Fixed, e744, Wed May 16 20:26:48 2018, Iulian Valerian, MUST2, Software, N/A, run #319 calimero T1-T4 Y strips
|
[U][B]run #319[/B][/U]
calimero T1-T4 Y strips |
Fixed, e744, Wed May 16 20:36:40 2018, Iulian Valerian, MUST2, Software, N/A, run #320 Calimero T5 X
|
[U][B]run #320[/B][/U]
Calimero T5 X |
Fixed, e744, Wed May 16 20:42:43 2018, Iulian Valerian, MUST2, Software, N/A, Run #321 Calimero T5 Y strips
|
[U][B]Run #321[/B][/U]
Calimero T5 Y strips |
Ongoing, e744, Wed May 16 21:27:55 2018, Iulian Valerian, MUST2, Software, N/A, Run #322 Calimero T1-T4 X strips
|
Run #322
Calimero T1-T4 X strips
1 channel per mate not done (Valerian too slow to cable start stop ;) ) |
Ongoing, e744, Wed May 16 21:45:47 2018, iulian, MUST2, Software, N/A, Run #323 Calimero T1-T4 strips X
|
[U][B] Run #323[/B][/U]
Calimero T1-T4 strips X |
Ongoing, e744, Wed May 16 22:03:13 2018, iulian, EXL-PPT, Software, 60Co, run #324 60Co 
|
[U][B]run #324[/B][/U]
60Co
|
Pinned, e744, Thu May 17 12:04:45 2018, iulian, EXL-PPT, Hardware, 60Co, EXL delay of ADC Codding window
|
EXL timing delays for Mesitech module 2 & 1
Module 1
|
Ongoing, e744, Thu May 17 18:29:16 2018, iulian, MUST2, General, 3-alpha, Run #333 Last alfa run before experiment
|
Run #333
3a source
T1-T5 trigger
|
Ongoing, e744, Thu May 17 19:15:21 2018, Iulian , EXL-PPT, General, 60Co, Run #334 Last 60 co run for eficacity before experiment
|
[U][B]Run #334[/B][/U]
start 19h15 |
Fixed, e744, Fri May 18 10:47:37 2018, Ruxandra, EXL-PPT, Hardware, 60Co, Co60 caliibration
|
Thu May 17 . run 339
60Co calibration
start @19h26 17/05/18
|
Fixed, e744, Fri May 18 13:28:24 2018, Ruxandra, EXL-PPT, Software, 60Co, new calibration
|
The new calibration coefficients for the PPT detector (run 339): E=0.526*ch+32.57 |
Fixed, , Fri May 18 15:17:19 2018, Megumi and Louis, OTHER, Hardware, , TAC range setting and time calibration
|
1 mm-cats 1us
2 mm-hf 200ns
3 mm-exl 1us
|
Fixed, e744, Fri May 18 17:38:21 2018, Francois and Pedja, OTHER, Hardware, , translator nim to ecl
|
There was a problem with the scalers, not all of them were working. After several tests, we changed the electronic module, from Lecroy ECl-NIM-ECL to module
LPC translator NIM-ECL. We checked all channels, they work. For a while channel N°4 was not working. We changed the nim cable, it works now. |
Ongoing, e744, Sat May 19 15:32:51 2018, Iulian Valerian, EXL-PPT, General, N/A, Started run #346 Room background PPT EXL
|
[U][B]run #346[/B][/U]
Room background PPT EXL
|
Fixed, e744, Sun May 20 18:53:44 2018, iulian Jaromir Cristina, EXL-PPT, General, N/A, Run #347 Background run EXL & PPT triggers  
|
[U][B]Run #347[/B][/U]
Background run EXL & PPT triggers
start @18h53 20/05
|
Ongoing, e744, Sun May 20 19:11:57 2018, ruxandra cristina giuseppe jaromir, EXL-PPT, Hardware, 60Co, EXL-addback and light leak considerations
|
in the middle of the considerations - pdf file
Content:
|
Pinned, e744, Mon May 21 11:26:55 2018, iulian cristina, OTHER, Hardware, N/A, error stop run/ run still going 
|
After stopping run 347, the narval looks like everything was stopped (blue ready), but I still had FAGs, VALs, and the leds on the GMT were blinking. MUVI
was in ready state (leds green - red). |
Fixed, e744, Mon May 21 11:42:16 2018, iulian cristina, MUST2, Software, N/A, run 348 test comunication with Must. Pulser T1 channel 11
|
|
Fixed, e744, Tue May 22 10:44:30 2018, iulian Fairouz Valerie, MUST2, Software, N/A, Run #353 Calimero T1-T4 strips X
|
Started run #353
Calimero T1-T4 strips X
Time Calibrator 320 ns ; period 20 ns |
Fixed, e744, Tue May 22 11:37:50 2018, Valérie, MUST2, Software, N/A, calimero config GECO   
|
Calimero T1-T4 strips X
Time Calibrator 640 ns ; period 20 ns |
|