MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 8 of 132  Not logged in MUGAST
Status ExpNbr Date Authordown Type Category Target-Source Subject
Fixede744s Tue Apr 16 07:53:16 2019 louis, GuiseppeONLINEGeneralCH2Log and scalers RUN 132 @8:00
Attachment 1: run132_scaler_3.png
run132_scaler_3.png
Attachment 2: run132_VAMOS_4_2.png
run132_VAMOS_4_2.png
Attachment 3: run132_VAMOS_4_3.png
run132_VAMOS_4_3.png
Attachment 4: run132_VAMOS_4_4.png
run132_VAMOS_4_4.png
Attachment 5: run132_VAMOS_4_5.png
run132_VAMOS_4_5.png
Attachment 6: run132_VAMOS_4_6.png
run132_VAMOS_4_6.png
Attachment 7: run132_VAMOS_4_7.png
run132_VAMOS_4_7.png
Attachment 8: run132_VAMOS_4_9.png
run132_VAMOS_4_9.png
Attachment 9: run132_VAMOS_4_10.png
run132_VAMOS_4_10.png
Attachment 10: run132_VAMOS_4_11.png
run132_VAMOS_4_11.png
Attachment 11: run132_VAMOS_4_12.png
run132_VAMOS_4_12.png
Attachment 12: run132_Mugast_4_1.png
run132_Mugast_4_1.png
Attachment 13: run132_Mugast_4_2.png
run132_Mugast_4_2.png
Attachment 14: run132_Mugast_4_3.png
run132_Mugast_4_3.png
Attachment 15: run132_Mugast_4_4.png
run132_Mugast_4_4.png
Attachment 16: run132_Mugast_4_5.png
run132_Mugast_4_5.png
Attachment 17: run132_Mugast_4_6.png
run132_Mugast_4_6.png
Attachment 18: run132_Mugast_4_7.png
run132_Mugast_4_7.png
Attachment 19: run132_Mugast_4_8.png
run132_Mugast_4_8.png
Fixede768s Sun Jul 21 17:45:54 2019 kseniiaAGATAGeneral Current total stats on 19Ne
Stats from runs 112, 115, 116, 117, 118, 119(~15h)
beta = 8%
Q = 9 & 10
Attachment 1: run112-119part-c.png
run112-119part-c.png
Attachment 2: run112-119part_zoom.png
run112-119part_zoom.png
Fixede793s Fri Mar 12 23:54:52 2021 julien, nishu, FaïrouzVAMOSHardwareCD2Vamos tripped @ 23h35 & fixed
Fixede793s Fri Mar 12 22:26:55 2021 julien, nishuVAMOSHardwareCD2VAMOS tripped @ ~ 22:24
back again to normal,
Fixede793s Fri Mar 12 22:31:46 2021 julien, nishuVAMOSHardwareCD2VAMOS tripped @ ~ 22:24 ans again ~ 22:45
back again to normal after restarting the HV
(22:39)
Attachment 1: vamos_nc.png
vamos_nc.png
Attachment 2: Screenshot_from_2021-03-12_22-33-47.png
Screenshot_from_2021-03-12_22-33-47.png
Attachment 3: Screenshot_from_2021-03-12_22-47-38.png
Screenshot_from_2021-03-12_22-47-38.png
Fixede793s Fri Mar 12 23:16:16 2021 julien, nishuRUNHardwareCD2vamos count rate goes down to 0 once again
We reduced the high voltage limit to 520v from 525v.
please see the screen shots of the focal planes attached below:.
Attachment 1: IMG20210312231358.jpg
IMG20210312231358.jpg
Attachment 2: IMG20210312230429.jpg
IMG20210312230429.jpg
Fixede793s Fri Mar 12 23:27:58 2021 julien, nishuRUNGeneralCD2summary of run 61
below attached the screenshots of scalers and spectra
Attachment 1: Screenshot_from_2021-03-12_23-31-23.png
Screenshot_from_2021-03-12_23-31-23.png
Attachment 2: Screenshot_from_2021-03-12_23-31-07.png
Screenshot_from_2021-03-12_23-31-07.png
Attachment 3: Screenshot_from_2021-03-12_23-30-43.png
Screenshot_from_2021-03-12_23-30-43.png
Attachment 4: Screenshot_from_2021-03-12_23-30-22.png
Screenshot_from_2021-03-12_23-30-22.png
Attachment 5: Screenshot_from_2021-03-12_23-29-52.png
Screenshot_from_2021-03-12_23-29-52.png
FixedTEST Thu Feb 21 14:37:26 2019 iulian, valerian &FreddyGRITHardware3-alphaResults Calibration 3-alpha RUN30 MG1, MG3,MG5 & MG7
Results of the calibration run 30
In order:
Telescope1 X,Y (MG5 X,Y)
Telescope4 X,Y (MG3 X,Y)
Telescope7 X,Y (MG7 X,Y)
Telescope9 X,Y (MG1 X,Y)
Attachment 1: Telescope1Summary.pdf
Telescope1Summary.pdf
Attachment 2: Telescope1Summary.pdf
Telescope1Summary.pdf
Attachment 3: Telescope4Summary.pdf
Telescope4Summary.pdf
Attachment 4: Telescope4Summary.pdf
Telescope4Summary.pdf
Attachment 5: Telescope7Summary.pdf
Telescope7Summary.pdf
Attachment 6: Telescope7Summary.pdf
Telescope7Summary.pdf
Attachment 7: Telescope9Summary.pdf
Telescope9Summary.pdf
Attachment 8: Telescope9Summary.pdf
Telescope9Summary.pdf
FixedTEST Thu Feb 21 17:32:42 2019 iulian, freddyGRITHardware3-alpharun 33 3 alfa with MG1,MG3,MG4,MG5,MG7,MG9 short run
First test of the repaired 2xcables. The repaired cables were placed between MUVI1_2 <=> MG4 & MUVI1_4 <=>MG11 (longer cable)
Correspondance for the rest is the same as for run 30. The mapping is the same for all detectors (including anulaire detector).

Alpha source run for trapezoid detectors + anulaire detector with pedestals aligned and zero suppression. Cooling at 15°C.
Thresholds at 500 keV.

On MUVI1:

1--> MG5 (150V)
2--> MG4 (95V)
3--> MG3 (160V)
4--> MG11 (60V)

On MUVI2:
5--> MG7 (120V)
6--> MG1 (140V)
7--> --
8--> --

TRIGGERS are:
GMT ch1 --> OR MUVI1
GMT ch2 --> OR MUVI2
GMT ch3 --> OR MUVI3 (nothing on it)
Attachment 1: 3alpha_sourceMG1MG4MG7MG9XY_run33.png
3alpha_sourceMG1MG4MG7MG9XY_run33.png
Attachment 2: 3alpha_sourceMG3MG5XY_run33.png
3alpha_sourceMG3MG5XY_run33.png
Fixede768s Thu Jul 18 22:50:58 2019 iulian, Jenn, FrancoOFFLINEGeneralLiFEx in 19F from run 72
Gamma energy vs excitation energy in 19F with all backward detectors for run 0072_0
Attachment 1: Egamma_vs_Ex_8_19FVam_run72_0.png
Egamma_vs_Ex_8_19FVam_run72_0.png
Fixede744s Tue Apr 16 19:50:20 2019 iulian valerian francois sylvan OTHERGeneralN/Atodo list after beam time
0) Heating the electronics of MUGAST
1) Calibration 3a with pedestals (10 min)
2) Calibration 3a 24 h
2b) Make the electronics drawing (with a lot of pictures). Include TAC ranges and measure delays
3) Calimero (time calibration of MUGAST)
4) TAC calibration (MUGAST + VAMOS)
5) Vamos ?!
Fixedcom2019 Wed Apr 3 21:02:18 2019 iulian ruxandra fairouz ONLINEGeneralN/ATest correlation between different VXI acq
Test performed using a 100 Hz pulser signal send into the master trigger (entry 9 on GMTMASTER) and the analogical part send into a amplifier then split in 3 signal send to VXI MUGAST , VXI CATS and VXI Vamos.
No problem observed. See first image below (test_corel_Pulesr_all.png)


Didn't work properly with a tac signal divided in 3 or from 3 tacs with same start /stop. See test_corel.png and test_corel_2000.png
This might be due to the time calibrator trigger as it is very random and pile-up effects can contribute. Maybe with a very low trigger rate might work
Attachment 1: test_corel_Pulesr_all.png
test_corel_Pulesr_all.png
Attachment 2: test_corel.png
test_corel.png
Attachment 3: test_corel_2000.png
test_corel_2000.png
Attachment 4: test_corel_Pulesr_Mugast_CATS.png
test_corel_Pulesr_Mugast_CATS.png
Fixede744s Sat Apr 13 00:27:08 2019 iulian nicolas Nikola MariluzRUNSoftwareCH2Screenshots run119 v1
Attachment 1: run119_Vamos_1_1.png
run119_Vamos_1_1.png
Attachment 2: run119_Vamos_1_11.png
run119_Vamos_1_11.png
Attachment 3: run119_Vamos_1_10.png
run119_Vamos_1_10.png
Attachment 4: run119_Vamos_1_9.png
run119_Vamos_1_9.png
Attachment 5: run119_Vamos_1_8.png
run119_Vamos_1_8.png
Attachment 6: run119_Vamos_1_7.png
run119_Vamos_1_7.png
Attachment 7: run119_Vamos_1_6.png
run119_Vamos_1_6.png
Attachment 8: run119_Vamos_1_5.png
run119_Vamos_1_5.png
Attachment 9: run119_Vamos_1_4.png
run119_Vamos_1_4.png
Attachment 10: run119_Vamos_1_3.png
run119_Vamos_1_3.png
Attachment 11: run119_Vamos_1_2.png
run119_Vamos_1_2.png
Attachment 12: run119_Mugast_1_9.png
run119_Mugast_1_9.png
Attachment 13: run119_Mugast_1_8.png
run119_Mugast_1_8.png
Attachment 14: run119_Mugast_1_7.png
run119_Mugast_1_7.png
Attachment 15: run119_Mugast_1_6.png
run119_Mugast_1_6.png
Attachment 16: run119_Mugast_1_5.png
run119_Mugast_1_5.png
Attachment 17: run119_Mugast_1_4.png
run119_Mugast_1_4.png
Attachment 18: run119_Mugast_1_3.png
run119_Mugast_1_3.png
Attachment 19: run119_Mugast_1_2.png
run119_Mugast_1_2.png
Attachment 20: run119_Mugast_1_1.png
run119_Mugast_1_1.png
Attachment 21: run119_Scalers_1_1.png
run119_Scalers_1_1.png
FixedTEST Tue Feb 26 13:21:32 2019 iulian freddy GRITSoftwareN/Arun 42 Calimero run MUVI 1 on X sectors
run #42
Calimero MUVI1 X


run #41
Calimero MUVI secttor 1X
FixedTEST Tue Feb 26 13:50:36 2019 iulian freddy GRITSoftwareN/Arun 43 Calimero run MUVI 1 on Y sectors
run #43
Calimero MUVI1 Y
FixedTEST Tue Feb 26 14:52:49 2019 iulian freddy GRITSoftwareN/Arun 44 Calimero run MUVI 2 on X sectors (bad run)
run #44 bad run
Calimero MUVI2 X

During the run we noticed that time calibrator is on MUVI1 only .
Attachment 1: run44_error_calimero.png
run44_error_calimero.png
FixedTEST Mon Mar 4 15:30:31 2019 iulian Marlene & ValerianMUST2Hardware3-alpharun 51 3-alpha run with Pedestals Aligned @ 13 deg Measured on cooling system
RUN 51
3a run with Pedestals Aligned but not suppressed
Attachment 1: run51_HVs.png
run51_HVs.png
Attachment 2: run51_3a_Must3_pedestalAligned.png
run51_3a_Must3_pedestalAligned.png
FixedTEST Tue Mar 5 12:13:41 2019 iulian MarleneMUST2SoftwareN/Arun 60 Gamme 600 ns Time Calibration run (Calimero) on MUVI 3 MM1 X
RUNS 58,59,60 are bad runs

Run 61


Calimero on Muvi3 MM1(X)

Gamme 600 ns

Procedure:

0) HT on the detectors Off
1) Apply Das config
2) Put Das offline
3) Start Geco
4) Activate on each of the sector to calibrate the X side (see bellow image)
5) execute Calimero.exe in calimero directory
6) modify the calimero config on Geco (see bellow near config button)
7) Start the run in RCC
8) Start calimero (start button in Geco)
Attachment 1: run60_calimero_mm1X.png
run60_calimero_mm1X.png
Attachment 2: run60_calimero_mm1X_spectra.png
run60_calimero_mm1X_spectra.png
FixedTEST Tue Mar 5 15:53:04 2019 iulian MarleneMUST2SoftwareN/ACalimero problems
problems with Calimero solved by killing some processes on lpcgrit related with Narval.
to find the processes on lpcgrit:
ps aux | grep Cali*
ps aux | grep Narval

kill -9 all the ids

Other possible solution:

start_acq on lpcgrit
tk followed by kall
exit
FixedTEST Tue Mar 5 16:20:11 2019 iulian MarleneMUST2SoftwareN/Arun 77 Gamme 600 ns Time Calibration run (Calimero) on MUVI 3 MM1 X . good run
Run 76


Calimero on Muvi3 MM1(X)

Gamme 600 ns

Procedure:

0) HT on the detectors Off
1) Apply Das config
2) Put Das offline
3) Start Geco
4) Activate on each of the sector to calibrate the X side (see bellow image)
5) execute Calimero.exe in calimero directory
6) modify the calimero config on Geco (see bellow near config button)
7) Start the run in RCC
8) Start calimero (start button in Geco)
Attachment 1: run77_calimero_mm1X_spectra.png
run77_calimero_mm1X_spectra.png

ELOG Home Page