*************************
Run : 63
*************************
Start at 2019-06-27 03:33:09.910218
target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Crate in System faillure.
Moving FIFO FPMW to other crate. Had to change the cable (3ns to 5ns).
To be accounted for in the TOF
%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
Current ~ 30 kHz.
The cryo target pressure and temperature have slightly increased during the stop for the recover of AGATA, even before the refilling of the LHe tank.
It is probably due to a problem in the refilling of liquid nitrogen.
Stop at 2019-06-27 11:46:17.108352
Stop comment: stop |