MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 87 of 132  Not logged in MUGAST
    Fixed, e786s, Wed Jun 26 15:50:36 2019, OttoRun, RUN, General, Cryo-3He, Run60 run60_6.png

OttoRun wrote:

OttoRun wrote:
*************************
Run : 60
*************************

Start at 2019-06-26 10:21:51.572979

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Restarted GTS Tree by Emmanuel


No Beam since 15:00. According to PCP there will be no beam for a while.
Fixed, e786s, Wed Jun 26 16:59:07 2019, Louis, BEAM, General, Cryo-3He, Beam interuption 
Beam stopped from 15h to 17h due to source instabilities
Fixed, e786s, Wed Jun 26 18:12:18 2019, OttoRun, RUN, General, Cryo-3He, Run62 
*************************
Run : 62
*************************

Start at 2019-06-26 18:09:42.882502

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Crate in System faillure.
Moving FIFO FPMW to other crate. Had to change the cable (3ns to 5ns).
To be accounted for in the TOF

Stop at 2019-06-27 02:19:17.492600
Stop comment: Problems with AGATA, run stopped
Fixed, e786s, Wed Jun 26 20:46:20 2019, Sylvain, Louis, RUN, General, Cryo-3He, run 62 screenshots 18x
Fixed, e786s, Thu Jun 27 00:26:37 2019, mugast, OFFLINE, General, , statistics until now cqnvqs_.png
Maybe some stat still to recover from better gate and mass and Z reconstruction.

Andrea
Fixed, e786s, Thu Jun 27 03:33:26 2019, OttoRun, RUN, General, Cryo-3He, Run63 
*************************
Run : 63
*************************

Start at 2019-06-27 03:33:09.910218

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Crate in System faillure.
Moving FIFO FPMW to other crate. Had to change the cable (3ns to 5ns).
To be accounted for in the TOF

%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
Current ~ 30 kHz.
The cryo target pressure and temperature have slightly increased during the stop for the recover of AGATA, even before the refilling of the LHe tank.
It is probably due to a problem in the refilling of liquid nitrogen.

Stop at 2019-06-27 11:46:17.108352
Stop comment: stop
Fixed, e786s, Thu Jun 27 12:28:58 2019, OttoRun, RUN, General, Cryo-3He, Run67 
*************************
Run : 67
*************************

Start at 2019-06-27 12:28:26.879061

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Crate in System faillure.
Moving FIFO FPMW to other crate. Had to change the cable (3ns to 5ns).
To be accounted for in the TOF

Stop at 2019-06-27 12:46:41.949098
Stop comment:
Fixed, e786s, Thu Jun 27 16:35:45 2019, OttoRun, RUN, General, Cryo-3He, Run68 
*************************
Run : 68
*************************

Start at 2019-06-27 16:35:24.351472

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Fixed, e786s, Thu Jun 27 16:41:55 2019, OttoRun, RUN, General, Cryo-3He, Run65 
*************************
Run : 65
*************************

Start at 2019-06-27 11:35:21.078920

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Crate in System faillure.
Moving FIFO FPMW to other crate. Had to change the cable (3ns to 5ns).
To be accounted for in the TOF

Stop at 2019-06-27 17:39:22.529443
Stop comment:
Fixed, e786s, Thu Jun 27 17:43:15 2019, OttoRun, RUN, General, Cryo-3He, Run69 
*************************
Run : 69
*************************

Start at 2019-06-27 17:42:38.280555

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG


Test with only MUGAST back trigger

Stop at 2019-06-27 17:54:02.829540
Stop comment:
Fixed, e786s, Thu Jun 27 17:59:20 2019, OttoRun, RUN, General, Cryo-3He, Run70 
*************************
Run : 70
*************************

Start at 2019-06-27 17:58:29.855367

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

back to normal

Stop at 2019-06-27 18:37:51.816766
Stop comment: type your message here
Fixed, e786s, Thu Jun 27 18:48:51 2019, OttoRun, RUN, General, Cryo-3He, Run71 
*************************
Run : 71
*************************

Start at 2019-06-27 18:47:56.171341

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- MG
- square (not biased)
- M2


all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

Stop at 2019-06-27 20:23:56.630240
Stop comment:
Fixed, e786s, Thu Jun 27 20:26:27 2019, OttoRun, RUN, General, Cryo-3He, Run73 
*************************
Run : 73
*************************

Start at 2019-06-27 20:26:17.916314

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

There is no run 72

Stop at 2019-06-27 23:04:45.884452
Stop comment: AGATA DAQ is rejectting all events
Fixed, e786s, Thu Jun 27 23:28:30 2019, OttoRun, RUN, General, Cryo-3He, Run74 
*************************
Run : 74
*************************

Start at 2019-06-27 23:25:00.455575

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

Stop at 2019-06-28 09:31:40.775271
Stop comment:
Fixed, e786s, Fri Jun 28 04:21:48 2019, Daniele Mengoni, RUN, General, Cryo-3He, run 74 18x
screenshots run 74 attached

frequent error message on the FP DC Wi1 --> defqlt. The elog said so, card tripped, but spectra are still present .. puzzling
    Fixed, e786s, Fri Jun 28 08:54:50 2019, Freddy, RUN, General, Cryo-3He, run 74 

Daniele Mengoni wrote:
screenshots run 74 attached

frequent error message on the FP DC Wi1 --> defqlt. The elog said so, card tripped, but spectra are still present .. puzzling




Put the voltage back at 8h00 when i arrived.
Fixed, e786s, Fri Jun 28 08:57:21 2019, Freddy, CATS, General, Cryo-3He, CATS scaler not compatible with beam rate ScalerCATSproblem.png
The CATS scaler si now around 100-120 kHz while the beam rate is still 40 kHz.

I checked the CATS signal and there is clearly noise who induce double logic signals. Not all of them are validated by FAG.

We should raise the threshold- call sebastien

9h32 : Stop beam to enter and raise the threshold.
Fixed, e786s, Fri Jun 28 09:56:59 2019, Bertrand, Valerian and Adrien, BEAM, General, N/A, Dipole stopped in the morning? 
Dipole restart at 10. Shoudl be checked with time stamp.
Fixed, e786s, Fri Jun 28 10:00:25 2019, OttoRun, RUN, General, Cryo-3He, Run75 
*************************
Run : 75
*************************

Start at 2019-06-28 09:59:59.505010

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

CATS threshold raised

Stop at 2019-06-28 14:33:09.843668
Stop comment:
Fixed, e786s, Fri Jun 28 15:25:12 2019, OttoRun, RUN, General, Cryo-3He, Run76 
*************************
Run : 76
*************************

Start at 2019-06-28 15:24:51.867946

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

beam back. Q pole issues still

Stop at 2019-06-28 16:55:27.258794
Stop comment:

ELOG Home Page