MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 1 of 48  Not logged in MUST2
Pinned, e748, Thu Mar 23 11:19:13 2017, Adrien Matta, , , , Schedule 
This message will contain the update schedule of the preparation of e748.

Beam time: 1st - 9th of July 2017.
Pinned, General, Fri Mar 24 09:32:11 2017, Adrien Matta, MUST2, Software, , Usefull document for MUST2 operations NOTICE_UTILISATION_MUVI_HARD_et_SOFT_(ver_081013).pdfMUVI_card_USER_MANUAL_(ver_081013).pdf
DAS Configuration:
http://wiki.ganil.fr/gap/wiki/Documentation/Software/DAS
Pinned, e748, Wed May 24 09:19:57 2017, Adrien Matta, OTHER, Social, , e748 Collaborators 
List of Collaborators (Please edit if anyone is missing):

[B]IPNOrsay[/B]: D Beaumel, Y. Blumendfeld, M Assie, N de Sereville, F Flavigny, S Franchoo, A Georgiadiou, J. Guillot, F. Hammache, I. Stefan, P. Asdley,
Pinned, e748, Fri Jun 9 15:49:46 2017, Valérie Lapoux, MUST2, Hardware, , MUST2 configuration Confige748MUST2alimHVandLV.pdfpréparationMUST2forE748.pdf
The MUST2 configurations for telescopes in the chamber and low/High voltage Caen crate are given in the attached file.
Pinned, e748, Fri Jun 9 15:51:44 2017, Valérie Lapoux, MUST2, Hardware, , General Trigger GMT for MUST2 electronics DaqElectronicsMUST2gmtforE748.pdf
The GMT configuration for the trigger inputs and the inputs from MUST2 electronics are given in the file.
Pinned, e748, Tue Jun 13 11:14:23 2017, Valérie Lapoux, MUST2, General, , GMT configuration, FAG GMTconfigOKMust2FAG100ns.pngGMTtrigParamActions.pngGMTparamDASgatconf.png
The Gatconf parameter is now defined in the action file.
The new configuration for GMT (see chronogramme plot) is attached, with the FAG window width set at 100 ns.
Pinned, e748, Thu Jun 15 10:16:03 2017, Valérie Lapoux, MUST2, Hardware, , Electronics for GMT trigger and FAG DaqElectronicsMUST2gmtforE748.pdf
The GMT is used in a mode where we do not make coincidence and decision, GMT entries are single and all accepted as triggers of the DAQ.
The FAG window for the GMT should be set at a low value, typically 100 ns.
Pinned, e748, Thu Jul 6 02:41:13 2017, Freddy and the night shifters, CHIO, General, , CHIO analog treatment 
Interestingly, the bipolar output of the amplifier of the CHIO sent (and splitted) to check correlation on the channel 15 of the ADC CHIO (or on channel
29 of the ADC MUST2) provides a much better resolution (about 10%) than the one obtained using the unipolar output that we were looking since then (about
20% resolution).
Pinned, e744, Thu Mar 15 10:50:00 2018, Adrien Matta, MUST2, Hardware, , Distribution box LPC 8x
Cabling file by Fabien Naury (LPC).
Pinned, e744, Mon Mar 26 11:44:27 2018, e744 : Valerian, OTHER, General, , Current Elog state 
Currently we do not have access to the experiment number. To write an entry for e744 the nickname TEST will be used.
    Pinned, e744, Fri May 11 14:00:48 2018, iulian, EXL-PPT, Hardware, N/A, Mesytech settings 20180511_132034_1526038557770.jpg
[quote="iulian"]Tried unsuccessfully to change the gain on EXL energies.
Looking at the inspection lines noticed that all the EXL signals were inverted (negative) and we were coding only the pole zero part of the signals.  
 
Pinned, e744, Thu May 17 12:04:45 2018, iulian, EXL-PPT, Hardware, 60Co, EXL delay of ADC Codding window  Exl_timing_mesy_1_2.pdf
EXL timing delays for Mesitech module 2 & 1

Module 1 
Pinned, e744, Mon May 21 11:26:55 2018, iulian cristina, OTHER, Hardware, N/A, error stop run/ run still going error_Narval.pngerror_DAS1.png
After stopping run 347, the narval looks like everything was stopped (blue ready), but I still had FAGs, VALs, and the leds on the GMT were blinking. MUVI
was in ready state (leds green - red). 
Pinned, e744, Tue May 22 18:33:32 2018, Nicolas, Adrien, OTHER, Software, , How to run Online and Convert raw data files 
[U][B]1. How to run Basic_online or Online code[/B][/U]
[LIST]
[*] From any computer (logged as e748 user), type '[COLOR=pink]online[/COLOR]'. This logs you to the lpcgrit server and the online directory 
Pinned, e744, Tue May 22 23:42:02 2018, iulian & megumi, EXL-PPT, Software, N/A, Run #366 NARVAL FATAL ERROR error_narval_run366.png
RUN #366
EXL PPT triggers
Falat error from NARAVL
Pinned, e744, Wed May 23 15:10:15 2018, iulian, OTHER, General, N/A, Procedure to start stop RUNS fiche_start_run.pdffiche_stop_run.pdf
 
Pinned, e744, Wed May 23 17:23:34 2018, Freddy, MUST2, General, , Pedestals and alpha calibration analysis Plot_DiffPedestals.png
Calibration coefficients for MUST2 telescopes were extracted from run_0118 (acquired during night from 13th to 14th of May). They are now located in the
folder:
Pinned, e744, Thu May 24 05:44:56 2018, iulian, RUN, General, N/A, Important::analysis of the run 443/ things to do t_mm_PPT_run443.pdft_mmhf_run443.pdft_mm_exlor_run443.pdfcorrelation_run443.pdf
[I][B]No stop on t5, but TAC MM_CATS ok.. So two possibilities: 
1) Stop Cable not connected on Muvi2 
2) Problem with the validation of CATS by FAG
Pinned, e744, Thu May 24 21:13:29 2018, Valerian, TARGET, General, N/A, List of target present in M2C 
The list of target present in M2C chamber are the following : 

6 -> [B]CH2 : 187 um[/B] / 17.391 mg/cm2 (Georges) -> Full resonance spectra
Pinned, e744, Thu May 24 23:20:40 2018, e744 Must2 + Lise teams, RUN, General, CH2, run 1002 scaler-stop-run1002.png
[I][B]run 1002:[/B][/I] 14N beam, CH2 187 um
trigger: MM1,2,3,4,5 + CATS%, EXL%, PPT%
start: 22h41

ELOG Home Page