Fixed, e748, Tue Jul 4 15:50:02 2017, 8e748, RUN, General, CD2, Run 296 
Run 299
restart with all triggers MUST2
Fixed, e748, Tue Jul 4 18:29:39 2017, e748, MUST2, Software, N/A, Start a new acquisition with Numexo CaptureSResetCHIODig.png
-To start a run :

  START  Acquisition NUMEXO
Fixed, e748, Tue Jul 4 19:38:32 2017, e748, RUN, General, CD2, Run #323 main daq - Run #322 NUMEXO2 
Run #323 on main daq <=> Run #322 NUMEXO2
Physics run: 12Be on CD2 #3 2.5 mg
On next run we will try to have the correct run # on NUMEXO2
Fixed, e748, Tue Jul 4 20:27:59 2017, Franck et Valérian, CHIO, Hardware, N/A, UPDATE : CHIO's electronic scheme (valid from run 217) Schema_electronique_CHIO.pdf
Modification of the scheme to add the delay on the CHIO's logic signal for stop of the digitizer.
Fixed, e748, Tue Jul 4 20:30:52 2017, e748, RUN, General, CD2, Run #323 scaler capture Capture-SCALERANALYSER_run323.png
Run #323 scaler capture at 20h30
Fixed, e748, Wed Jul 5 00:29:06 2017, Valérie L, RUN, General, CD2, Summary of the evening runs 322(e748chio)-323 (e748) RunControlChIoRun322.pngRunControlRun323.png
============================================================================================================
[e748'@ganp616 run]$ cd /data/e748chioX/e748chio/acquisition/run
-r--r--r-- 1 e748chio Exxx 4194288609  4 juil. 20:33 run_0322.dat.04-07-17_19h26m13s
Fixed, e748, Wed Jul 5 00:40:36 2017, Valérie L, RUN, General, CD2, Overview of the evening config 322(e748chio)-323 (e748) ScalersRun323e748at0h48.pngConfigCEntrumE748.pngPulserChIoForScalerDAQ.png
BEAM conditions
CAVIAR LISE 35k
GMT TRiggers:
Fixed, e748, Wed Jul 5 00:58:43 2017, Valérie L, RUN, General, CD2, Overview of the evening plots Run323-e748 (Run 322 chio) 19x
Run 323 DAQ E748; Run 322 DAQ CHIO see plots below.

Run 323 
Fixed, e748, Wed Jul 5 01:07:15 2017, e748, OFFLINE, Software, , Merge of NUMEXO runs with standard runs run200_IC_numexodiff.pngrun300_ICENUMEXO_TCATSCAV.pngrun300_ICENUMEXO_TPLCATS1.pngrun300_TPLCHIO_LTSdiff.png
Here are some plots after offline merge correlation of the CHIO energy coded in NUMEX0 with other parameters.

First pictures concerns run300 with trigger MUST2 only. 
Fixed, e748, Wed Jul 5 03:35:53 2017, Valérie L, RUN, General, CD2, SiLi 1/T5 trip 
AT 3h30 we saw that the SiLi1 of T5 has tripped during the run run_0323.dat.04-07-17_19h25m59s.2 (run started at 2h22)

We put it On again. HV 400V I~ 6.5 ľA
Fixed, e748, Wed Jul 5 04:34:06 2017, e748 shift U, RUN, General, CD2, Overview of Config and TAC during run 323 (.3) run_323_conf.pngrun_323_tac.png
The counting rates in the Gatconf, confdev, dataTrig of the different branches are checked in the first plot below.
The second picture is for the TAC.
Fixed, e748, Wed Jul 5 04:55:06 2017, Valérie L, RUN, General, CD2, Scalers and summary of Run 323 at 4h55-7h30 ScalersRun323AT4h54.pngRunControlBuffer5julyAt6h.png
E748 Runs (around 3h30 for 1Go)

Run 323_2  started at 2h22 stop 5h56
Fixed, e748, Wed Jul 5 06:11:47 2017, e748 shift U, RUN, General, CD2, Overview of Config +QplastTcats1 during run 323 (.5) Run323QplastTcatsconf.pngRunControlBuffer5julyAt6h.png
The counting rates in the Gatconf, confdev, dataTrig of the different branches are checked in the first plot below.
 
see plot Qplast %TplCats1 with the night statistics.
Fixed, e748, Wed Jul 5 08:10:03 2017, Valérie L, RUN, General, CD2, Run 325 DAQ 748- run 325 DAQ ChIo Run325DAQE748daqChIo.pngRun325ChioDigET.pngScalerAnalyserRun325at8h30.pngGMTtriggerAllRun325.png
We stopped the run 323 (DAQ E748) and run 322 (ChIo) when the beam was stopped by the machine during 10 minutes to check the beam intensity.

The run numbers for DAQ E748 and DAQ ChIo were realigned to 325 for both.
Fixed, e748, Wed Jul 5 09:13:17 2017, e748-A. Lemasson, CHIO, Hardware, CD2, CHIO cathode problems 
Thomas and Julien going to D6, the cathode power supply tripped.
Setting it back and we will check signal when beam is sent back.
Fixed, e748, Wed Jul 5 09:22:16 2017, Valérie L, RUN, General, CD2, Run 326DAQ- Run 326Chio Run326controlBuffer.pngScalerAnalyzerRun326.pngProblemCaviarEndOfRun326.png
Run 325 start at 9h19
We are running again after some change -switching on- of the power supply of the ChIo cathode).
End of run problem with the Caviar VME CPU seen offline.
Fixed, e748, Wed Jul 5 10:54:09 2017, Valérie L, RUN, General, CD2, SiLi 1/T5 trip 
AT 10h50 we saw that the SiLi1 of T5 has tripped during the run run_0328.dat.  (run started at 10h15 )

We put it On again. HV 400V I~ 10 ľA increasing to 24-25ľA
Fixed, e748, Wed Jul 5 10:58:54 2017, Valérie L, RUN, General, CD2, Run summary 327, 328 Run328Scaler.pngCheckParamBytesEvtNumexoRun328.png
run daq E748  (3h30 for 1Go)
-r--r--r-- 1 e748 Exxx  100M  5 juil. 10:14 run_0327.dat.05-07-17_09h55m11s
-rw-r--r-- 1 e748 Exxx  212M  5 juil. 10:55 run_0328.dat.05-07-17_10h14m56s
Fixed, e748, Wed Jul 5 11:10:48 2017, Valérie L., MUST2, General, CD2, Geometrical configurations for MUST2 ConfigGEOMImpactMUST2e748.pdf
 
Fixed, e748, Wed Jul 5 11:13:27 2017, Valérie L., MUST2, General, CD2, Power boards HV and LV for MUST2 ConfigHVetLVExpE748MUST2d6v2017.pdf
 