------------------------------------------------------------------------------------------------------------------------
Fixede738 Sun Jul 8 14:23:43 2018 ValérieRUNGeneralCryo-LH2RUN Summary and MUST2, DAQ conditions
MUST2
Physical thresholds ~ 400 keV see DASmust2T4Thres400keV.png
Pedestals see snapshots DASmust2T1pedestalsThr.png ;
for Telescope with siLi T7 and T8 DASmust2T8SiLipedestalsThr.png
Run directory /data/e748X/e755/acquisition/run/
7th and 8th July
- GMT triggers
Conditions for HV below (see snapshots)

---------------------------------------------------------------------------------------
-r--r--r-- 1 e748 Exxx 77M 7 juil. 08:27 run_0270.dat.07-07-18_08h24m32s
-r--r--r-- 1 e748 Exxx 1,6M 7 juil. 08:41 run_0271.dat.07-07-18_08h36m25s
-r--r--r-- 1 e748 Exxx 500M 7 juil. 19:43 run_0272.dat.07-07-18_08h40m30s
-r--r--r-- 1 e748 Exxx 463M 7 juil. 20:34 run_0273.dat.07-07-18_20h28m28s
-r--r--r-- 1 e748 Exxx 28M 7 juil. 20:56 run_0274.dat.07-07-18_20h34m01s
-r--r--r-- 1 e748 Exxx 861M 7 juil. 21:08 run_0275.dat.07-07-18_20h55m55s
-r--r--r-- 1 e748 Exxx 31M 7 juil. 21:34 run_0276.dat.07-07-18_21h07m28s
-r--r--r-- 1 e748 Exxx 1,8G 7 juil. 21:57 run_0277.dat.07-07-18_21h33m11s
-r--r--r-- 1 e748 Exxx 1,5G 7 juil. 22:18 run_0278.dat.07-07-18_21h57m47s
-r--r--r-- 1 e748 Exxx 47M 7 juil. 22:23 run_0279.dat.07-07-18_22h18m03s
-r--r--r-- 1 e748 Exxx 1,7G 7 juil. 23:50 run_0280.dat.07-07-18_23h12m33s
-r--r--r-- 1 e748 Exxx 51M 8 juil. 00:11 run_0281.dat.07-07-18_23h56m51s
-r--r--r-- 1 e748 Exxx 102M 8 juil. 00:53 run_0282.dat.08-07-18_00h23m55s
-r--r--r-- 1 e748 Exxx 153M 8 juil. 01:07 run_0283.dat.08-07-18_00h52m54s
-r--r--r-- 1 e748 Exxx 2,9G 8 juil. 03:11 run_0284.dat.08-07-18_01h06m43s
-r--r--r-- 1 e748 Exxx 2,7G 8 juil. 05:10 run_0285.dat.08-07-18_03h10m48s
-r--r--r-- 1 e748 Exxx 2,9G 8 juil. 07:00 run_0286.dat.08-07-18_05h09m33s
-r--r--r-- 1 e748 Exxx 3,1G 8 juil. 08:55 run_0287.dat.08-07-18_06h59m42s
-r--r--r-- 1 e748 Exxx 3,2G 8 juil. 10:56 run_0288.dat.08-07-18_08h55m20s
-r--r--r-- 1 e748 Exxx 3,0G 8 juil. 12:52 run_0289.dat.08-07-18_10h56m21s
-r--r--r-- 1 e748 Exxx 409M 8 juil. 13:36 run_0290.dat.08-07-18_13h18m13s

run_0291.dat.08-07-18_13h47m40s

-------------------------------------------------------------------------------------
Fixede748 Tue Jun 6 18:17:03 2017 Valérian et FrançoisEXLHardware Hardware coupling of EXL with MUST2
EXL seems to fit with Adrien's setup.
We still have to test if it fits inside the chamber.

ELOG Home Page