Fixed, TEST, Tue Mar 5 18:03:24 2019, iulian Marlene, MUST2, Software, N/A, Calimero problem on Y side run83_calimero_mm4Y_spectra.pngrun834calimero_mm2Y_spectra.png
Calimero not working properly on Y side of any mm detector
Fixed, TEST, Tue Mar 5 18:18:46 2019, iulian Marlene, MUST2, Hardware, 3-alpha, run 97 3a run Muvi3 night run  run87_3alpha_4mm_spectra.png
Run 87

stop@ 5:42 am
Fixed, TEST, Wed Mar 6 15:02:51 2019, Valerian, MUST2, Hardware, 3-alpha, Cooling temperature is relevant for the resolution MM2X_13deg.pngMM2X_minus5deg.png
Using run 52 -> 13deg and run 87 -> -5deg.

We see that the resolution improves at -5 degree. See attached picture as an example for MM2 X.
Fixed, TEST, Thu Mar 7 09:29:47 2019, Marlene, GRIT, General, , run 96 double alpha source run shifted 60mm  run96_MG7_MG11notworking.pngrun96_3alphasource_shifted_MG1-5.pngrun96_HV2.pngrun96_HV1.png
RUN 96

double alpha source 
Fixed, TEST, Thu Mar 7 14:02:03 2019, Marlène Iulian, MUST2, General, N/A, test of MUST2 electronics  
Test with pulser at 20 kHz
The OR of MUVI was scaled down by a factor of 100, to provoke some resets
Fixed, , Tue Mar 12 10:21:17 2019, Marlène, MUST2, General, , Debug Calimero Y test_GECO_masquage_mate2&10activees_seulement.png
Debug of Calimero

test of channels (mate) masking : OK with DAS, OK with GECCO (see attachment) when done in the "disable channels" of GECCO
Fixed, TEST, Mon Mar 18 18:31:18 2019, valerian marlène, GRIT, General, 3-alpha, RUN 20 (com2019) 3 alpha overnight RUN20_HV_MG_3lapha.pngRUN20_3alpha_HV_MUST2.png
RUN20

Run with double 3alpha source MUST2+MG1_7+MG11
Fixed, , Tue Mar 19 19:35:53 2019, marlene, GRIT, General, , RUN 98 3alpha source all detectors 
RUN 98
3 alpha source
all detectors (trap,square, MUST2,annular)
Fixed, TEST, Thu Mar 21 10:37:47 2019, Adrien and Valerian, MUST2, General, N/A, Test TOF must2 Time_behavior_withDAS.png
To make sure the mate work correctly we took an alpha run with a delayed fag on the MUVI stop:
 - all mate register a time in the the middle of the range as expected (fag delayed by 350ns, range is 600ns)
Fixed, TEST, Thu Mar 21 13:28:06 2019, Valerian and Adrien, DAQ, Software, N/A, First fully functionnal time calibration run on X and Y of MG1 CALIMEROY1.pngFIRST_TIMECALIBRATION_WITHOUT_CALIMERO.png
Our program is able to perform the time calibration of our detector for both X and Y, see picture attached.
Fixed, TEST, Fri Mar 22 17:28:09 2019, Otto, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
  - Run: 117
  - MUVI: MUVI1
Fixed, TEST, Fri Mar 22 17:37:37 2019, Otto, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
  - Run: 118
  - MUVI: MUVI1
Fixed, TEST, Fri Mar 22 17:47:04 2019, Otto, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
  - Run: 119
  - MUVI: MUVI2
Fixed, TEST, Fri Mar 22 17:56:37 2019, Otto, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
  - Run: 120
  - MUVI: MUVI2
Fixed, TEST, Fri Mar 22 18:06:11 2019, Otto, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
  - Run: 121
  - MUVI: MUVI3
Fixed, TEST, Fri Mar 22 18:15:39 2019, Otto, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
  - Run: 122
  - MUVI: MUVI3
Fixed, TEST, Sat Mar 23 15:26:06 2019, Adrien Matta, OTHER, Software, N/A, To do list 
[SIZE=2][B]FSC:[/B][/SIZE]
[LIST][COLOR=orange]
[*] Autoconf programme to set all regular parameter (PAC gain, TAC range, ORD, no mask, no pulser)[/COLOR]
Fixed, TEST, Wed Mar 27 11:06:33 2019, Valerian and Cyril, GRIT, Hardware, 3-alpha, Evolution of resolution with temperature MG4_13_deg.pngMG4_minus_4_deg.png
For the mugast telescope, changing the temperature from 13deg to minus 4deg doesn't seem to have an impact as strong as for the MUST2 telescopes.
Still, the resolution improve with a lower temperature, but the improvement is of only 0.1 channel... (See joined screenshots)
Fixed, TEST, Thu Mar 28 14:22:25 2019, OttoRun, RUN, General, N/A, TEST 
[SIZE=5][B] Run  : 146[/B][/SIZE]
[SIZE=4]  [B] Date : 28/03/2019[/B]
Fixed, TEST, Thu Mar 28 15:39:01 2019, Valerian, OFFLINE, Software, N/A, Status of the converion with VAMOS program 
The conversion with VAMOS program was validated using run_0020 from com2019