Pinned, e748, Thu Mar 23 11:19:13 2017, Adrien Matta, , , , Schedule
|
This message will contain the update schedule of the preparation of e748.
Beam time: 1st - 9th of July 2017.
CATS Mounting: 29th |
Pinned, General, Fri Mar 24 09:32:11 2017, Adrien Matta, MUST2, Software, , Usefull document for MUST2 operations 
|
DAS Configuration:
http://wiki.ganil.fr/gap/wiki/Documentation/Software/DAS
Run control:
http://wiki.ganil.fr/gap/wiki/Documentation/Software/RCC
Calimero:
http://wiki.ganil.fr/gap/wiki/Documentation/Gru/Calimero |
Pinned, e748, Wed May 24 09:19:57 2017, Adrien Matta, OTHER, Social, , e748 Collaborators
|
List of Collaborators (Please edit if anyone is missing):
IPNOrsay: D Beaumel, Y. Blumendfeld, M Assie, N de Sereville, F Flavigny, S Franchoo, A Georgiadiou, J. Guillot, F. Hammache, I. Stefan, P. Asdley, A. Meyer, E. Rindel
CEA Saclay: M. Vandebrouck, V Lapoux,
Surrey: W. Catford, G Lotay, R. Wilkinson, S. Hallam, M. Moukaddam
Universitad des Santiago de Compostela: B. Fernandez-Dominguez
Ganil: JC Thomas, O. Sorlin, O. Kamalou, F. de Olivera, V Alcindor, T Roger, Maurici, A Lemasson, J Piot, Lucia, C Strodel, Beyan, etudiant beyan ?, J. Pancin, V. Morel, L. Menager, Sebastien Herlant, Sebastien ?, Gailor (?) F. Saillant, C. Houarner, G. Fremont
LPC: F. Delaunay, L. Achouri, J. Gibelin, B. Monteaguo, J Lory, Cedric (?), Y. Merrer.
RIKEN/TODAI: D. Susuki, S. Koyama |
Pinned, e748, Fri Jun 9 15:49:46 2017, Valérie Lapoux, MUST2, Hardware, , MUST2 configuration 
|
The MUST2 configurations for telescopes in the chamber and low/High voltage Caen crate are given in the attached file. |
Pinned, e748, Fri Jun 9 15:51:44 2017, Valérie Lapoux, MUST2, Hardware, , General Trigger GMT for MUST2 electronics
|
The GMT configuration for the trigger inputs and the inputs from MUST2 electronics are given in the file. |
Pinned, e748, Tue Jun 13 11:14:23 2017, Valérie Lapoux, MUST2, General, , GMT configuration, FAG  
|
The Gatconf parameter is now defined in the action file.
The new configuration for GMT (see chronogramme plot) is attached, with the FAG window width set at 100 ns. |
Pinned, e748, Thu Jun 15 10:16:03 2017, Valérie Lapoux, MUST2, Hardware, , Electronics for GMT trigger and FAG
|
The GMT is used in a mode where we do not make coincidence and decision, GMT entries are single and all accepted as triggers of the DAQ.
The FAG window for the GMT should be set at a low value, typically 100 ns. |
Pinned, e748, Thu Jul 6 02:41:13 2017, Freddy and the night shifters, CHIO, General, , CHIO analog treatment
|
Interestingly, the bipolar output of the amplifier of the CHIO sent (and splitted) to check correlation on the channel 15 of the ADC CHIO (or on channel 29 of the ADC MUST2) provides a much better resolution (about 10%) than the one obtained using the unipolar output that we were looking since then (about 20% resolution).
This can be understood by the fact that the bipolar signal from the spectroscopic amplifier filters the baseline fluctuation by deriving the unipolar signal.
On the attached PID plot, it is easy to see the improvment. On the other hand, the beam spot extends also at lower channels and covers part of the other lines.
Since the unipolar signal will have some negative part (undershoot), it is possible for pile-up signals to arrive on top of this negative part and end up with lower energy.
With numexo, the energies extracted from the digitized signals, this undershoot issue is not visible. |
Pinned, e744, Thu Mar 15 10:50:00 2018, Adrien Matta, MUST2, Hardware, , Distribution box LPC 8x
|
Cabling file by Fabien Naury (LPC). |
Pinned, e744, Mon Mar 26 11:44:27 2018, e744 : Valerian, OTHER, General, , Current Elog state
|
Currently we do not have access to the experiment number. To write an entry for e744 the nickname TEST will be used. |
Pinned, e744, Fri May 11 14:00:48 2018, iulian, EXL-PPT, Hardware, N/A, Mesytech settings
|
iulian wrote: | Tried unsuccessfully to change the gain on EXL energies.
Looking at the inspection lines noticed that all the EXL signals were inverted (negative) and we were coding only the pole zero part of the signals.
Looking into the manual find out how to change polarity of the signals. Did that and now the signals look normal with normal gain change after polarity change.
EXL polarity is negative so Mesytech modules have to be set to use negative input signals.
|
PPT HV = 650 V
This is happening when the pre-amplifiers for EXL are not alimented.. When they are alimented the EXL sigal polarity is positive.. The gains and thresholds for Mesytech modules are below |
Pinned, e744, Thu May 17 12:04:45 2018, iulian, EXL-PPT, Hardware, 60Co, EXL delay of ADC Codding window
|
EXL timing delays for Mesitech module 2 & 1
Module 1
ECL sygnal going to the ADC are delayed by 1.3 us
Trigger output is delayed by 350 ns
EXL input signal has a rise time of 3 us
Module 2
ECL sygnal going to the ADC is delayed by 554 ns
Trigger output is delayed by 350 ns
EXL input signal rise time is 3 us |
Pinned, e744, Mon May 21 11:26:55 2018, iulian cristina, OTHER, Hardware, N/A, error stop run/ run still going 
|
After stopping run 347, the narval looks like everything was stopped (blue ready), but I still had FAGs, VALs, and the leds on the GMT were blinking. MUVI was in ready state (leds green - red). |
Pinned, e744, Tue May 22 18:33:32 2018, Nicolas, Adrien, OTHER, Software, , How to run Online and Convert raw data files
|
1. How to run Basic_online or Online code
- From any computer (logged as e748 user), type 'online'. This logs you to the lpcgrit server and the online directory
- From the command line, run 'start_online' to start the Online code
From the command line, run 'start_basic_online' to start the Basic_online code
2. How to convert raw data files
- From any computer (logged as e748 user), type 'conversion'. This logs you to the lpcgrit server and the conversion directory
Now, two options are possible (first one is preferred)
- From the command line, run './run_convert.sh run_number'
This converts the raw data files which have not been converted yet since run_number
- From the command line, run './Convert run/run_file_to_convert rootdir/converted_run_name.root
This converts runs one by one
|
Pinned, e744, Tue May 22 23:42:02 2018, iulian & megumi, EXL-PPT, Software, N/A, Run #366 NARVAL FATAL ERROR
|
RUN #366
EXL PPT triggers
Falat error from NARAVL
after the error, there is also following message,
____________
Level : WARN
Date : 23/05/2018 00:11:04
Logger : log from NARVAL.storer
Remote Info : localhost:41058
- - - - - - - - - -
Message :
Basic_Storer.Update_Files_Status : File name /data/e748X/e744/acquisition/run/run_0368.dat.22-05-18_23h46m25s already used.
____________
we change the run number to 400, and restart taking data
RUN #400
EXL PPT trigger
for chacking coincidence |
Pinned, e744, Wed May 23 15:10:15 2018, iulian, OTHER, General, N/A, Procedure to start stop RUNS 
|
|
Pinned, e744, Wed May 23 17:23:34 2018, Freddy, MUST2, General, , Pedestals and alpha calibration analysis
|
Calibration coefficients for MUST2 telescopes were extracted from run_0118 (acquired during night from 13th to 14th of May). They are now located in the folder:
/home/e748/analysis/nptool/Projects/e744/Calibration/Energy/Calibration/Summary_run_0118
Based on the analysis of this run we realized that:
- T4_StripX had pedestal normalization issue (for MATE 1,3,5,7) and alpha peaks were enlarged or doubled.
- Pedestals used until today (23rd of May) were based on the pedestal measurement of the 28th of April !
Due to that, we remeasured the raw values of the pedestals today and compared them with the one used up to now.
The differences (in channels) between these two pedestal values for each telescope are plotted on the attached figure (X from 1-128 and Y after).
The drifts can be partially understood by the fact that the conditions evolved a lot during one month (cooling system temperature, etc).
For the online analysis, calibration of run_0118 (13/05) will be used but they somewhat lie in time between the two pedestal measurement (28/04 and 23/05).
However it is important right after the experiment to perform a new alpha calibration in conditions much closer to the measurement. |
Pinned, e744, Thu May 24 05:44:56 2018, iulian, RUN, General, N/A, Important::analysis of the run 443/ things to do   
|
No stop on t5, but TAC MM_CATS ok.. So two possibilities:
1) Stop Cable not connected on Muvi2
2) Problem with the validation of CATS by FAG
HF validated by FAG was not working
Dead time scaler was not working
We need to erase all the scalers at the beginning of the run, including the part from Muvi (ORD, DESC, etc). Atm we erase only the U2M not the other part
The big problem is the transmission between LISE silicon detector D6 and T5 must with CATS on or off. 3000 counts/s on silicon d6 or CATS -> maximum 300 on T5. Is there a way to miss counting in Must2?
TAC_CATS_HF ok
TAC_MM_CATS ok
T_MM_EXLor present with prompt from cosmics?!
T_MM_HF ok
T_MM_HFv not present |
Pinned, e744, Thu May 24 21:13:29 2018, Valerian, TARGET, General, N/A, List of target present in M2C
|
The list of target present in M2C chamber are the following :
6 -> CH2 : 187 um / 17.391 mg/cm2 (Georges) -> Full resonance spectra
5 -> CH2 : 100 um / 9.3 mg/cm2 (GoodFellow) -> On 1/2- resonance // ERROR THIS SEEMS TO BE THE SANDWICH TARGET
4 -> CH2 : 104 um / 9.672mg/cm2 (Georges) -> On 1/2- resonance
3 -> CH2 : 63 um / 5.859mg/cm2 (GoodFellow) -> Off 1/2- resonance
2 -> CH2 : 63 um / 5.859mg/cm2 (Georges) -> Off 1/2- resonance
1 -> C : 75 um / 16.9mg/cm2 (GoodFellow) -> Fusion evaporation background |
Pinned, e744, Thu May 24 23:20:40 2018, e744 Must2 + Lise teams, RUN, General, CH2, run 1002
|
run 1002: 14N beam, CH2 187 um
trigger: MM1,2,3,4,5 + CATS%, EXL%, PPT%
start: 22h41
stop: 23h18 |
|