Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Text |
 |
Fixed | e744s |
Tue Apr 16 07:53:16 2019 |
louis, Guiseppe | ONLINE | General | CH2 | Log and scalers RUN 132 @8:00 | |
19x |
Fixed | e768s |
Sun Jul 21 17:45:54 2019 |
kseniia | AGATA | General | | Current total stats on 19Ne | Stats from runs 112, 115, 116, 117, 118, 119(~15h)
beta = 8%
Q = 9 & 10 |
 |
Fixed | e793s |
Fri Mar 12 23:54:52 2021 |
julien, nishu, Faïrouz | VAMOS | Hardware | CD2 | Vamos tripped @ 23h35 & fixed | |
|
Fixed | e793s |
Fri Mar 12 22:26:55 2021 |
julien, nishu | VAMOS | Hardware | CD2 | VAMOS tripped @ ~ 22:24 | back again to normal, |
|
Fixed | e793s |
Fri Mar 12 22:31:46 2021 |
julien, nishu | VAMOS | Hardware | CD2 | VAMOS tripped @ ~ 22:24 ans again ~ 22:45 | back again to normal after restarting the
HV
(22:39) |
  |
Fixed | e793s |
Fri Mar 12 23:16:16 2021 |
julien, nishu | RUN | Hardware | CD2 | vamos count rate goes down to 0 once again | We reduced the high voltage limit to 520v
from 525v.
please see the screen shots of the focal |
 |
Fixed | e793s |
Fri Mar 12 23:27:58 2021 |
julien, nishu | RUN | General | CD2 | summary of run 61 | below attached the screenshots of scalers
and spectra |
    |
Fixed | TEST |
Thu Feb 21 14:37:26 2019 |
iulian, valerian &Freddy | GRIT | Hardware | 3-alpha | Results Calibration 3-alpha RUN30 MG1, MG3,MG5 & MG7 | Results of the calibration run 30
In order:
Telescope1 X,Y (MG5 X,Y)
|
8x |
Fixed | TEST |
Thu Feb 21 17:32:42 2019 |
iulian, freddy | GRIT | Hardware | 3-alpha | run 33 3 alfa with MG1,MG3,MG4,MG5,MG7,MG9 short run | First test of the repaired 2xcables. The repaired
cables were placed between MUVI1_2 <=> MG4
& MUVI1_4 <=>MG11 (longer cable)
|
 |
Fixed | e768s |
Thu Jul 18 22:50:58 2019 |
iulian, Jenn, Franco | OFFLINE | General | LiF | Ex in 19F from run 72 | Gamma energy vs excitation energy in 19F with
all backward detectors for run 0072_0 |
|
Fixed | e744s |
Tue Apr 16 19:50:20 2019 |
iulian valerian francois sylvan | OTHER | General | N/A | todo list after beam time | 0) Heating the electronics of MUGAST
1) Calibration 3a with pedestals (10 min)
2) Calibration 3a 24 h
|
|
Fixed | com2019 |
Wed Apr 3 21:02:18 2019 |
iulian ruxandra fairouz | ONLINE | General | N/A | Test correlation between different VXI acq | Test performed using a 100 Hz pulser signal
send into the master trigger (entry 9 on
GMTMASTER) and the analogical part send into |
   |
Fixed | e744s |
Sat Apr 13 00:27:08 2019 |
iulian nicolas Nikola Mariluz | RUN | Software | CH2 | Screenshots run119 v1 | |
21x |
Fixed | TEST |
Tue Feb 26 13:21:32 2019 |
iulian freddy | GRIT | Software | N/A | run 42 Calimero run MUVI 1 on X sectors | [U][B]run #42
[/B][/U]Calimero MUVI1 X
|
|
Fixed | TEST |
Tue Feb 26 13:50:36 2019 |
iulian freddy | GRIT | Software | N/A | run 43 Calimero run MUVI 1 on Y sectors | [U][B]run #43
[/B][/U]Calimero MUVI1 Y |
|
Fixed | TEST |
Tue Feb 26 14:52:49 2019 |
iulian freddy | GRIT | Software | N/A | run 44 Calimero run MUVI 2 on X sectors (bad run) | [U][B]run #44[/B][/U] bad run
Calimero MUVI2 X
|
|
Fixed | TEST |
Mon Mar 4 15:30:31 2019 |
iulian Marlene & Valerian | MUST2 | Hardware | 3-alpha | run 51 3-alpha run with Pedestals Aligned @ 13 deg Measured on cooling system | [U][B]RUN 51[/B][/U]
3a run with Pedestals Aligned[I][U] but not[/U][/I]
suppressed |
 |
Fixed | TEST |
Tue Mar 5 12:13:41 2019 |
iulian Marlene | MUST2 | Software | N/A | run 60 Gamme 600 ns Time Calibration run (Calimero) on MUVI 3 MM1 X | RUNS 58,59,60 are bad runs
[U][B]Run 61[/B][/U]
|
 |
Fixed | TEST |
Tue Mar 5 15:53:04 2019 |
iulian Marlene | MUST2 | Software | N/A | Calimero problems | problems with Calimero solved by killing some
processes on lpcgrit related with Narval.
to find the processes on lpcgrit:
|
|
Fixed | TEST |
Tue Mar 5 16:20:11 2019 |
iulian Marlene | MUST2 | Software | N/A | run 77 Gamme 600 ns Time Calibration run (Calimero) on MUVI 3 MM1 X . good run | [U][B]Run 76[/B][/U]
|
|