Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Text |
 |
Fixed | e748 |
Sat Jul 8 23:22:18 2017 |
e748 | BEAM | General | CD2 | Update on counting rates + scalers | 18O 4.5 uAe
CATS1 91 kcps
CATS2 114 kcps
|
|
Fixed | e748 |
Sat Jul 8 23:51:06 2017 |
e748 shift U Valérie L. | RUN | General | CD2 | Overview of run 374 around midnight |
Run at 23h48 with stable conditions, 18O
beam: 4.5 ľA
|
7x |
Fixed | e748 |
Sun Jul 9 02:41:49 2017 |
e748- shift U:Valérie L +Beyhan B. | RUN | General | CD2 | Run 374 - good beam conditions | The 18O was very stable between 0h and 2h
around I ~ 4.5 ľA.
CAVIAR ~ 161k; CATS1 ~ 88kcps; CATS2~ 111kcps |
10x |
Fixed | e748 |
Sun Jul 9 04:21:42 2017 |
e748- Beyhan B + Valérie L | BEAM | General | CD2 | BEAM SURVEY AT PCP | The beam Survey from the PCP can be seen in
the attached picture below.
Our spokesperson Adrien M can go and ask |
|
Fixed | e748 |
Sun Jul 9 04:43:40 2017 |
e748 shift U Valérie L. +Beyhan B. | RUN | General | CD2 | Run 374- 9 JULY - stop at 5h | Between 4h-4h50 the 18O has decreased from
4.5 down to 4 ľA.
CAVIAR ~ 161k; CATS1 ~ 90kcps; CATS2~ 114kcps |
 |
Fixed | e748 |
Sun Jul 9 05:21:29 2017 |
e748 shift U Valérie L. +Beyhan B.(-8h)/ Daisuke Shumpei (8h-) | RUN | General | CD2 | Run 375 after beam stop | The tuning of the beam alignment was checked
by the PCP. cf beam profiles at 5h15 in LISE
notebook and below.
|
11x |
Fixed | e748 |
Sun Jul 9 09:07:31 2017 |
Jean-Charles Valérie L. Daisuke Shumpei | RUN | General | CD2 | Run 376 LISE tuning (underway) | RUN 376 short run to check beam profile during
LISE tuning.
|
 |
Fixed | e748 |
Sun Jul 9 09:13:54 2017 |
Jean-Charles Valérie L. Daisuke Shumpei | RUN | General | CD2 | Run 377 LISE tuning (underway) | RUN 376. LISE tuning to optimize the beam
spot on target. During this run, the beam
stop will be moved.
|
  |
Fixed | e748 |
Sun Jul 9 09:36:42 2017 |
Daisuke Shumpei Valérie L. (-9h50) Jean-Charles (-10h) | RUN | General | CD2 | Run 378 | Data accumulation after LISE tuning.
9h36 started.
|
10x |
Fixed | e748 |
Sun Jul 9 09:43:29 2017 |
Daisuke Shumpei Jean-Charles | OTHER | Hardware | CD2 | Printer Magnolia is out of cartridge.. | Use "iris-color". The printer is in the room
ACS17 (found left in the corridor from the
LISE counting room to the building exit). |
|
Fixed | e748 |
Sun Jul 9 10:27:09 2017 |
Shumpei, Daisuke | OFFLINE | General | CD2 | 12Be(d,t) | More statistics for (d,t) channel.
Same gate as before () but MM1&MM4 are used. |
 |
Fixed | e748 |
Sun Jul 9 10:29:20 2017 |
Shumpei, Daisuke | OFFLINE | General | CD2 | 12Be(d,t) | More statistics for (d,t) channel.
Same gate as before (Message ID: 273
Entry time: Sat Jul 8 08:39:37 2017) but |
 |
Fixed | e748 |
Sun Jul 9 11:56:31 2017 |
Shumpei, Daisuke | OFFLINE | General | CD2 | 12Be(d,t) | [quote="Shumpei, Daisuke"]More statistics
for (d,t) channel.
Same gate as before (Message ID: 273 |
|
Fixed | e748 |
Sun Jul 9 13:42:26 2017 |
Shumpei, Daisuke | OFFLINE | General | CD2 | 10Be(d,t) & 10Be(d,3He)? | Same analysis for (d,t) channel but 10 Be
beam. run368-374.4 (-1 day data)
Separation for Z=3&4 with CHIO(analog) + |
  |
Fixed | e748 |
Sun Jul 9 16:37:21 2017 |
e748 | CHIO | General | CD2 | CHIO digitizer out | CHIO digitizer was out in run 378 |
|
Fixed | e748 |
Sun Jul 9 16:43:40 2017 |
e748 | OFFLINE | General | CD2 | Elastic scattering MM6&7 | Telescope 6&7 are analyzed for 12Be beam.
The energy of Si vs angle plot for each telescope
(CsI veto and beam position gate) are shown.
|
|
Fixed | e748 |
Sun Jul 9 16:44:58 2017 |
Shumpei, Daisuke | OFFLINE | General | CD2 | Elastic scattering MM6&7 | Telescope 6&7 are analyzed for 12Be beam.
The energy of Si vs angle plot for each telescope
(CsI veto and beam position gate on target) |
|
Fixed | e748 |
Sun Jul 9 18:44:38 2017 |
e748 | BEAM | General | CD2 | LOST BEAM around 18h30 | Vaccuum was lost after CSS2, so we lost the
primary beam (18:30)
Operators called the astreinte. |
|
Fixed | e748 |
Sun Jul 9 20:38:11 2017 |
e748 | BEAM | General | CD2 | LOST BEAM around 18h30 | Seems there is a water leak in the beam line
near alpha.
Astreinte is at work. |
|
Fixed | e748 |
Sun Jul 9 23:57:34 2017 |
e748 | BEAM | General | CD2 | NUMBER FOR PCP | There is a major shutdown of the GANIL phone
system.
You can not call the pcp via the usual extention; |
|