MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 20 of 48  Not logged in MUST2
Fixed, e744, Wed May 16 20:26:48 2018, Iulian Valerian, MUST2, Software, N/A, run #319 calimero T1-T4 Y strips  Calimerro_run319.png
run #319
calimero T1-T4 Y strips
Fixed, e744, Wed May 16 20:36:40 2018, Iulian Valerian, MUST2, Software, N/A, run #320 Calimero T5 X Calimerro_run320.png
run #320

Calimero T5 X
Fixed, e744, Wed May 16 20:42:43 2018, Iulian Valerian, MUST2, Software, N/A, Run #321 Calimero T5 Y strips  Calimerro_run321.png
Run #321

Calimero T5 Y strips
Ongoing, e744, Wed May 16 21:27:55 2018, Iulian Valerian, MUST2, Software, N/A, Run #322 Calimero T1-T4 X strips Calimerro_run322.png
Run #322
Calimero T1-T4 X strips
1 channel per mate not done (Valerian too slow to cable start stop Wink )
Ongoing, e744, Wed May 16 21:45:47 2018, iulian, MUST2, Software, N/A, Run #323 Calimero T1-T4 strips X Calimerro_run323.png
Run #323
Calimero T1-T4 strips X
Ongoing, e744, Wed May 16 22:03:13 2018, iulian, EXL-PPT, Software, 60Co, run #324 60Co  EXL_run324.pngPPT_run324.png
run #324
60Co

start 22h02 16/05
stop 10h12 17/05
Pinned, e744, Thu May 17 12:04:45 2018, iulian, EXL-PPT, Hardware, 60Co, EXL delay of ADC Codding window  Exl_timing_mesy_1_2.pdf
EXL timing delays for Mesitech module 2 & 1

Module 1
ECL sygnal going to the ADC are delayed by 1.3 us
Trigger output is delayed by 350 ns
EXL input signal has a rise time of 3 us

Module 2
ECL sygnal going to the ADC is delayed by 554 ns
Trigger output is delayed by 350 ns
EXL input signal rise time is 3 us
Ongoing, e744, Thu May 17 18:29:16 2018, iulian, MUST2, General, 3-alpha, Run #333 Last alfa run before experiment Must_spectra_start_run333.png
Run #333
3a source
T1-T5 trigger

start 18h30


ps: If no HT on the detectors but BT on, you will have alfa E&T on X, but not on Y side (except some strips)
Ongoing, e744, Thu May 17 19:15:21 2018, Iulian , EXL-PPT, General, 60Co, Run #334 Last 60 co run for eficacity before experiment 
Run #334

start 19h15
Fixed, e744, Fri May 18 10:47:37 2018, Ruxandra, EXL-PPT, Hardware, 60Co, Co60 caliibration 
Thu May 17 . run 339
60Co calibration
start @19h26 17/05/18
stop @7h39 18/05/18
EXL + PPT trigger
Fixed, e744, Fri May 18 13:28:24 2018, Ruxandra, EXL-PPT, Software, 60Co, new calibration 
The new calibration coefficients for the PPT detector (run 339): E=0.526*ch+32.57
Fixed, , Fri May 18 15:17:19 2018, Megumi and Louis, OTHER, Hardware, , TAC range setting and time calibration 
1 mm-cats 1us
2 mm-hf 200ns
3 mm-exl 1us
4 mm-ppt 1us
5 cats-hf 200ns
6 exl-cats 1us
7 ppt-cats 1us
8 mm-mcp 1us
9 mm-hfv 200ns
10 mcp-hf 200ns

time calibrator setting
period 0.02us
range 1.28us

run340 for test
run341 for calibration of mm-cats start
run343 for calibration of mm-hf
run344 for calibration of mm-exl, mm-ppt, mm-mcp, mm-hf, mcp-hfv

added on 21/05/2018
we found validation point was missing for some channels

run349 for calibraion cats_hf
run350 for calibration ppt_cats
run351 for calibraion cats_hf again
run352 for calibration exl_cats



calibration parameter (in ns)
1 mm-cats 0.0495255
2 mm-hf 0.0102974
3 mm-exl 0.0500575
4 mm-ppt 0.0510095
5 cats-hf 0.010322
6 exl-cats 0.0547923
7 ppt-cats 0.051581
8 mm-mcp 0.0507524
9 mm-hfv 0.0107085
10 mcp-hf 0.01041
Fixed, e744, Fri May 18 17:38:21 2018, Francois and Pedja, OTHER, Hardware, , translator nim to ecl scalers.png
There was a problem with the scalers, not all of them were working. After several tests, we changed the electronic module, from Lecroy ECl-NIM-ECL to module LPC translator NIM-ECL. We checked all channels, they work. For a while channel N°4 was not working. We changed the nim cable, it works now.
Ongoing, e744, Sat May 19 15:32:51 2018, Iulian Valerian, EXL-PPT, General, N/A, Started run #346 Room background PPT EXL 
run #346

Room background PPT EXL

start 15h32 19 Mai
stop 18h52 20 Mai
Fixed, e744, Sun May 20 18:53:44 2018, iulian Jaromir Cristina, EXL-PPT, General, N/A, Run #347 Background run EXL & PPT triggers PPT_run347.pngEXL_T_run347.pngEXL_E_run347.png
Run #347
Background run EXL & PPT triggers
start @18h53 20/05
stop @11h14 21/05
Ongoing, e744, Sun May 20 19:11:57 2018, ruxandra cristina giuseppe jaromir, EXL-PPT, Hardware, 60Co, EXL-addback and light leak considerations EXL.pdf
in the middle of the considerations - pdf file

Content:
Light leak between PM-pair
Zamora theses
Peyre R3B development

Runs 302, 339
There were huge loads, DT not under control, the LaBr and EXL did not coincide.... solved 2018/05/22
Run 347 background - better
Pinned, e744, Mon May 21 11:26:55 2018, iulian cristina, OTHER, Hardware, N/A, error stop run/ run still going error_Narval.pngerror_DAS1.png
After stopping run 347, the narval looks like everything was stopped (blue ready), but I still had FAGs, VALs, and the leds on the GMT were blinking. MUVI was in ready state (leds green - red).
Fixed, e744, Mon May 21 11:42:16 2018, iulian cristina, MUST2, Software, N/A, run 348 test comunication with Must. Pulser T1 channel 11 MUST2_Pulser_T1_E11_run348.png
Fixed, e744, Tue May 22 10:44:30 2018, iulian Fairouz Valerie, MUST2, Software, N/A, Run #353 Calimero T1-T4 strips X 
Started run #353
Calimero T1-T4 strips X
Time Calibrator 320 ns ; period 20 ns
Fixed, e744, Tue May 22 11:37:50 2018, Valérie, MUST2, Software, N/A, calimero config GECO PlotTel1strxT101calimOk.pngPlotXTel1tXT88Probmate.pngPlotXTel1to4XTProbmate.pngPlotXTel1to4XTcalimero.png

Calimero T1-T4 strips X
Time Calibrator 640 ns ; period 20 ns

ELOG Home Page