MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST  Not logged in MUGAST
Message ID: 4186     Entry time: Sat Apr 13 22:40:00 2019
Author: Diego 
ExpNbr: e744s 
Type: VAMOS 
Category: General 
Status: Fixed 
Target-Source:  
Subject: Saturation in the WIRES of Drift chamber due to Pile-Up 
There is Saturation in the Energy of the WIRES due to the Pile-up, it is not urgent to correct it because these parameters are not needed for the reconstruction. Tomorrow morning, when stopping the run, we should change the offsets in NUMEXO in order to better allocate the amplitude of the signals.
Attachment 1: DC_Wire_saturation.png  142 kB  Uploaded Sat Apr 13 23:41:23 2019  | Hide | Hide all
DC_Wire_saturation.png

ELOG Home Page