Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Text |
 |
Fixed | e744s |
Sat Apr 13 15:25:56 2019 |
Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, Catalin | ONLINE | General | CH2 | Scalers v8 for run122.1 | "1_" added to screenshot filenames to indicate
automatic file opening |
|
Fixed | e744s |
Sat Apr 13 17:03:14 2019 |
Jérémie & François | OFFLINE | General | | first gamma spectrum | After a few hours run. |
|
Fixed | e744s |
Sat Apr 13 17:36:39 2019 |
mugast | RUN | General | CH2 | run 124 | 16:30 start run 124
brho is being set
|
|
Fixed | e744s |
Sat Apr 13 18:00:12 2019 |
Sylvain | RUN | General | CH2 | Log & Scalers -- Run 122 at 17:45 | Log for run 122 taken at 17h45 |
20x |
Fixed | e744s |
Sat Apr 13 19:27:16 2019 |
Beyhan, Jaromir | OTHER | General | N/A | Spreadsheet with a list of runs up to 122 | Resides also in home directory
runs_list.ods
|
    |
Fixed | e744s |
Sat Apr 13 20:02:36 2019 |
Sylvain | RUN | General | CH2 | Log & Scalers -- Run 122 at 19:45 | Log & Scalers -- Run 122 at 19:45 |
21x |
Fixed | e744s |
Sat Apr 13 20:16:05 2019 |
Diego | VAMOS | General | | Vamos Efficiency | ***************************************RUN
118************************************************
|
|
Fixed | e744s |
Sat Apr 13 20:37:16 2019 |
Beyhan | OTHER | General | | Alarm in G2 | Alarm signal from G2.
No beam since 20:30
PCP will have a look in G2, following the |
|
Fixed | e744s |
Sat Apr 13 21:23:28 2019 |
OttoRun | RUN | General | CH2 | Run121 | ========================================
*************************
[SIZE=3][B]Run : 121[/B][/SIZE]
|
|
Fixed | e744s |
Sat Apr 13 21:34:02 2019 |
Adrien Matta -> update Iulian | RUN | General | N/A | Inconsistent info in the run message-fix explained in reply | Be careful to fill in correctly all info in
the start run message.
|
|
Fixed | e744s |
Sat Apr 13 21:47:40 2019 |
Sylvain | RUN | General | CH2 | Log & Scalers -- Run 122 at 21:45 | |
20x |
Ongoing | e744s |
Sat Apr 13 21:57:48 2019 |
Adrien Matta | RUN | General | N/A | Inconsistent info in the run message | [quote="Adrien Matta"]Be careful to fill in
correctly all info in the start run message.
|
|
Fixed | e744s |
Sat Apr 13 22:04:32 2019 |
Adrien Matta | RUN | General | N/A | Inconsistent info in the run message | [quote="Adrien Matta"]Be careful to fill in
correctly all info in the start run message.
|
|
Fixed | e744s |
Sat Apr 13 22:10:37 2019 |
OttoRun | RUN | General | CH2 | Run121 | [quote="OttoRun"]*************************
[SIZE=3][B]Run : 121[/B][/SIZE]
*************************
|
|
Fixed | e744s |
Sat Apr 13 22:40:00 2019 |
Diego | VAMOS | General | | Saturation in the WIRES of Drift chamber due to Pile-Up | There is Saturation in the Energy of the WIRES
due to the Pile-up, it is not urgent to correct
it because these parameters are not needed |
|
Fixed | e744s |
Sat Apr 13 23:02:27 2019 |
Valerian, Freddy and Iulian | OFFLINE | General | CH2 | Very preliminary results for two protons | Join are very preliminary spectra for the
two protons events gated on 13N in VAMOS
with a multiplicity 2 event in MUST2. |
|
Fixed | e744s |
Sat Apr 13 23:25:14 2019 |
iulian | RUN | General | N/A | Inconsistent info in the run message | This inconsistency has been addressed
[quote="Adrien Matta"][quote="Adrien Matta"]Be
careful to fill in correctly all info in |
|
Fixed | e744s |
Sun Apr 14 00:06:05 2019 |
Chloé, Fairouz, Sylvain, Damien | RUN | General | CH2 | Log & Scalers -- Run 122 at 00:06 | |
20x |
Fixed | e744s |
Sun Apr 14 02:04:32 2019 |
Faïrouz, Chloé, Sylvain & Damien | RUN | General | CH2 | Beam lost | Beam stopped because of the HF of C01.
L'astreinte va venir. Arrêt estimé une demi-heure
ou plus.
|
19x |
Fixed | e744s |
Sun Apr 14 04:04:33 2019 |
Faïrouz, Chloé, Sylvain, Damien & Iulia | RUN | General | CH2 | Beam is back @ 3e4 pps in CATS | |
|