Fixed, e786s, Tue Jun 25 08:23:58 2019, Valerian , BEAM, General, N/A, Beam status
|
Currently there is no beam since 22h-> Thunder + no more 48Ca sample. The sample was out during the night.
The "sourcier" on-call arrived at 8h15. By talking to people in shift at the PCP they told me that more will be known ~10am-11am. Beam is expected to be back around 12am.
|
Fixed, e786s, Tue Jun 25 10:51:59 2019, OttoRun, RUN, General, 152Eu, Run57
|
*************************
Run : 57
*************************
Start at 2019-06-25 10:50:03.672363
152Eu source @ AGATA
Stop at 2019-06-25 14:36:40.442175
Stop comment: end ; source removed |
Fixed, e786s, Tue Jun 25 11:55:12 2019, mugast, OFFLINE, General, Cryo-3He, Here is the F***G gs
|
We added the correct deformation of the target thickness, and corrected for it with the angle dependance.
15 um Water
Correct beam energy
Correct target position
Run 56 only |
Fixed, e786s, Tue Jun 25 15:33:40 2019, A Lemasson, VAMOS, General, , VAMOS Analysis - Brho 8x
|
VAMOS Analysis :
VAMOS PID with attached SetAlias.C
Suggestion to change Brho from 1.05 to 0.95 based on the distribution of K ions to optimize acceptance on the K
ions |
Fixed, e786s, Tue Jun 25 16:58:53 2019, OttoRun, RUN, General, Cryo-3He, Run58
|
========================================
*************************
Run : 58
*************************
Start at 2019-06-25 16:56:44.425517
target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Beam is back
scaler_run_58.png taken at the beginning of the run.
Stop at 2019-06-26 05:02:52.980409
Stop comment: |
Fixed, e786s, Tue Jun 25 18:14:38 2019, OttoRun, RUN, General, Cryo-3He, Run58
|
OttoRun wrote: | *************************
Run : 58
*************************
Start at 2019-06-25 16:56:44.425517
target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Beam is back
scaler_run_58.png taken at the beginning of the run. |
In the CATS position spectra the central part is missing.
It is possible that the gain is two high for the actual high intensity of the beam. |
Fixed, e786s, Tue Jun 25 22:20:36 2019, Franco, RUN, General, Cryo-3He, Run58
|
OttoRun wrote: |
OttoRun wrote: | *************************
Run : 58
*************************
Start at 2019-06-25 16:56:44.425517
target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Beam is back
scaler_run_58.png taken at the beginning of the run. |
In the CATS position spectra the central part is missing (maybe for the high intensity of the beam?).
We can anyway recover the time information.
After the decrease of the high voltage of VAMOS drift chamber to avoid saturation of the signals
the BRho resolution has worsened of about 25% (see attachment). We will now increase it again (h. 22.30). |
Fixed, e786s, Tue Jun 25 23:55:34 2019, Franco, RUN, General, Cryo-3He, Run58
|
Franco wrote: |
OttoRun wrote: |
OttoRun wrote: | *************************
Run : 58
*************************
Start at 2019-06-25 16:56:44.425517
target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Beam is back
scaler_run_58.png taken at the beginning of the run. |
scaler_run_58.png is taken after 7h. |
In the CATS position spectra the central part is missing (maybe for the high intensity of the beam?).
We can anyway recover the time information.
After the decrease of the high voltage of VAMOS drift chamber to avoid saturation of the signals
the BRho resolution has worsened of about 25% (see attachment). We will now increase it again (h. 22.30). |
|
Fixed, e786s, Wed Jun 26 03:46:09 2019, Freddy, RUN, General, Cryo-3He, Run 58 -screenshots 6x
|
Screenshots at 3h30 on the 26th of june during RUN 58 |
Fixed, e786s, Wed Jun 26 03:55:20 2019, Freddy, OFFLINE, General, N/A, Run conversion with AGATA
|
To convert a run including the AGATA data, here is the procedure (Only if you know reasonably what you are doing 
1- Go to the AGATA Analysis computer, open a terminal and execute the following commands:
> a4
> t e786s
> cd Replay
> ./do_global_replay.sh -run ## (## is the run number you want to convert)
2- When it is finished copy the root file to the GANIL world:
> mkdir /dataganil/e786s/acquisition/root_agata/run_00##/
> cp ./run_00##/Out/Analysis/Tree_00*.root /dataganil/e786s/acquisition/root_agata/run_00##/. |
Fixed, e786s, Wed Jun 26 04:54:07 2019, Freddy, AGATA, General, N/A, AGATA validation problem (solved)
|
Since about 4h20, we realized that AGATA validated events and timestamps have suddenly dropped on the AGATA display (yellow bars instead of green).
We checked the counting rate on MUGAST, VAMOS and FAG and there is no obvious problem on this side. Same for the MUGAST/VAMOS data on disk.
We call Emmanuel...
Problem solved by restarting entirely GTS Tree (that was broken).
Restarted at 5h37 with run 59. (it took about 30 min). |
Fixed, e786s, Wed Jun 26 05:33:50 2019, OttoRun, RUN, General, Cryo-3He, Run59
|
*************************
Run : 59
*************************
Start at 2019-06-26 05:32:53.325868
target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
5 to 5h30 - Restarted GTS Tree by Emmanuel
6h00 - Validation broken again
Stop at 2019-06-26 09:44:56.521500
Stop comment: Stopping to Realign GTS Tree |
Fixed, e786s, Wed Jun 26 05:58:23 2019, Freddy, OFFLINE, General, N/A, Offline analysis run 56 and 58   
|
|
Fixed, e786s, Wed Jun 26 07:01:00 2019, Freddy, AGATA, General, N/A, AGATA validation problem - again - during run 59
|
30 min after Emmanuel left (around 6h00), the AGATA problem of validation reappeared...
TO BE SOLVED.... |
Fixed, e786s, Wed Jun 26 07:04:06 2019, Freddy, CATS, General, N/A, Update of CATS calibrations 
|
New calibrations in :
/home/mugast/analysis/nptool/Projects/calibration/cats/CATS2_X.vamos2019_e786s.npt
/home/mugast/analysis/nptool/Projects/calibration/cats/CATS2_X.vamos2019_e786s.npt
Calibration.txt was modified accordingly.
Attached are the CATS positions for run 56 and 58 (after the central strip problem) |
Fixed, e786s, Wed Jun 26 09:56:17 2019, Valerian and Adrien, RUN, General, Cryo-3He, Identification E-TOF MUGAST 
|
Light particle ID in MUGAST (no S1 because shitty time).
The red cut is on what we believe is deuterium.
The containt of the cut stop at 8MeV when gating on vamos. |
Fixed, e786s, Wed Jun 26 10:29:30 2019, OttoRun, RUN, General, Cryo-3He, Run60
|
========================================
*************************
Run : 60
*************************
Start at 2019-06-26 10:21:51.572979
target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Restarted GTS Tree by Emmanuel
Stop at 2019-06-26 17:59:14.820418
Stop comment: change of Brho |
Fixed, e786s, Wed Jun 26 13:48:35 2019, mugast, OFFLINE, General, Cryo-3He, analysis
|
|
Fixed, e786s, Wed Jun 26 14:40:58 2019, OttoRun, RUN, General, Cryo-3He, Run60 6x
|
OttoRun wrote: | *************************
Run : 60
*************************
Start at 2019-06-26 10:21:51.572979
target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Restarted GTS Tree by Emmanuel |
|
Fixed, e786s, Wed Jun 26 15:48:50 2019, OttoRun, RUN, General, Cryo-3He, Run60
|
OttoRun wrote: |
OttoRun wrote: | *************************
Run : 60
*************************
Start at 2019-06-26 10:21:51.572979
target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Restarted GTS Tree by Emmanuel |
|
No beeam from 15.00. According to PCP, there will be no beam for a while |
|
|