MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 10 of 48  Not logged in MUST2
Status ExpNbr Date Author Type Category Target-Source Subject Text Attachments
Fixede748 Tue Jul 4 15:50:02 2017 8e748RUNGeneralCD2Run 296Run 299
restart with all triggers MUST2
  
Fixede748 Tue Jul 4 18:29:39 2017 e748MUST2SoftwareN/AStart a new acquisition with Numexo-To start a run :

  START  Acquisition NUMEXO
 CaptureSResetCHIODig.png 
Fixede748 Tue Jul 4 19:38:32 2017 e748RUNGeneralCD2Run #323 main daq - Run #322 NUMEXO2Run #323 on main daq <=> Run #322 NUMEXO2
Physics run: 12Be on CD2 #3 2.5 mg
On next run we will try to have the correct
  
Fixede748 Tue Jul 4 20:27:59 2017 Franck et ValérianCHIOHardwareN/AUPDATE : CHIO's electronic scheme (valid from run 217)Modification of the scheme to add the delay
on the CHIO's logic signal for stop of the
digitizer.
 Schema_electronique_CHIO.pdf 
Fixede748 Tue Jul 4 20:30:52 2017 e748RUNGeneralCD2Run #323 scaler captureRun #323 scaler capture at 20h30  Capture-SCALERANALYSER_run323.png 
Fixede748 Wed Jul 5 00:29:06 2017 Valérie LRUNGeneralCD2Summary of the evening runs 322(e748chio)-323 (e748)============================================================================================================
[e748'@ganp616 run]$ cd /data/e748chioX/e748chio/acquisition/run
-r--r--r-- 1 e748chio Exxx 4194288609  4
 RunControlChIoRun322.pngRunControlRun323.png 
Fixede748 Wed Jul 5 00:40:36 2017 Valérie LRUNGeneralCD2Overview of the evening config 322(e748chio)-323 (e748)BEAM conditions
CAVIAR LISE 35k
GMT TRiggers:
 ScalersRun323e748at0h48.pngConfigCEntrumE748.pngPulserChIoForScalerDAQ.png 
Fixede748 Wed Jul 5 00:58:43 2017 Valérie LRUNGeneralCD2Overview of the evening plots Run323-e748 (Run 322 chio)Run 323 DAQ E748; Run 322 DAQ CHIO see plots
below.
 19x 
Fixede748 Wed Jul 5 01:07:15 2017 e748OFFLINESoftware Merge of NUMEXO runs with standard runsHere are some plots after offline merge correlation
of the CHIO energy coded in NUMEX0 with other
parameters.
 run200_IC_numexodiff.pngrun300_ICENUMEXO_TCATSCAV.pngrun300_ICENUMEXO_TPLCATS1.pngrun300_TPLCHIO_LTSdiff.png 
Fixede748 Wed Jul 5 03:35:53 2017 Valérie LRUNGeneralCD2SiLi 1/T5 tripAT 3h30 we saw that the SiLi1 of T5 has tripped
during the run run_0323.dat.04-07-17_19h25m59s.2
(run started at 2h22)
  
Fixede748 Wed Jul 5 04:34:06 2017 e748 shift URUNGeneralCD2Overview of Config and TAC during run 323 (.3)The counting rates in the Gatconf, confdev,
dataTrig of the different branches are checked
in the first plot below.
 run_323_conf.pngrun_323_tac.png 
Fixede748 Wed Jul 5 04:55:06 2017 Valérie LRUNGeneralCD2Scalers and summary of Run 323 at 4h55-7h30E748 Runs (around 3h30 for 1Go)

Run 323_2  started at 2h22 stop 5h56
 ScalersRun323AT4h54.pngRunControlBuffer5julyAt6h.png 
Fixede748 Wed Jul 5 06:11:47 2017 e748 shift URUNGeneralCD2Overview of Config +QplastTcats1 during run 323 (.5)The counting rates in the Gatconf, confdev,
dataTrig of the different branches are checked
in the first plot below.
 Run323QplastTcatsconf.pngRunControlBuffer5julyAt6h.png 
Fixede748 Wed Jul 5 08:10:03 2017 Valérie LRUNGeneralCD2Run 325 DAQ 748- run 325 DAQ ChIoWe stopped the run 323 (DAQ E748) and run
322 (ChIo) when the beam was stopped by the
machine during 10 minutes to check the beam
 Run325DAQE748daqChIo.pngRun325ChioDigET.pngScalerAnalyserRun325at8h30.pngGMTtriggerAllRun325.png 
Fixede748 Wed Jul 5 09:13:17 2017 e748-A. LemassonCHIOHardwareCD2CHIO cathode problemsThomas and Julien going to D6, the cathode
power supply tripped.
Setting it back and we will check signal
  
Fixede748 Wed Jul 5 09:22:16 2017 Valérie LRUNGeneralCD2Run 326DAQ- Run 326ChioRun 325 start at 9h19
We are running again after some change -switching
on- of the power supply of the ChIo cathode).
 Run326controlBuffer.pngScalerAnalyzerRun326.pngProblemCaviarEndOfRun326.png 
Fixede748 Wed Jul 5 10:54:09 2017 Valérie LRUNGeneralCD2SiLi 1/T5 tripAT 10h50 we saw that the SiLi1 of T5 has tripped
during the run run_0328.dat.  (run started
at 10h15 )
  
Fixede748 Wed Jul 5 10:58:54 2017 Valérie LRUNGeneralCD2Run summary 327, 328run daq E748  (3h30 for 1Go)
-r--r--r-- 1 e748 Exxx  100M  5 juil. 10:14
run_0327.dat.05-07-17_09h55m11s
 Run328Scaler.pngCheckParamBytesEvtNumexoRun328.png 
Fixede748 Wed Jul 5 11:10:48 2017 Valérie L.MUST2GeneralCD2Geometrical configurations for MUST2   ConfigGEOMImpactMUST2e748.pdf 
Fixede748 Wed Jul 5 11:13:27 2017 Valérie L.MUST2GeneralCD2Power boards HV and LV for MUST2   ConfigHVetLVExpE748MUST2d6v2017.pdf 

ELOG Home Page