MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST  Not logged in MUGAST
Message ID: 4171     Entry time: Sat Apr 13 20:16:05 2019
Author: Diego 
ExpNbr: e744s 
Type: VAMOS 
Category: General 
Status: Fixed 
Target-Source:  
Subject: Vamos Efficiency 
***************************************RUN 118************************************************

Forward (condition by before)
IC 0 95.6667%
IC 1 95.4542%
IC 2 95.513%
IC 3 93.2396%
----------------------
Backward (condition by after)
IC 1 95.9352%
IC 2 94.2267%
IC 3 96.2866%
IC 4 83.0393% //not reliable
----------------------
DC (condition by IC[0])
DC 0 93.0557%
DC 1 92.6187%
DC 2 88.9858%
DC 3 96.6774%
----------------------
DC X (condition by IC[0])
DCX0 93.707%
DCX1 93.0192%
DCX2 94.2166%
DCX3 94.1586%
----------------------
Xf (condition by IC[0])
Xf 95.0046%
----------------------


***************************************RUN 119************************************************
Forward (condition by before)
IC 0 95.2904%
IC 1 95.071%
IC 2 94.9271%
IC 3 93.1055%
----------------------
Backward (condition by after)
IC 1 95.0696%
IC 2 91.6524%
IC 3 90.644%
IC 4 81.9769% //not reliable
----------------------
DC (condition by IC[0])
DC 0 90.7155%
DC 1 90.3863%
DC 2 87.0165%
DC 3 94.7584%
----------------------
DC X (condition by IC[0])
DCX0 88.1504%
DCX1 87.6396%
DCX2 88.7515%
DCX3 88.2139%
----------------------
Xf (condition by IC[0])
Xf 83.22%
----------------------

***************************************RUN 122_0************************************************

Forward (condition by before)
IC 0 95.2443%
IC 1 95.2177%
IC 2 94.8111%
IC 3 92.0637%
----------------------
Backward (condition by after)
IC 1 95.3114%
IC 2 91.8716%
IC 3 90.9907%
IC 4 79.8954% //not reliable
----------------------
DC (condition by IC[0])
DC 0 87.9765%
DC 1 87.8112%
DC 2 83.8229%
DC 3 93.3538%
----------------------
DC X (condition by IC[0])
DCX0 86.4654%
DCX1 86.8069%
DCX2 87.0654%
DCX3 86.5511%
----------------------
Xf (condition by IC[0])
Xf 80.1623%
----------------------

***************************************RUN 122_1************************************************
Forward (condition by before)
IC 0 94.9153%
IC 1 94.9217%
IC 2 94.5962%
IC 3 91.8891%
----------------------
Backward (condition by after)
IC 1 95.0787%
IC 2 91.7874%
IC 3 91.1441%
IC 4 79.9685% //not reliable
----------------------
DC (condition by IC[0])
DC 0 87.4807%
DC 1 87.3732%
DC 2 83.3638%
DC 3 92.8772%
----------------------
DC X (condition by IC[0])
DCX0 85.8206%
DCX1 86.2137%
DCX2 86.5489%
DCX3 85.9571%
----------------------
Xf (condition by IC[0])
Xf 79.0635%
----------------------

There is a continuous decrease of efficiency in the Drift Chamber. The efficiency of IC is also not optimal. I suspect that with this beam intensity (5x10^4 in VAMOS) detectors may start to suffer some damage. If the efficiency keeps decreasing we need to consider to reduce the beam intensity.

In order to check the efficiency, there is a script in /home/mugast/Analysis_e744 called EffCheck.C

Open a root file: root -l RootA/r0XXX_XXXa.root
Load the script: .L EffCheck.C
Launch the script: EffCheck() (the calculation is automatic)

ELOG Home Page