Fixed, e748, Tue Jul 4 15:50:02 2017, 8e748, RUN, General, CD2, Run 296
|
Run 299
restart with all triggers MUST2 |
Fixed, e748, Tue Jul 4 18:29:39 2017, e748, MUST2, Software, N/A, Start a new acquisition with Numexo
|
-To start a run :
START Acquisition NUMEXO
|
Fixed, e748, Tue Jul 4 19:38:32 2017, e748, RUN, General, CD2, Run #323 main daq - Run #322 NUMEXO2
|
Run #323 on main daq <=> Run #322 NUMEXO2
Physics run: 12Be on CD2 #3 2.5 mg
On next run we will try to have the correct run # on NUMEXO2 |
Fixed, e748, Tue Jul 4 20:27:59 2017, Franck et Valérian, CHIO, Hardware, N/A, UPDATE : CHIO's electronic scheme (valid from run 217)
|
Modification of the scheme to add the delay on the CHIO's logic signal for stop of the digitizer. |
Fixed, e748, Tue Jul 4 20:30:52 2017, e748, RUN, General, CD2, Run #323 scaler capture
|
Run #323 scaler capture at 20h30 |
Fixed, e748, Wed Jul 5 00:29:06 2017, Valérie L, RUN, General, CD2, Summary of the evening runs 322(e748chio)-323 (e748) 
|
============================================================================================================
[e748'@ganp616 run]$ cd /data/e748chioX/e748chio/acquisition/run
-r--r--r-- 1 e748chio Exxx 4194288609 4 juil. 20:33 run_0322.dat.04-07-17_19h26m13s
|
Fixed, e748, Wed Jul 5 00:40:36 2017, Valérie L, RUN, General, CD2, Overview of the evening config 322(e748chio)-323 (e748)  
|
BEAM conditions
CAVIAR LISE 35k
GMT TRiggers:
|
Fixed, e748, Wed Jul 5 00:58:43 2017, Valérie L, RUN, General, CD2, Overview of the evening plots Run323-e748 (Run 322 chio) 19x
|
Run 323 DAQ E748; Run 322 DAQ CHIO see plots below.
Run 323
|
Fixed, e748, Wed Jul 5 01:07:15 2017, e748, OFFLINE, Software, , Merge of NUMEXO runs with standard runs   
|
Here are some plots after offline merge correlation of the CHIO energy coded in NUMEX0 with other parameters.
First pictures concerns run300 with trigger MUST2 only.
|
Fixed, e748, Wed Jul 5 03:35:53 2017, Valérie L, RUN, General, CD2, SiLi 1/T5 trip
|
AT 3h30 we saw that the SiLi1 of T5 has tripped during the run run_0323.dat.04-07-17_19h25m59s.2 (run started at 2h22)
We put it On again. HV 400V I~ 6.5 ľA |
Fixed, e748, Wed Jul 5 04:34:06 2017, e748 shift U, RUN, General, CD2, Overview of Config and TAC during run 323 (.3) 
|
The counting rates in the Gatconf, confdev, dataTrig of the different branches are checked in the first plot below.
The second picture is for the TAC.
|
Fixed, e748, Wed Jul 5 04:55:06 2017, Valérie L, RUN, General, CD2, Scalers and summary of Run 323 at 4h55-7h30 
|
E748 Runs (around 3h30 for 1Go)
Run 323_2 started at 2h22 stop 5h56
|
Fixed, e748, Wed Jul 5 06:11:47 2017, e748 shift U, RUN, General, CD2, Overview of Config +QplastTcats1 during run 323 (.5) 
|
The counting rates in the Gatconf, confdev, dataTrig of the different branches are checked in the first plot below.
see plot Qplast %TplCats1 with the night statistics.
|
Fixed, e748, Wed Jul 5 08:10:03 2017, Valérie L, RUN, General, CD2, Run 325 DAQ 748- run 325 DAQ ChIo   
|
We stopped the run 323 (DAQ E748) and run 322 (ChIo) when the beam was stopped by the machine during 10 minutes to check the beam intensity.
The run numbers for DAQ E748 and DAQ ChIo were realigned to 325 for both.
|
Fixed, e748, Wed Jul 5 09:13:17 2017, e748-A. Lemasson, CHIO, Hardware, CD2, CHIO cathode problems
|
Thomas and Julien going to D6, the cathode power supply tripped.
Setting it back and we will check signal when beam is sent back. |
Fixed, e748, Wed Jul 5 09:22:16 2017, Valérie L, RUN, General, CD2, Run 326DAQ- Run 326Chio  
|
Run 325 start at 9h19
We are running again after some change -switching on- of the power supply of the ChIo cathode).
End of run problem with the Caviar VME CPU seen offline.
|
Fixed, e748, Wed Jul 5 10:54:09 2017, Valérie L, RUN, General, CD2, SiLi 1/T5 trip
|
AT 10h50 we saw that the SiLi1 of T5 has tripped during the run run_0328.dat. (run started at 10h15 )
We put it On again. HV 400V I~ 10 ľA increasing to 24-25ľA |
Fixed, e748, Wed Jul 5 10:58:54 2017, Valérie L, RUN, General, CD2, Run summary 327, 328 
|
run daq E748 (3h30 for 1Go)
-r--r--r-- 1 e748 Exxx 100M 5 juil. 10:14 run_0327.dat.05-07-17_09h55m11s
-rw-r--r-- 1 e748 Exxx 212M 5 juil. 10:55 run_0328.dat.05-07-17_10h14m56s
|
Fixed, e748, Wed Jul 5 11:10:48 2017, Valérie L., MUST2, General, CD2, Geometrical configurations for MUST2
|
|
Fixed, e748, Wed Jul 5 11:13:27 2017, Valérie L., MUST2, General, CD2, Power boards HV and LV for MUST2
|
|
|