Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Text |
 |
Pinned | e748 |
Thu Mar 23 11:19:13 2017 |
Adrien Matta | | | | Schedule | This message will contain the update schedule
of the preparation of e748.
|
|
Pinned | General |
Fri Mar 24 09:32:11 2017 |
Adrien Matta | MUST2 | Software | | Usefull document for MUST2 operations | DAS Configuration:
http://wiki.ganil.fr/gap/wiki/Documentation/Software/DAS
|
 |
Fixed | e748 |
Wed May 24 09:07:59 2017 |
Adrien Matta | OTHER | General | | e748 Planning | Feel free to edit this spread sheet.
|
|
Pinned | e748 |
Wed May 24 09:19:57 2017 |
Adrien Matta | OTHER | Social | | e748 Collaborators | List of Collaborators (Please edit if anyone
is missing):
|
|
Fixed | e748 |
Wed May 24 09:32:41 2017 |
Adrien Matta | MUST2 | Hardware | | Mounting of the telescope in G3 | The telescope has been mounted in there stand
in G3.
|
|
Fixed | e748 |
Wed May 24 09:35:00 2017 |
Adrien Matta | CATS | Hardware | | BTD chambers mounting in D6 | Sebastient started mounting the BTD chamber
in D6.
The frame is in place, BTD chambers one and |
|
Fixed | e748 |
Wed May 24 15:48:24 2017 |
Adrien Matta | MUST2 | Hardware | | PCB number for each telescope | [LIST]
[*] T1 PCB 5
[*] T2 PCB 9
|
|
Fixed | e748 |
Thu Jun 1 09:29:50 2017 |
Adrien Matta | MUST2 | Hardware | | Telescope cabling debbug in G3 | Test performed without vaccum, in the dark,
cooling at 20.
|
|
Fixed | e748 |
Thu Jun 1 09:32:38 2017 |
Adrien Matta | MUST2 | Hardware | | MUST2 cabling scheme | The MUST2 cabling scheme has been change so
Telescope 1 to 4 and 5 to 8 are on two independent
set of distribution box and HV Card.
|
|
Fixed | e748 |
Fri Jun 2 12:03:32 2017 |
Adrien, Laurent, Shumpei | MUST2 | Hardware | | M2C vacuum test | We mounted 2 dry pump on the chamber and started
pumping at 11h.
Pressure was about 6e-1 mbar around 11h45.
|
|
Fixed | e748 |
Tue Jun 6 09:07:34 2017 |
Adrien Matta | BEAM | General | | Moving to D6 | M2C Chamber now in D6 after a smooth ride,
ready to be aligned. |
|
Ongoing | e748 |
Tue Jun 6 17:57:07 2017 |
Valérian et François | EXL | Hardware | | Hardware coupling of EXL with MUST2 |
EXL seems to fit in Adrien's setup. We still
have to check if it fits in the chamber. |
|
Fixed | e748 |
Tue Jun 6 18:17:03 2017 |
Valérian et François | EXL | Hardware | | Hardware coupling of EXL with MUST2 | EXL seems to fit with Adrien's setup.
We still have to test if it fits inside the
chamber. |
 |
Fixed | e748 |
Wed Jun 7 11:29:55 2017 |
Adrien | MECH | Hardware | N/A | Surveyor mesurement | The surveyor are carrying out the measurement
of the detectors in D6.
The measurement should take the day, starting |
|
Fixed | e748 |
Wed Jun 7 18:03:02 2017 |
Franck | OTHER | Hardware | | LPC electronics | Caen N568B: 509, 490
Ortec TAC: 1102, 1479, 1480, 1481
Lecroy GDG222: E2557, 01175C, 831
|
|
Fixed | e748 |
Thu Jun 8 18:57:14 2017 |
Valérie Lapoux | MUST2 | Hardware | | Currents and Voltages on MUST2 | Thursday 8th June.
Vacuum in the chamber 9e-05 mbar; MUST2 temperature
at -5°C.
|
|
Fixed | e748 |
Fri Jun 9 12:30:49 2017 |
Adrien | VACUUM | Hardware | | Vacuum Leaks | We reach a stable 1e-5 mbar. We performed
a leak check and identify that the Ionisation
chamber gate valve is not totally tight, |
|
Fixed | e748 |
Fri Jun 9 12:33:25 2017 |
Adrien | MECH | General | | MUST2 position | After a the surveyor came we figured out the
MUST2 telescope are 1cm too high with respect
to the beam line.
|
|
Fixed | e748 |
Fri Jun 9 12:34:18 2017 |
Adrien | DAQ | Hardware | | Hub | We are currentlky waiting for the hub to be
configured so we can start the MUST2 DAQ.
Should be done in the afternoon. |
|
Fixed | e748 |
Fri Jun 9 12:35:46 2017 |
Adrien | MUST2 | Hardware | | CsI trip on T6 | The detector were left on during the night.
T6 CsI trip and cannot be switch on again.
Once we established that all the MUFFEE works |
|