MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 55 of 132  Not logged in MUGAST
Fixed, e744s, Sat Apr 13 13:58:08 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, BEAM, Hardware, CH2, beam rate (read from CATS) as a function of time rate_vs_time.pdf
 
Fixed, e744s, Sat Apr 13 14:19:41 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, ONLINE, General, CH2, Scalers run122_scalers_v7.png
 
Fixed, e744s, Sat Apr 13 14:28:00 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, BEAM, General, CH2, PCP information - beam interruption 
beam interrupted to an octupole (?) failure - prevision to be back after 10-15 min (PCB info)

14:35 h beam is back
Fixed, e744s, Sat Apr 13 15:25:56 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, Catalin, ONLINE, General, CH2, Scalers v8 for run122.1 run122_1_scalers_v8.png
"1_" added to screenshot filenames to indicate automatic file opening
Fixed, e744s, Sat Apr 13 15:31:32 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, Catalin, ONLINE, Social, CH2, Screenshots run 122.1 v6 20x
"1_" added to screenshot filenames to indicate automatic file opening
Fixed, e744s, Sat Apr 13 17:03:14 2019, Jérémie & François, OFFLINE, General, , first gamma spectrum 35gamma.png
After a few hours run.
Fixed, e744s, Sat Apr 13 17:31:54 2019, mugast, VAMOS, Hardware, , new Threshold on DC1 Channel 127 
Channel 127 of DC1 had a reduction of gain from yesterday, I corrected the gain by calibration and I reduced the threshold from 2114 to 2083 in order to
reach the same low level.
(We can still see the lower gain in the online because the watcher is not reloaded, but it is ok in the root files) 
Fixed, e744s, Sat Apr 13 17:36:39 2019, mugast, RUN, General, CH2, run 124 
16:30 start run 124

brho is being set
Fixed, e744s, Sat Apr 13 18:00:12 2019, Sylvain, RUN, General, CH2, Log & Scalers -- Run 122 at 17:45 20x
Log for run 122 taken at 17h45
Fixed, e744s, Sat Apr 13 19:27:16 2019, Beyhan, Jaromir, OTHER, General, N/A, Spreadsheet with a list of runs up to 122  runs_list.odsruns_list.odsruns_list.odsruns_list.odsruns_list.ods
Resides also in home directory
runs_list.ods
Fixed, e744s, Sat Apr 13 20:02:36 2019, Sylvain, RUN, General, CH2, Log & Scalers -- Run 122 at 19:45 21x
Log & Scalers -- Run 122 at 19:45
Fixed, e744s, Sat Apr 13 20:16:05 2019, Diego, VAMOS, General, , Vamos Efficiency 
***************************************RUN 118************************************************

Forward (condition by before)
Fixed, e744s, Sat Apr 13 20:37:16 2019, Beyhan, OTHER, General, , Alarm in G2 
Alarm signal from G2.
No beam since 20:30
PCP will have a look in G2, following the procedures. 
Fixed, e744s, Sat Apr 13 21:23:28 2019, OttoRun, RUN, General, CH2, Run121 
========================================
*************************
  [SIZE=3][B]Run  : 121[/B][/SIZE]
Fixed, e744s, Sat Apr 13 21:34:02 2019, Adrien Matta -> update Iulian, RUN, General, N/A, Inconsistent info in the run message-fix explained in reply 
Be careful to fill in correctly all info in the start run message.

[B]There is inconsistency in run 121 comment (target 2) and list (target 3).
Fixed, e744s, Sat Apr 13 21:47:40 2019, Sylvain, RUN, General, CH2, Log & Scalers -- Run 122 at 21:45 20x
 
    Ongoing, e744s, Sat Apr 13 21:57:48 2019, Adrien Matta, RUN, General, N/A, Inconsistent info in the run message 
[quote="Adrien Matta"]Be careful to fill in correctly all info in the start run message.

[B]There is inconsistency in run 121 comment (target 2) and list (target 3).
    Fixed, e744s, Sat Apr 13 22:04:32 2019, Adrien Matta, RUN, General, N/A, Inconsistent info in the run message 
[quote="Adrien Matta"]Be careful to fill in correctly all info in the start run message.

[B]There is inconsistency in run 121 comment (target 2) and list (target 3).
    Fixed, e744s, Sat Apr 13 22:10:37 2019, OttoRun, RUN, General, CH2, Run121 
[quote="OttoRun"]*************************
  [SIZE=3][B]Run  : 121[/B][/SIZE]
*************************
Fixed, e744s, Sat Apr 13 22:40:00 2019, Diego, VAMOS, General, , Saturation in the WIRES of Drift chamber due to Pile-Up DC_Wire_saturation.png
There is Saturation in the Energy of the WIRES due to the Pile-up, it is not urgent to correct it because these parameters are not needed for the reconstruction.
Tomorrow morning, when stopping the run, we should change the offsets in NUMEXO in order to better allocate the amplitude of the signals. 

ELOG Home Page