MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 1 of 48  Not logged in MUST2
Pinned, e748, Thu Mar 23 11:19:13 2017, Adrien Matta, , , , Schedule 
This message will contain the update schedule of the preparation of e748.

Beam time: 1st - 9th of July 2017.


CATS Mounting: 29th
Pinned, General, Fri Mar 24 09:32:11 2017, Adrien Matta, MUST2, Software, , Usefull document for MUST2 operations NOTICE_UTILISATION_MUVI_HARD_et_SOFT_(ver_081013).pdfMUVI_card_USER_MANUAL_(ver_081013).pdf
DAS Configuration:
http://wiki.ganil.fr/gap/wiki/Documentation/Software/DAS

Run control:
http://wiki.ganil.fr/gap/wiki/Documentation/Software/RCC

Calimero:
http://wiki.ganil.fr/gap/wiki/Documentation/Gru/Calimero
Pinned, e748, Wed May 24 09:19:57 2017, Adrien Matta, OTHER, Social, , e748 Collaborators 
List of Collaborators (Please edit if anyone is missing):

IPNOrsay: D Beaumel, Y. Blumendfeld, M Assie, N de Sereville, F Flavigny, S Franchoo, A Georgiadiou, J. Guillot, F. Hammache, I. Stefan, P. Asdley, A. Meyer, E. Rindel

CEA Saclay: M. Vandebrouck, V Lapoux,

Surrey: W. Catford, G Lotay, R. Wilkinson, S. Hallam, M. Moukaddam

Universitad des Santiago de Compostela: B. Fernandez-Dominguez

Ganil: JC Thomas, O. Sorlin, O. Kamalou, F. de Olivera, V Alcindor, T Roger, Maurici, A Lemasson, J Piot, Lucia, C Strodel, Beyan, etudiant beyan ?, J. Pancin, V. Morel, L. Menager, Sebastien Herlant, Sebastien ?, Gailor (?) F. Saillant, C. Houarner, G. Fremont

LPC: F. Delaunay, L. Achouri, J. Gibelin, B. Monteaguo, J Lory, Cedric (?), Y. Merrer.

RIKEN/TODAI: D. Susuki, S. Koyama
Pinned, e748, Fri Jun 9 15:49:46 2017, Valérie Lapoux, MUST2, Hardware, , MUST2 configuration Confige748MUST2alimHVandLV.pdfpréparationMUST2forE748.pdf
The MUST2 configurations for telescopes in the chamber and low/High voltage Caen crate are given in the attached file.
Pinned, e748, Fri Jun 9 15:51:44 2017, Valérie Lapoux, MUST2, Hardware, , General Trigger GMT for MUST2 electronics DaqElectronicsMUST2gmtforE748.pdf
The GMT configuration for the trigger inputs and the inputs from MUST2 electronics are given in the file.
Pinned, e748, Tue Jun 13 11:14:23 2017, Valérie Lapoux, MUST2, General, , GMT configuration, FAG GMTconfigOKMust2FAG100ns.pngGMTtrigParamActions.pngGMTparamDASgatconf.png
The Gatconf parameter is now defined in the action file.
The new configuration for GMT (see chronogramme plot) is attached, with the FAG window width set at 100 ns.
Pinned, e748, Thu Jun 15 10:16:03 2017, Valérie Lapoux, MUST2, Hardware, , Electronics for GMT trigger and FAG DaqElectronicsMUST2gmtforE748.pdf
The GMT is used in a mode where we do not make coincidence and decision, GMT entries are single and all accepted as triggers of the DAQ.
The FAG window for the GMT should be set at a low value, typically 100 ns.
Pinned, e748, Thu Jul 6 02:41:13 2017, Freddy and the night shifters, CHIO, General, , CHIO analog treatment 
Interestingly, the bipolar output of the amplifier of the CHIO sent (and splitted) to check correlation on the channel 15 of the ADC CHIO (or on channel 29 of the ADC MUST2) provides a much better resolution (about 10%) than the one obtained using the unipolar output that we were looking since then (about 20% resolution).

This can be understood by the fact that the bipolar signal from the spectroscopic amplifier filters the baseline fluctuation by deriving the unipolar signal.
On the attached PID plot, it is easy to see the improvment. On the other hand, the beam spot extends also at lower channels and covers part of the other lines.
Since the unipolar signal will have some negative part (undershoot), it is possible for pile-up signals to arrive on top of this negative part and end up with lower energy.

With numexo, the energies extracted from the digitized signals, this undershoot issue is not visible.
Pinned, e744, Thu Mar 15 10:50:00 2018, Adrien Matta, MUST2, Hardware, , Distribution box LPC 8x
Cabling file by Fabien Naury (LPC).
Pinned, e744, Mon Mar 26 11:44:27 2018, e744 : Valerian, OTHER, General, , Current Elog state 
Currently we do not have access to the experiment number. To write an entry for e744 the nickname TEST will be used.
    Pinned, e744, Fri May 11 14:00:48 2018, iulian, EXL-PPT, Hardware, N/A, Mesytech settings 20180511_132034_1526038557770.jpg

iulian wrote:
Tried unsuccessfully to change the gain on EXL energies.
Looking at the inspection lines noticed that all the EXL signals were inverted (negative) and we were coding only the pole zero part of the signals.
Looking into the manual find out how to change polarity of the signals. Did that and now the signals look normal with normal gain change after polarity change.
EXL polarity is negative so Mesytech modules have to be set to use negative input signals.


PPT HV = 650 V

This is happening when the pre-amplifiers for EXL are not alimented.. When they are alimented the EXL sigal polarity is positive.. The gains and thresholds for Mesytech modules are below
Pinned, e744, Thu May 17 12:04:45 2018, iulian, EXL-PPT, Hardware, 60Co, EXL delay of ADC Codding window  Exl_timing_mesy_1_2.pdf
EXL timing delays for Mesitech module 2 & 1

Module 1
ECL sygnal going to the ADC are delayed by 1.3 us
Trigger output is delayed by 350 ns
EXL input signal has a rise time of 3 us

Module 2
ECL sygnal going to the ADC is delayed by 554 ns
Trigger output is delayed by 350 ns
EXL input signal rise time is 3 us
Pinned, e744, Mon May 21 11:26:55 2018, iulian cristina, OTHER, Hardware, N/A, error stop run/ run still going error_Narval.pngerror_DAS1.png
After stopping run 347, the narval looks like everything was stopped (blue ready), but I still had FAGs, VALs, and the leds on the GMT were blinking. MUVI was in ready state (leds green - red).
Pinned, e744, Tue May 22 18:33:32 2018, Nicolas, Adrien, OTHER, Software, , How to run Online and Convert raw data files 
1. How to run Basic_online or Online code
  • From any computer (logged as e748 user), type 'online'. This logs you to the lpcgrit server and the online directory
  • From the command line, run 'start_online' to start the Online code
    From the command line, run 'start_basic_online' to start the Basic_online code

2. How to convert raw data files
  • From any computer (logged as e748 user), type 'conversion'. This logs you to the lpcgrit server and the conversion directory

Now, two options are possible (first one is preferred)
  • From the command line, run './run_convert.sh run_number'
    This converts the raw data files which have not been converted yet since run_number
  • From the command line, run './Convert run/run_file_to_convert rootdir/converted_run_name.root
    This converts runs one by one
Pinned, e744, Tue May 22 23:42:02 2018, iulian & megumi, EXL-PPT, Software, N/A, Run #366 NARVAL FATAL ERROR error_narval_run366.png
RUN #366
EXL PPT triggers
Falat error from NARAVL


after the error, there is also following message,

____________

Level : WARN
Date : 23/05/2018 00:11:04
Logger : log from NARVAL.storer
Remote Info : localhost:41058
- - - - - - - - - -
Message :
Basic_Storer.Update_Files_Status : File name /data/e748X/e744/acquisition/run/run_0368.dat.22-05-18_23h46m25s already used.

____________

we change the run number to 400, and restart taking data

RUN #400
EXL PPT trigger
for chacking coincidence
Pinned, e744, Wed May 23 15:10:15 2018, iulian, OTHER, General, N/A, Procedure to start stop RUNS fiche_start_run.pdffiche_stop_run.pdf
Pinned, e744, Wed May 23 17:23:34 2018, Freddy, MUST2, General, , Pedestals and alpha calibration analysis Plot_DiffPedestals.png
Calibration coefficients for MUST2 telescopes were extracted from run_0118 (acquired during night from 13th to 14th of May). They are now located in the folder:

/home/e748/analysis/nptool/Projects/e744/Calibration/Energy/Calibration/Summary_run_0118

Based on the analysis of this run we realized that:
  • T4_StripX had pedestal normalization issue (for MATE 1,3,5,7) and alpha peaks were enlarged or doubled.
  • Pedestals used until today (23rd of May) were based on the pedestal measurement of the 28th of April !
Due to that, we remeasured the raw values of the pedestals today and compared them with the one used up to now.
The differences (in channels) between these two pedestal values for each telescope are plotted on the attached figure (X from 1-128 and Y after).
The drifts can be partially understood by the fact that the conditions evolved a lot during one month (cooling system temperature, etc).

For the online analysis, calibration of run_0118 (13/05) will be used but they somewhat lie in time between the two pedestal measurement (28/04 and 23/05).

However it is important right after the experiment to perform a new alpha calibration in conditions much closer to the measurement.
Pinned, e744, Thu May 24 05:44:56 2018, iulian, RUN, General, N/A, Important::analysis of the run 443/ things to do t_mm_PPT_run443.pdft_mmhf_run443.pdft_mm_exlor_run443.pdfcorrelation_run443.pdf
No stop on t5, but TAC MM_CATS ok.. So two possibilities:
1) Stop Cable not connected on Muvi2
2) Problem with the validation of CATS by FAG

HF validated by FAG was not working

Dead time scaler was not working

We need to erase all the scalers at the beginning of the run, including the part from Muvi (ORD, DESC, etc). Atm we erase only the U2M not the other part

The big problem is the transmission between LISE silicon detector D6 and T5 must with CATS on or off. 3000 counts/s on silicon d6 or CATS -> maximum 300 on T5. Is there a way to miss counting in Must2?


TAC_CATS_HF ok
TAC_MM_CATS ok
T_MM_EXLor present with prompt from cosmics?!
T_MM_HF ok
T_MM_HFv not present
Pinned, e744, Thu May 24 21:13:29 2018, Valerian, TARGET, General, N/A, List of target present in M2C 
The list of target present in M2C chamber are the following :

6 -> CH2 : 187 um / 17.391 mg/cm2 (Georges) -> Full resonance spectra
5 -> CH2 : 100 um / 9.3 mg/cm2 (GoodFellow) -> On 1/2- resonance // ERROR THIS SEEMS TO BE THE SANDWICH TARGET
4 -> CH2 : 104 um / 9.672mg/cm2 (Georges) -> On 1/2- resonance
3 -> CH2 : 63 um / 5.859mg/cm2 (GoodFellow) -> Off 1/2- resonance
2 -> CH2 : 63 um / 5.859mg/cm2 (Georges) -> Off 1/2- resonance
1 -> C : 75 um / 16.9mg/cm2 (GoodFellow) -> Fusion evaporation background
Pinned, e744, Thu May 24 23:20:40 2018, e744 Must2 + Lise teams, RUN, General, CH2, run 1002 scaler-stop-run1002.png
run 1002: 14N beam, CH2 187 um
trigger: MM1,2,3,4,5 + CATS%, EXL%, PPT%
start: 22h41
stop: 23h18

ELOG Home Page