MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST  Not logged in MUGAST
Entry  Tue Jun 25 16:58:53 2019, OttoRun, e786s, RUN, General, Fixed, Cryo-3He, Run58 
    Reply  Tue Jun 25 18:14:38 2019, OttoRun, e786s, RUN, General, Fixed, Cryo-3He, Run58 cats_run_58.png
       Reply  Tue Jun 25 22:20:36 2019, Franco, e786s, RUN, General, Fixed, Cryo-3He, Run58 BRho_run58.png
          Reply  Tue Jun 25 23:55:34 2019, Franco, e786s, RUN, General, Fixed, Cryo-3He, Run58 scaler_run_58_2.png
Message ID: 4623     Entry time: Tue Jun 25 22:20:36 2019     In reply to: 4622     Reply to this: 4628
Author: Franco 
ExpNbr: e786s 
Type: RUN 
Category: General 
Status: Fixed 
Target-Source: Cryo-3He 
Subject: Run58 

OttoRun wrote:

OttoRun wrote:
*************************
Run : 58
*************************

Start at 2019-06-25 16:56:44.425517

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Beam is back
scaler_run_58.png taken at the beginning of the run.


In the CATS position spectra the central part is missing (maybe for the high intensity of the beam?).
We can anyway recover the time information.

After the decrease of the high voltage of VAMOS drift chamber to avoid saturation of the signals
the BRho resolution has worsened of about 25% (see attachment). We will now increase it again (h. 22.30).
Attachment 1: BRho_run58.png  113 kB  Uploaded Tue Jun 25 23:23:52 2019  | Hide | Hide all
BRho_run58.png

ELOG Home Page