MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 63 of 132  Not logged in MUGAST
    Fixed, e775s, Wed Feb 26 15:12:02 2020, Marlène, RUN, General, , RUN 137 8x
Screenshots of RUN137

[quote="Marlène"]RUN 137
Fixed, e775s, Mon Feb 24 17:14:57 2020, mugast, RUN, General, CD2, RUN 124 run124_Tof.png
*************************
Run : 124
*************************
Fixed, TEST, Sun Feb 23 20:50:06 2020, Marlène, GRIT, General, , RUN 115  8x
Screenshots from MUGAST

The impact matrix looks fine but there are sectors missing but in the raw we see 13 sectors (instead of 16)
Fixed, e768s, Fri Jul 19 01:05:26 2019, mugast, RUN, General, , RUN 108  
Brho Change to 0.556 Tm 

Moving Plate : Final Position +7mm
Fixed, e768s, Fri Jul 19 00:59:20 2019, mugast, RUN, General, , RUN 107 - Reference Target Run 
Reference Target Run after beam tuning
Brho 0.5854 Tm
Fixed, e768s, Tue Jul 16 19:21:19 2019, mugast, OTHER, General, , Qpole values 
Brho = 0.640 Tm

RMN = 3247,742 Gaus (215.630 A)
Fixed, e793s, Fri Mar 12 10:52:46 2021, Adrien, VAMOS, Hardware, N/A, Q pole trip in vamos 
Q-Pole tripped this night around 4am at the same time as the dipole but was switch on again only at 9am.
Fixed, TEST, Tue Dec 3 18:14:45 2019, Marlène & Franco, GRIT, Hardware, , Pulser test of new board 
The new board that will be installed for MG2 has been tested and validated with a pulser outside of the chamber.
Fixed, TEST, Fri Feb 5 12:44:42 2021, Franco, GRIT, Hardware, N/A, Pulser on MG11 MUFEE Y pulser_all_channels_MG11Y_05022021.pngpulser_all_strips_MG11Y_05022021.pngWorking_rings_annular_05022021.png
I managed to obtain the spectrum with the pulser on the annular (Y side, namely sectors).
The raw strip numbers where I should have the 16 sectors are: 14, 16, 18, 20, 22, 24, 26, 28, 36, 38, 40, 42, 44, 46, 48 and 50.
The 5 strips I could see with the alpha source are: 20, 40, 44, 48, 50.
Fixed, e768s, Sat Jul 13 16:28:30 2019, Diego Ramos, OTHER, General, N/A, Proton ToF from VAMOS ToF reconstruction TOF_VAMOS.png
Comparison between the Proton ToF measured directly with the TAC between MUST and CATS (left) and the one recontructed from the time diference between the
time MUGAST-VAMOS and the time Target-VAMOS (recontructed from the Brho) (right)
Fixed, e768s, Mon Jul 22 17:07:39 2019, Marlène, Franck, François & Nicolas, BEAM, General, , Profiler conditions for measuring beam intensity 
We checked that the measured beam intensity (present case 1.5e7 pps) is independent on the voltage on the profiler. Values from 93 V up to 177 V gave similar
results.
Fixed, e768s, Tue Jul 23 12:00:25 2019, Christian, BEAM, General, LiF, Profiler and beam current scaling since 11;10 
See also AGATA elog and run-log entry
Fixed, e744s, Fri Apr 12 10:36:09 2019, Valerian, RUN, General, N/A, Procedure to follow during runs 
[SIZE=4][B][SIZE=3]At the beginning of a run :
[/B]
[LIST]
Fixed, e786s, Mon Jun 24 01:52:00 2019, Louis, OFFLINE, Software, Cryo-3He, Procedure to convert and calibrate runs 

Here is the updated procedure to convert a run, with VAMOS data.
Fixed, e768s, Fri Jul 19 15:11:10 2019, mugast, OFFLINE, General, , Procedure for run conversion and analysis 
Here is the procedure to convert a run with VAMOS and AGATA data and add those data to the Kinematic plot.

Every 4GB there will be a file change, to see if there is a file change type:
Fixed, TEST, Thu Feb 4 18:16:47 2021, Franco, GRIT, Hardware, 3-alpha, Problems with the annular persist 8x
We opened the chamber to verify the connections of the kaptons but they were all well connected. We checked with the tester the conductivity of the kapton
YA5 and it was fine so we excluded any problem related to the kapton. The boards are working properly (the pulser is well seen). We have to conclude that
the problem comes from the detector. We made another alpha source run and indeed the result is the same as yesterday -> 5 sectors working on Y. We also
Pending, e793s, Sat Mar 13 05:11:08 2021, Faïrouz, Juan Lois, AGATA, Software, CD2, Problem with AGATA acquisition started at 4h40 run61-scalers_5h19.png

There is a problem with AGATA Acquisition. All the bars in the global status & control are yellow!!! 
This problem started at 4h40. 
Fixed, e768s, Thu Jul 25 12:55:19 2019, mugast, AGATA, General, LiF, Problem Crystal 00A during run 140 
Problem with crystal 00A at 12h50:
- Very large counting rate 300 k
Ongoing, e793s, Wed Mar 10 21:09:25 2021, mugast (Adrien, Nigel et co), BEAM, General, , Primary beam issues 

The secondary beam intensity has been fluctuating around 4 - 5 x 10**5 Hz most of the evening.  15 mins ago it was realised that it had dropped off to
only 1 x 10**5 Hz.  As suspected, PCP confirmed that primary beam intensity has dropped off.  They are investigating ...
    Fixed, e768s, Sat Jul 20 11:33:01 2019, Christian, OTHER, General, , Previous Papers - gamma decays from states in the 4-MeV region 1-s2.0-0375947473901541-main.pdf
This search was triggered by our lack of seeing the 3958keV line at the expected level. 2689 keV line observed (runs 112,115,116) as 55-60 counts. Expected
yield in 3958 keV line based on 80:20 branching and 1.5:1.0 efficiency is 10 counts. We see (at most) 2 in the full photo-peak for this line. (Theses two
counts are also lower than expected by about 20 keV.)

ELOG Home Page