*************************
Run : 62
*************************
Start at 2019-06-26 18:09:42.882502
target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Crate in System faillure.
Moving FIFO FPMW to other crate. Had to change the cable (3ns to 5ns).
To be accounted for in the TOF
Stop at 2019-06-27 02:19:17.492600
Stop comment: Problems with AGATA, run stopped |